Southwest Airlines vuelo WN 3823: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Lun-Mie 06:40 San Diego (SAN) 1 08:05 Las Vegas Harry Reid (LAS) 1
WN 3823 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 06:40 San Diego (SAN) 1 08:05 Las Vegas Harry Reid (LAS) 1
WN 3823 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-12-20 through 2025-01-02
Dom 06:40 San Diego (SAN) 1 08:05 Las Vegas Harry Reid (LAS) 1
WN 3823 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2025-01-05
Dom 09:15 Nashville (BNA) 11:25 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 4:10 Operates only on 2024-09-01
Lun,Jue,Vie 10:55 Albuquerque (ABQ) 12:00 Long Beach (LGB)
WN 3823 Non-stop Boeing 737-800 (73H) 2:05 Valid until 2024-09-30
Dom 11:20 Montrose (MTJ) 12:15 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 0:55 Effective 2024-10-06 through 2024-10-27
Mar,Mie 11:40 Montrose (MTJ) 12:35 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 0:55 Effective 2024-10-08 through 2024-10-30
Lun,Jue,Vie 12:20 Montrose (MTJ) 13:15 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 0:55 Effective 2024-10-03 through 2024-10-28
Vie 12:20 Montrose (MTJ) 13:15 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 0:55 Operates only on 2024-11-01
Jue 12:45 San Jose (SJC) B 14:10 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2024-11-28
Dom 13:50 Albuquerque (ABQ) 14:50 Long Beach (LGB)
WN 3823 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-09-08 through 2024-09-29
Jue 14:05 Montrose (MTJ) 15:05 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 1:00 Operates only on 2024-10-31
Sab 14:25 Montrose (MTJ) 15:25 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 1:00 Effective 2024-10-05 through 2024-11-02
Dom 15:25 Long Beach (LGB) 16:35 San Jose (SJC) B
WN 3823 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-09-08 through 2024-09-29
Sab 17:05 San Jose (SJC) B 18:30 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-15 through 2025-03-01
Sab 17:15 San Jose (SJC) B 18:40 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-09 through 2024-11-16
Sab 17:15 San Jose (SJC) B 18:40 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-07 through 2024-12-14
Lun-Vie 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-19 through 2025-01-24
Lun-Vie 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-27 through 2025-02-05
Mar-Vie,Dom 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-09 through 2025-02-16
Lun,Mie,Vie,Dom 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-17 through 2025-02-23
Mar-Vie,Dom 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-25 through 2025-03-05
Sab 18:20 San Jose (SJC) B 19:40 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-01-11 through 2025-02-08
Lun,Mie 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-04 through 2024-11-06
Mar,Mie 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-12 through 2024-11-20
Mar-Vie 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-29 through 2024-12-06
Lun-Jue 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-09 through 2024-12-18
Mar,Mie 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-24 through 2025-01-01
Lun,Dom 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-06 through 2025-01-12
Lun,Jue,Vie 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-16 through 2025-01-20
Dom 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-26 through 2025-02-02
Lun,Jue,Vie 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-06 through 2025-02-10
Lun,Mar,Jue 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-18 through 2025-02-24
Lun 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-03-03
Sab 19:20 San Diego (SAN) 1 22:20 Salt Lake City (SLC)
WN 3823 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2025-02-15 through 2025-03-01
Lun,Jue,Vie,Dom 19:55 San Diego (SAN) 1 00:30 San Antonio (SAT) A
WN 3823 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-02-13 through 2025-02-17
The flight arrives 1 day after departure.
Jue,Vie,Dom 19:55 San Diego (SAN) 1 00:30 San Antonio (SAT) A
WN 3823 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-02-21 through 2025-03-02
The flight arrives 1 day after departure.
Vuelos no directos:
Dom 13:50 Albuquerque (ABQ) 16:35 San Jose (SJC) B
WN 3823 1-stop Boeing 737-700 (73W) 3:45 Effective 2024-09-08 through 2024-09-29
Sab 17:05 San Jose (SJC) B 22:20 Salt Lake City (SLC)
WN 3823 1-stop Boeing 737 MAX 8 (7M8) 4:15 Effective 2025-02-15 through 2025-03-01
Lun,Jue,Vie,Dom 18:00 San Jose (SJC) B 00:30 San Antonio (SAT) A
WN 3823 1-stop Boeing 737-700 (73W) 4:30 Effective 2025-02-13 through 2025-02-17
The flight arrives 1 day after departure.
Jue,Vie,Dom 18:00 San Jose (SJC) B 00:30 San Antonio (SAT) A
WN 3823 1-stop Boeing 737-700 (73W) 4:30 Effective 2025-02-21 through 2025-03-02
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
Southwest Airlines vuelo WN 3823: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Southwest Airlines WN3823
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3823
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3823
Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3823
Operates only on 2024-09-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 4:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3823
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 0:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 0:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 0:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 0:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3823
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3823
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-09 through 2025-02-16
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-17 through 2025-02-23
Lun
Mar
-
Mie
Jue
-
Vie
Sab
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-25 through 2025-03-05
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3823
Effective 2024-11-04 through 2024-11-06
Lun
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-06 through 2025-01-12
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-16 through 2025-01-20
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-26 through 2025-02-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-06 through 2025-02-10
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3823
19:55

00:30(+1)
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN3823
19:55

00:30(+1)
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Vuelos no directos:

Southwest Airlines WN3823
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:45, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 4:15, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3823
18:00

00:30(+1)
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 4:30, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN3823
18:00

00:30(+1)
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 4:30, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
  • Albuquerque (ABQ) - Long Beach (LGB)
  • Albuquerque (ABQ) - San Jose (SJC)
  • Long Beach (LGB) - San Jose (SJC)
  • Montrose (MTJ) - Denver (DEN)
  • Nashville (BNA) - San Diego (SAN)
  • San Diego (SAN) - Las Vegas Harry Reid (LAS)
  • San Diego (SAN) - Salt Lake City (SLC)
  • San Diego (SAN) - San Antonio (SAT)
  • San Jose (SJC) - Salt Lake City (SLC)
  • San Jose (SJC) - San Antonio (SAT)
  • San Jose (SJC) - San Diego (SAN)