Southwest Airlines vuelo WN 379: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Sab 05:00 Memphis (MEM) 06:35 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-11-23 through 2024-11-30
Sab 05:00 Memphis (MEM) 06:35 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-12-21 through 2025-01-04
Lun,Jue,Vie,Dom 05:15 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:40 Effective 2025-02-13 through 2025-02-17
Jue,Vie,Dom 05:15 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:40 Effective 2025-02-21 through 2025-03-02
Jue,Vie,Dom 05:20 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 05:20 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-11-11 through 2024-11-25
Vie,Dom 05:20 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-12-08 through 2024-12-15
Jue 05:20 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Operates only on 2024-12-19
Vie 05:20 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Operates only on 2025-01-03
Lun-Mie 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-04 through 2024-11-06
Mar,Mie 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-12 through 2024-11-27
Lun-Vie 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-29 through 2024-12-12
Lun-Mie,Vie,Dom 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-12-16 through 2024-12-25
Lun-Vie,Dom 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-12-26 through 2025-01-02
Lun,Dom 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2025-01-05 through 2025-01-06
Jue,Vie,Dom 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2025-01-12 through 2025-01-17
Lun,Dom 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2025-01-20 through 2025-01-26
Jue,Vie,Dom 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2025-02-02 through 2025-02-07
Lun 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2025-02-10
Lun,Mar,Jue 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2025-02-18 through 2025-02-24
Lun 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2025-03-03
Dom 06:00 Memphis (MEM) 07:35 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2024-12-01
Sab 06:05 Memphis (MEM) 07:40 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-11-09 through 2024-11-16
Sab 06:05 Memphis (MEM) 07:40 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-12-07 through 2024-12-14
Lun-Vie 07:15 Memphis (MEM) 08:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 07:15 Memphis (MEM) 08:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-19 through 2025-01-24
Lun-Vie 07:15 Memphis (MEM) 08:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 07:15 Memphis (MEM) 08:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-02-09 through 2025-02-12
Mar,Mie 07:15 Memphis (MEM) 08:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-02-19 through 2025-03-05
Sab 08:00 Las Vegas Harry Reid (LAS) 1 09:40 Sacramento (SMF) B
WN 379 Non-stop Boeing 737-800 (73H) 1:40 Effective 2025-02-15 through 2025-03-01
Sab 09:00 Memphis (MEM) 10:40 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-11 through 2025-02-08
Jue 10:30 Memphis (MEM) 12:05 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2024-11-28
Dom 10:45 Houston Hobby (HOU) 13:55 Greenville/Spartanburg (GSP)
WN 379 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-09-08 through 2024-09-29
Sab 10:50 Baltimore (BWI) 11:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-05 through 2024-11-02
Lun,Jue,Vie 11:15 Eugene (EUG) 13:20 Las Vegas Harry Reid (LAS) 1
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Valid until 2024-09-30
Dom 12:15 Houston Hobby (HOU) 15:25 Greenville/Spartanburg (GSP)
WN 379 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2024-09-01
Jue 12:30 Baltimore (BWI) 13:35 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2024-10-31
Lun,Jue,Vie 12:50 Ronald Reagan Washington (DCA) 13:50 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-10-03 through 2024-10-28
Vie 12:50 Ronald Reagan Washington (DCA) 13:50 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2024-11-01
Sab 13:10 Houston Hobby (HOU) 16:20 Greenville/Spartanburg (GSP)
WN 379 Non-stop Boeing 737-700 (73W) 2:10 Valid until 2024-09-28
Mar,Mie 13:30 Baltimore (BWI) 14:30 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-10-29 through 2024-10-30
Mar,Mie 14:00 Baltimore (BWI) 15:00 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-10-08 through 2024-10-23
Lun,Jue,Vie 14:30 Midway, Chicago (MDW) 16:10 Denver (DEN)
WN 379 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-10-03 through 2024-10-28
Vie 14:30 Midway, Chicago (MDW) 16:10 Denver (DEN)
WN 379 Non-stop Boeing 737-700 (73W) 2:40 Operates only on 2024-11-01
Mar,Mie 14:55 Greenville/Spartanburg (GSP) 15:50 Atlanta (ATL) N
WN 379 Non-stop Boeing 737-700 (73W) 0:55 Valid until 2024-10-02
Dom 16:35 Kansas City (MCI) 17:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-06 through 2024-10-27
Lun,Jue,Vie 16:50 Denver (DEN) 17:35 Colorado Springs (COS)
WN 379 Non-stop Boeing 737-700 (73W) 0:45 Effective 2024-10-03 through 2024-10-28
Vie 16:50 Denver (DEN) 17:35 Colorado Springs (COS)
WN 379 Non-stop Boeing 737-700 (73W) 0:45 Operates only on 2024-11-01
Lun,Jue,Vie 18:10 Colorado Springs (COS) 20:55 Love Field, Dallas (DAL) 1
WN 379 Non-stop Boeing 737-700 (73W) 1:45 Effective 2024-10-03 through 2024-10-28
Vie 18:10 Colorado Springs (COS) 20:55 Love Field, Dallas (DAL) 1
WN 379 Non-stop Boeing 737-700 (73W) 1:45 Operates only on 2024-11-01
Vuelos no directos:
Lun,Jue,Vie 12:50 Ronald Reagan Washington (DCA) 16:10 Denver (DEN)
WN 379 1-stop Boeing 737-700 (73W) 5:20 Effective 2024-10-03 through 2024-10-28
Vie 12:50 Ronald Reagan Washington (DCA) 16:10 Denver (DEN)
WN 379 1-stop Boeing 737-700 (73W) 5:20 Operates only on 2024-11-01
Lun,Jue,Vie 14:30 Midway, Chicago (MDW) 17:35 Colorado Springs (COS)
WN 379 1-stop Boeing 737-700 (73W) 4:05 Effective 2024-10-03 through 2024-10-28
Vie 14:30 Midway, Chicago (MDW) 17:35 Colorado Springs (COS)
WN 379 1-stop Boeing 737-700 (73W) 4:05 Operates only on 2024-11-01
Lun,Jue,Vie 16:50 Denver (DEN) 20:55 Love Field, Dallas (DAL) 1
WN 379 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-10-03 through 2024-10-28
Vie 16:50 Denver (DEN) 20:55 Love Field, Dallas (DAL) 1
WN 379 1-stop Boeing 737-700 (73W) 3:05 Operates only on 2024-11-01
Lun,Jue,Vie 12:50 Ronald Reagan Washington (DCA) 17:35 Colorado Springs (COS)
WN 379 2-stop Boeing 737-700 (73W) 6:45 Effective 2024-10-03 through 2024-10-28
Vie 12:50 Ronald Reagan Washington (DCA) 17:35 Colorado Springs (COS)
WN 379 2-stop Boeing 737-700 (73W) 6:45 Operates only on 2024-11-01
Lun,Jue,Vie 14:30 Midway, Chicago (MDW) 20:55 Love Field, Dallas (DAL) 1
WN 379 2-stop Boeing 737-700 (73W) 6:25 Effective 2024-10-03 through 2024-10-28
Vie 14:30 Midway, Chicago (MDW) 20:55 Love Field, Dallas (DAL) 1
WN 379 2-stop Boeing 737-700 (73W) 6:25 Operates only on 2024-11-01
Lun,Jue,Vie 12:50 Ronald Reagan Washington (DCA) 20:55 Love Field, Dallas (DAL) 1
WN 379 3-stop Boeing 737-700 (73W) 9:05 Effective 2024-10-03 through 2024-10-28
Vie 12:50 Ronald Reagan Washington (DCA) 20:55 Love Field, Dallas (DAL) 1
WN 379 3-stop Boeing 737-700 (73W) 9:05 Operates only on 2024-11-01
This flight number is listed as serving the following routes:
Southwest Airlines vuelo WN 379: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Southwest Airlines WN379
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-11-12 through 2024-11-27
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-11-29 through 2024-12-12
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-12-16 through 2024-12-25
Lun
Mar
Mie
Jue
-
Vie
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-12-26 through 2025-01-02
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-01-05 through 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2025-02-10
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-12-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Valid until 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Operates only on 2024-09-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-10-31
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Valid until 2024-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-29 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-10-08 through 2024-10-23
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Valid until 2024-10-02
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 0:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 0:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 0:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Vuelos no directos:

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 5:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 5:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 6:45, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 6:45, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 6:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 6:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 9:05, 3-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 9:05, 3-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Baltimore (BWI) - Midway, Chicago (MDW)
  • Colorado Springs (COS) - Love Field, Dallas (DAL)
  • Denver (DEN) - Colorado Springs (COS)
  • Denver (DEN) - Love Field, Dallas (DAL)
  • Eugene (EUG) - Las Vegas Harry Reid (LAS)
  • Greenville/Spartanburg (GSP) - Atlanta (ATL)
  • Houston Hobby (HOU) - Greenville/Spartanburg (GSP)
  • Kansas City (MCI) - Midway, Chicago (MDW)
  • Las Vegas Harry Reid (LAS) - Sacramento (SMF)
  • Memphis (MEM) - Midway, Chicago (MDW)
  • Midway, Chicago (MDW) - Colorado Springs (COS)
  • Midway, Chicago (MDW) - Denver (DEN)
  • Midway, Chicago (MDW) - Love Field, Dallas (DAL)
  • Ronald Reagan Washington (DCA) - Colorado Springs (COS)
  • Ronald Reagan Washington (DCA) - Denver (DEN)
  • Ronald Reagan Washington (DCA) - Love Field, Dallas (DAL)
  • Ronald Reagan Washington (DCA) - Midway, Chicago (MDW)