Southwest Airlines vuelo WN 3618: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Sab 07:20 Kansas City (MCI) 11:15 Fort Lauderdale (FLL) 1
WN 3618 Non-stop Boeing 737-800 (73H) 2:55 Effective 2025-10-04 through 2025-11-01
Mar,Mie 07:50 Nashville (BNA) 09:10 Saint Louis (STL) 2
WN 3618 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Valid until 2025-06-04
Lun-Mie 10:55 Milwaukee (MKE) 14:40 Orlando (MCO)
WN 3618 Non-stop Boeing 737-700 (Scimitar Winglets) 2:45 Effective 2025-11-25 through 2025-12-01
Lun,Mar,Vie,Dom 10:55 Milwaukee (MKE) 14:40 Orlando (MCO)
WN 3618 Non-stop Boeing 737-700 (Scimitar Winglets) 2:45 Effective 2025-12-19 through 2026-01-04
Sab 11:55 Milwaukee (MKE) 15:40 Orlando (MCO)
WN 3618 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2025-11-22 through 2025-11-29
Sab 11:55 Milwaukee (MKE) 15:40 Orlando (MCO)
WN 3618 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2025-12-20 through 2026-01-03
Dom 12:00 Kansas City (MCI) 15:15 Ronald Reagan Washington (DCA)
WN 3618 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Operates only on 2025-11-30
Mar,Mie 12:15 Norfolk (ORF) 14:20 Orlando (MCO)
WN 3618 Non-stop Boeing 737-700 (73W) 2:05 Effective 2025-06-10 through 2025-07-30
Dom 13:00 Detroit (DTW) E 13:05 Midway, Chicago (MDW)
WN 3618 Non-stop Boeing 737-700 (73W) 1:05 Operates only on 2025-08-31
Sab 14:05 Norfolk (ORF) 16:10 Orlando (MCO)
WN 3618 Non-stop Boeing 737-700 (73W) 2:05 Effective 2025-06-07 through 2025-08-02
Lun,Jue,Vie 15:15 Kansas City (MCI) 19:10 Fort Lauderdale (FLL) 1
WN 3618 Non-stop Boeing 737-700 (Scimitar Winglets) 2:55 Effective 2025-10-02 through 2025-10-31
Dom 15:15 Kansas City (MCI) 19:10 Fort Lauderdale (FLL) 1
WN 3618 Non-stop Boeing 737-800 (73H) 2:55 Effective 2025-10-05 through 2025-10-26
Sab 15:55 Detroit (DTW) E 16:05 Midway, Chicago (MDW)
WN 3618 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-08-09 through 2025-09-27
Mar,Mie 16:25 Kansas City (MCI) 20:20 Fort Lauderdale (FLL) 1
WN 3618 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2025-10-07 through 2025-10-29
Vie 16:50 Baltimore (BWI) 19:40 San Francisco (SFO) 2
WN 3618 Non-stop Boeing 737 MAX 8 (7M8) 5:50 Operates only on 2025-07-04
Mar,Mie 19:10 Detroit (DTW) E 19:20 Midway, Chicago (MDW)
WN 3618 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2025-08-05 through 2025-10-01
Dom 19:10 Detroit (DTW) E 19:20 Midway, Chicago (MDW)
WN 3618 Non-stop Boeing 737-700 (73W) 1:10 Effective 2025-08-10 through 2025-08-24
Dom 19:10 Detroit (DTW) E 19:20 Midway, Chicago (MDW)
WN 3618 Non-stop Boeing 737-700 (73W) 1:10 Effective 2025-09-07 through 2025-09-28
Lun,Jue,Vie 19:30 Detroit (DTW) E 19:40 Midway, Chicago (MDW)
WN 3618 Non-stop Boeing 737-800 (73H) 1:10 Effective 2025-08-07 through 2025-09-29
Sab 20:45 Nashville (BNA) 22:00 Saint Louis (STL) 2
WN 3618 Non-stop Boeing 737-700 (73W) 1:15 Valid until 2025-05-31
Lun,Jue,Vie 21:15 Nashville (BNA) 22:30 Saint Louis (STL) 2
WN 3618 Non-stop Boeing 737-700 (73W) 1:15 Valid until 2025-06-02
Dom 22:55 Nashville (BNA) 00:10 Saint Louis (STL) 2
WN 3618 Non-stop Boeing 737-800 (73H) 1:15 Valid until 2025-05-18
The flight arrives 1 day after departure.
Dom 22:55 Nashville (BNA) 00:10 Saint Louis (STL) 2
WN 3618 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2025-06-01
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
Southwest Airlines vuelo WN 3618: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Southwest Airlines WN3618
Effective 2025-10-04 through 2025-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3618
Valid until 2025-06-04
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3618
Effective 2025-11-25 through 2025-12-01
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3618
Effective 2025-12-19 through 2026-01-04
Lun
Mar
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 2:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3618
Effective 2025-11-22 through 2025-11-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3618
Effective 2025-12-20 through 2026-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3618
Operates only on 2025-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3618
Effective 2025-06-10 through 2025-07-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3618
Operates only on 2025-08-31
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3618
Effective 2025-06-07 through 2025-08-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3618
Effective 2025-10-02 through 2025-10-31
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:55, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3618
Effective 2025-10-05 through 2025-10-26
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 2:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3618
Effective 2025-08-09 through 2025-09-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3618
Effective 2025-10-07 through 2025-10-29
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3618
Operates only on 2025-07-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 5:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3618
Effective 2025-08-05 through 2025-10-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3618
Effective 2025-08-10 through 2025-08-24
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3618
Effective 2025-09-07 through 2025-09-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3618
Effective 2025-08-07 through 2025-09-29
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3618
Valid until 2025-05-31
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3618
Valid until 2025-06-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3618
Valid until 2025-05-18
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:15, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Southwest Airlines WN3618
Operates only on 2025-06-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:15, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
  • Baltimore (BWI) - San Francisco (SFO)
  • Detroit (DTW) - Midway, Chicago (MDW)
  • Kansas City (MCI) - Fort Lauderdale (FLL)
  • Kansas City (MCI) - Ronald Reagan Washington (DCA)
  • Milwaukee (MKE) - Orlando (MCO)
  • Nashville (BNA) - Saint Louis (STL)
  • Norfolk (ORF) - Orlando (MCO)