Southwest Airlines vuelo WN 1903: Multiple routes

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Lun-Mie 07:00 Long Beach (LGB) 12:05 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Effective 2024-11-26 through 2024-12-02
Lun,Jue,Vie,Dom 07:00 Long Beach (LGB) 12:05 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Effective 2024-12-20 through 2025-01-02
Dom 07:00 Long Beach (LGB) 12:05 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Operates only on 2025-01-05
Jue 07:15 Long Beach (LGB) 12:20 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-800 (73H) 3:05 Operates only on 2024-11-28
Lun-Vie 07:45 Long Beach (LGB) 12:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-700 (73W) 3:05 Effective 2025-01-07 through 2025-01-15
Mar-Vie,Dom 07:45 Long Beach (LGB) 12:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-700 (73W) 3:05 Effective 2025-01-19 through 2025-01-24
Lun-Vie 07:45 Long Beach (LGB) 12:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-700 (73W) 3:05 Effective 2025-01-27 through 2025-02-05
Mar,Mie,Dom 07:45 Long Beach (LGB) 12:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-700 (73W) 3:05 Effective 2025-02-09 through 2025-02-12
Mar,Mie 07:45 Long Beach (LGB) 12:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-700 (73W) 3:05 Effective 2025-02-19 through 2025-03-05
Jue,Vie,Dom 07:50 Long Beach (LGB) 12:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-11-03 through 2024-11-10
Lun,Jue,Vie,Dom 07:50 Long Beach (LGB) 12:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-11-11 through 2024-11-25
Vie,Dom 07:50 Long Beach (LGB) 12:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-12-08 through 2024-12-15
Jue 07:50 Long Beach (LGB) 12:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Operates only on 2024-12-19
Vie 07:50 Long Beach (LGB) 12:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Operates only on 2025-01-03
Lun-Mie 08:05 Long Beach (LGB) 13:05 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-800 (73H) 3:00 Effective 2024-11-04 through 2024-11-06
Mar,Mie 08:05 Long Beach (LGB) 13:05 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-800 (73H) 3:00 Effective 2024-11-12 through 2024-11-20
Mar-Vie 08:05 Long Beach (LGB) 13:05 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-800 (73H) 3:00 Effective 2024-11-29 through 2024-12-06
Lun-Jue 08:05 Long Beach (LGB) 13:05 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-800 (73H) 3:00 Effective 2024-12-09 through 2024-12-18
Mar,Mie 08:05 Long Beach (LGB) 13:05 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-800 (73H) 3:00 Effective 2024-12-24 through 2025-01-01
Lun 08:05 Long Beach (LGB) 13:05 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-800 (73H) 3:00 Operates only on 2025-01-06
Dom 08:20 Midway, Chicago (MDW) 10:40 San Diego (SAN) 1
WN 1903 Non-stop Boeing 737-800 (73H) 4:20 Effective 2024-10-06 through 2024-10-27
Mar,Mie 10:25 Nashville (BNA) 12:25 Love Field, Dallas (DAL) 1
WN 1903 Non-stop Boeing 737-700 (73W) 2:00 Valid until 2024-10-02
Dom 11:30 San Diego (SAN) 1 13:05 Sacramento (SMF) B
WN 1903 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-10-06 through 2024-10-27
Sab 11:55 Long Beach (LGB) 16:55 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-11-09 through 2024-11-16
Sab 11:55 Las Vegas Harry Reid (LAS) 1 13:20 Santa Barbara (SBA)
WN 1903 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-23 through 2024-11-30
Sab 11:55 Long Beach (LGB) 16:55 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-12-07 through 2024-12-14
Sab 11:55 Las Vegas Harry Reid (LAS) 1 13:20 Santa Barbara (SBA)
WN 1903 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-21 through 2025-01-04
Sab 12:20 Long Beach (LGB) 17:20 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2025-01-11 through 2025-02-08
Sab,Dom 12:45 Kahului (OGG) 20:40 San Jose (SJC) B
WN 1903 Non-stop Boeing 737 MAX 8 (7M8) 4:55 Valid until 2024-09-29
Lun,Jue,Vie 13:00 Midway, Chicago (MDW) 15:40 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-800 (73H) 2:40 Effective 2024-10-04 through 2024-10-28
Vie 13:00 Midway, Chicago (MDW) 15:40 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-800 (73H) 2:40 Operates only on 2024-11-01
Jue 13:10 Midway, Chicago (MDW) 15:50 Houston Hobby (HOU)
WN 1903 Non-stop Boeing 737-800 (73H) 2:40 Operates only on 2024-10-03
Sab 18:45 Denver (DEN) 21:40 Love Field, Dallas (DAL) 1
WN 1903 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-05 through 2024-10-26
Lun,Jue,Vie 18:50 Orlando (MCO) 21:25 Buffalo (BUF)
WN 1903 Non-stop Boeing 737-800 (73H) 2:35 Valid until 2024-09-13
Lun,Jue,Vie 18:50 Orlando (MCO) 21:25 Buffalo (BUF)
WN 1903 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-09-23 through 2024-09-30
Lun,Jue,Vie 19:00 Orlando (MCO) 21:35 Buffalo (BUF)
WN 1903 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-09-16 through 2024-09-20
Mar,Mie 19:00 Denver (DEN) 21:55 Love Field, Dallas (DAL) 1
WN 1903 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-08 through 2024-10-30
Sab 19:30 Denver (DEN) 22:25 Love Field, Dallas (DAL) 1
WN 1903 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2024-11-02
Vuelos no directos:
Dom 08:20 Midway, Chicago (MDW) 13:05 Sacramento (SMF) B
WN 1903 1-stop Boeing 737-800 (73H) 6:45 Effective 2024-10-06 through 2024-10-27
This flight number is listed as serving the following routes:
Southwest Airlines vuelo WN 1903: Multiple routes
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

Southwest Airlines WN1903
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Operates only on 2025-01-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Operates only on 2024-11-28
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 3:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1903
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1903
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1903
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1903
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1903
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Operates only on 2024-12-19
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Operates only on 2025-01-03
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Duration: 3:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 3:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Operates only on 2025-01-06
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 3:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Valid until 2024-10-02
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1903
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1903
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1903
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Valid until 2024-09-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Duration: 4:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1903
Effective 2024-10-04 through 2024-10-28
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Operates only on 2024-11-01
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Operates only on 2024-10-03
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2024-10-05 through 2024-10-26
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1903
Valid until 2024-09-13
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2024-09-23 through 2024-09-30
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2024-09-16 through 2024-09-20
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1903
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1903
Operates only on 2024-11-02
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Vuelos no directos:

Southwest Airlines WN1903
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 6:45, 1-stop
Boeing 737-800 (73H)
This flight number is listed as serving the following routes:
  • Denver (DEN) - Love Field, Dallas (DAL)
  • Kahului (OGG) - San Jose (SJC)
  • Las Vegas Harry Reid (LAS) - Santa Barbara (SBA)
  • Long Beach (LGB) - Houston Hobby (HOU)
  • Midway, Chicago (MDW) - Houston Hobby (HOU)
  • Midway, Chicago (MDW) - Sacramento (SMF)
  • Midway, Chicago (MDW) - San Diego (SAN)
  • Nashville (BNA) - Love Field, Dallas (DAL)
  • Orlando (MCO) - Buffalo (BUF)
  • San Diego (SAN) - Sacramento (SMF)