HORARIO DE VUELOS |
---|
Vuelos directos: |
Lun
00:05
Sharm el-Sheikh (SSH) 2
03:35
Verona (VRN) NO 7149 Non-stop Boeing 737 (737) 4:30 Operates only on 2025-05-12 |
Lun
00:10
Sharm el-Sheikh (SSH) 2
03:40
Verona (VRN) NO 7149 Non-stop Boeing 737 (737) 4:30 Effective 2025-05-19 through 2025-10-20 |
Lun
00:10
Sharm el-Sheikh (SSH) 2
02:40
Verona (VRN) NO 7149 Non-stop Boeing 737 (737) 4:30 Operates only on 2025-10-27 |
Dom
23:10
Sharm el-Sheikh (SSH) 2
02:40
Verona (VRN) NO 7149 Non-stop Boeing 737 (737) 4:30 Effective 2025-11-02 through 2025-12-14 The flight arrives 1 day after departure. |