EgyptAir vuelo MS 222: Cairo - Sharm el-Sheikh

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:
Lun 07:30 Cairo (CAI) 3 08:30 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-09
This is a Non-scheduled Passenger flight.
Vie 09:00 Cairo (CAI) 3 10:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-06
This is a Non-scheduled Passenger flight.
Vie,Dom 09:00 Cairo (CAI) 3 10:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Airbus A320 (320) 1:00 Effective 2025-03-30 through 2025-04-20
This is a Non-scheduled Passenger flight.
Dom 09:55 Cairo (CAI) 3 10:55 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-01
This is a Non-scheduled Passenger flight.
Mar 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-03
This is a Non-scheduled Passenger flight.
Dom 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Airbus A320neo (32N) 1:00 Operates only on 2024-09-08
This is a Non-scheduled Passenger flight.
Vie 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-13 through 2024-09-20
This is a Non-scheduled Passenger flight.
Dom 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-15 through 2024-09-29
This is a Non-scheduled Passenger flight.
Vie 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-09-27 through 2024-10-04
This is a Non-scheduled Passenger flight.
Vie,Dom 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-10-06 through 2024-10-25
This is a Non-scheduled Passenger flight.
Lun-Mie 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2025-03-31 through 2025-04-23
This is a Non-scheduled Passenger flight.
Jue 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Airbus A320neo (32N) 1:00 Effective 2025-04-03 through 2025-04-24
This is a Non-scheduled Passenger flight.
Vie,Dom 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Airbus A320 (320) 1:00 Effective from 2025-04-25
This is a Non-scheduled Passenger flight.
Jue 10:30 Cairo (CAI) 3 11:30 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-05
This is a Non-scheduled Passenger flight.
Mar 10:30 Cairo (CAI) 3 11:30 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-10-01
This is a Non-scheduled Passenger flight.
Mar,Mie 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-04 through 2024-09-11
This is a Non-scheduled Passenger flight.
Mar-Jue 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-12 through 2024-09-18
This is a Non-scheduled Passenger flight.
Jue 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-09-19 through 2024-09-26
This is a Non-scheduled Passenger flight.
Mar,Mie 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-24 through 2024-09-25
This is a Non-scheduled Passenger flight.
Mar-Jue 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-10-02 through 2024-10-09
This is a Non-scheduled Passenger flight.
Jue 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-10-10 through 2024-10-24
This is a Non-scheduled Passenger flight.
Mar,Mie 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-10-15 through 2024-10-23
This is a Non-scheduled Passenger flight.
Lun-Mie 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective from 2025-04-28
This is a Non-scheduled Passenger flight.
Jue 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
MS 222 Non-stop Airbus A320neo (32N) 1:00 Effective from 2025-05-01
This is a Non-scheduled Passenger flight.
EgyptAir vuelo MS 222:
Cairo - Sharm el-Sheikh
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos:

EgyptAir MS222
Operates only on 2024-09-09
This is a Non-scheduled Passenger flight.
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Operates only on 2024-09-06
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective 2025-03-30 through 2025-04-20
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A320 (320)

EgyptAir MS222
Operates only on 2024-09-01
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Operates only on 2024-09-03
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Operates only on 2024-09-08
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A320neo (32N)

EgyptAir MS222
Effective 2024-09-13 through 2024-09-20
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective 2024-09-15 through 2024-09-29
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective 2024-09-27 through 2024-10-04
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Duration: 1:00, non-stop
Airbus A220-300 (223)

EgyptAir MS222
Effective 2024-10-06 through 2024-10-25
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A220-300 (223)

EgyptAir MS222
Effective 2025-03-31 through 2025-04-23
This is a Non-scheduled Passenger flight.
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective 2025-04-03 through 2025-04-24
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

EgyptAir MS222
Effective from 2025-04-25
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Duration: 1:00, non-stop
Airbus A320 (320)

EgyptAir MS222
Operates only on 2024-09-05
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Operates only on 2024-10-01
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective 2024-09-04 through 2024-09-11
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective 2024-09-12 through 2024-09-18
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective 2024-09-19 through 2024-09-26
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

EgyptAir MS222
Effective 2024-09-24 through 2024-09-25
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective 2024-10-02 through 2024-10-09
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective 2024-10-10 through 2024-10-24
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

EgyptAir MS222
Effective 2024-10-15 through 2024-10-23
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective from 2025-04-28
This is a Non-scheduled Passenger flight.
Lun
Mar
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS222
Effective from 2025-05-01
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Duration: 1:00, non-stop
Airbus A320neo (32N)
  • MS 222 es un vuelo nacional saliendo desde el aeropuerto Cairo (CAI) y llegando al aeropuerto Sharm el-Sheikh (SSH).
  • El vuelo tiene una distancia de 234 millas, o 377 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC+2 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo es 1:00.