| HORARIO DE VUELOS |
|---|
| Vuelos directos: |
| Mie
14:50
Alexandria (HBE) 2
18:20
Jeddah (JED) N SM 473 Non-stop Airbus A320 (320) 2:30 Effective 2026-01-07 through 2026-01-28 |
| Mie
20:40
Alexandria (HBE) 2
00:10
Jeddah (JED) N SM 473 Non-stop Airbus A320 (320) 2:30 Effective 2026-02-04 through 2026-03-25 The flight arrives 1 day after departure. |