| FLUGPLAN |
|---|
| Direktflüge: |
| Mo-Do
22:00
Sharjah (SHJ)
03:55
Colombo (CMB) Air Arabia G9 502 Non-stop Airbus A321 (32B) 4:25 Valid until 2026-01-01 The flight arrives 1 day after departure. |
| Mo,Fr,Sa
22:00
Sharjah (SHJ)
03:55
Colombo (CMB) Air Arabia G9 502 Non-stop Airbus A320 (320) 4:25 Effective 2026-01-02 through 2026-03-28 The flight arrives 1 day after departure. |
| Di-Do,So
22:00
Sharjah (SHJ)
03:55
Colombo (CMB) Air Arabia G9 502 Non-stop Airbus A321 (32B) 4:25 Effective 2026-01-04 through 2026-03-26 The flight arrives 1 day after departure. |
| Täglich
22:25
Sharjah (SHJ)
04:25
Colombo (CMB) Air Arabia G9 502 Non-stop Airbus A320 (320) 4:30 Effective 2026-03-29 through 2026-07-02 The flight arrives 1 day after departure. |
| Fr
22:25
Sharjah (SHJ)
04:25
Colombo (CMB) Air Arabia G9 502 Non-stop Airbus A320neo (32N) 4:30 Effective 2026-07-03 through 2026-08-28 The flight arrives 1 day after departure. |
| Mo-Do,Sa,So
22:25
Sharjah (SHJ)
04:25
Colombo (CMB) Air Arabia G9 502 Non-stop Airbus A320 (320) 4:30 Effective 2026-07-04 through 2026-09-03 The flight arrives 1 day after departure. |
| Täglich
22:25
Sharjah (SHJ)
04:25
Colombo (CMB) Air Arabia G9 502 Non-stop Airbus A320 (320) 4:30 Effective 2026-09-04 through 2026-10-24 The flight arrives 1 day after departure. |
| Mo,Di,Do-So
08:00
Sharjah (SHJ)
13:55
Colombo (CMB) Air Arabia G9 508 Non-stop Airbus A321 (32B) 4:25 Valid until 2026-03-28 |
| Mo,Di,Do-So
08:20
Sharjah (SHJ)
14:20
Colombo (CMB) Air Arabia G9 508 Non-stop Airbus A321 (32B) 4:30 Effective 2026-03-29 through 2026-10-24 |
| Mo
20:05
Sharjah (SHJ)
02:00
Colombo (CMB) Air Arabia G9 587 Non-stop Airbus A320neo (32N) 4:25 Valid until 2026-01-12 The flight arrives 1 day after departure. |
| Di-So
20:05
Sharjah (SHJ)
02:00
Colombo (CMB) Air Arabia G9 587 Non-stop Airbus A320 (320) 4:25 Valid until 2026-01-17 The flight arrives 1 day after departure. |
| Mo,So
20:05
Sharjah (SHJ)
02:00
Colombo (CMB) Air Arabia G9 587 Non-stop Airbus A320neo (32N) 4:25 Effective 2026-01-18 through 2026-03-23 The flight arrives 1 day after departure. |
| Di-Sa
20:05
Sharjah (SHJ)
02:00
Colombo (CMB) Air Arabia G9 587 Non-stop Airbus A320 (320) 4:25 Effective 2026-01-20 through 2026-03-28 The flight arrives 1 day after departure. |
| Täglich
21:05
Sharjah (SHJ)
03:05
Colombo (CMB) Air Arabia G9 587 Non-stop Airbus A320 (320) 4:30 Effective 2026-03-29 through 2026-06-30 The flight arrives 1 day after departure. |
| Di,Mi,Fr,Sa
21:05
Sharjah (SHJ)
03:05
Colombo (CMB) Air Arabia G9 587 Non-stop Airbus A320neo (32N) 4:30 Effective 2026-07-01 through 2026-08-29 The flight arrives 1 day after departure. |
| Mo,Do,So
21:05
Sharjah (SHJ)
03:05
Colombo (CMB) Air Arabia G9 587 Non-stop Airbus A320 (320) 4:30 Effective 2026-07-02 through 2026-08-30 The flight arrives 1 day after departure. |
| Mo-Mi,Sa
21:05
Sharjah (SHJ)
03:05
Colombo (CMB) Air Arabia G9 587 Non-stop Airbus A320neo (32N) 4:30 Effective 2026-08-31 through 2026-09-30 The flight arrives 1 day after departure. |
| Do,Fr,So
21:05
Sharjah (SHJ)
03:05
Colombo (CMB) Air Arabia G9 587 Non-stop Airbus A320 (320) 4:30 Effective 2026-09-03 through 2026-10-02 The flight arrives 1 day after departure. |
| Täglich
21:05
Sharjah (SHJ)
03:05
Colombo (CMB) Air Arabia G9 587 Non-stop Airbus A320 (320) 4:30 Effective 2026-10-03 through 2026-10-24 The flight arrives 1 day after departure. |