| FLUGPLAN |
|---|
| Direktflüge: |
| Täglich
14:40
Portland (PDX)
16:33
San Jose (SJC) B Alaska Airlines AS 3379 Non-stop Embraer EMB 175 (E75) 1:53 Effective from 2025-10-04 |
| Täglich
17:30
Portland (PDX)
19:23
San Jose (SJC) B Alaska Airlines AS 3400 Non-stop Embraer EMB 175 (E75) 1:53 Effective from 2025-10-04 |
| Mo,Do,Fr,So
17:32
Portland (PDX)
19:22
San Jose (SJC) B Alaska Airlines AS 3400 Non-stop Embraer EMB 175 (E75) 1:50 Effective 2025-08-21 through 2025-10-03 |
| Sa
16:35
Portland (PDX)
18:25
San Jose (SJC) B Southwest Airlines WN 3421 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-22 through 2025-11-29 |
| Sa
16:35
Portland (PDX)
18:25
San Jose (SJC) B Southwest Airlines WN 3421 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-20 through 2026-01-03 |
| Mo,Do,Fr,So
17:30
Portland (PDX)
19:21
San Jose (SJC) B Alaska Airlines AS 3443 Non-stop Embraer EMB 175 (E75) 1:51 Valid until 2025-05-12 |
| So
07:10
Portland (PDX)
09:00
San Jose (SJC) B Southwest Airlines WN 3619 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-08-10 through 2025-08-24 |
| So
07:10
Portland (PDX)
09:00
San Jose (SJC) B Southwest Airlines WN 3619 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-09-07 through 2025-09-28 |
| Sa
10:10
Portland (PDX)
12:00
San Jose (SJC) B Southwest Airlines WN 3785 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-08 through 2025-11-15 |
| Sa
10:10
Portland (PDX)
12:00
San Jose (SJC) B Southwest Airlines WN 3785 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-06 through 2025-12-13 |
| Di,Mi
17:50
Portland (PDX)
19:35
San Jose (SJC) B Southwest Airlines WN 3996 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-08-05 through 2025-10-01 |
| So
18:20
Portland (PDX)
20:05
San Jose (SJC) B Southwest Airlines WN 3996 Non-stop Boeing 737-800 (73H) 1:45 Operates only on 2025-08-31 |
| Mo,Do,Fr
19:45
Portland (PDX)
21:30
San Jose (SJC) B Southwest Airlines WN 3996 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-08-07 through 2025-09-29 |
| So
20:25
Portland (PDX)
22:10
San Jose (SJC) B Southwest Airlines WN 3996 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-08-10 through 2025-08-24 |
| So
20:25
Portland (PDX)
22:10
San Jose (SJC) B Southwest Airlines WN 3996 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-09-07 through 2025-09-28 |
| Mo,Do,Fr,So
06:10
Portland (PDX)
08:00
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-11-02 through 2025-11-16 |
| Mo,Fr,So
06:10
Portland (PDX)
08:00
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-11-21 through 2025-11-28 |
| Fr,So
06:10
Portland (PDX)
08:00
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-12-07 through 2025-12-14 |
| Do
06:10
Portland (PDX)
08:00
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:50 Operates only on 2025-12-18 |
| Mo
06:10
Portland (PDX)
08:00
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:50 Operates only on 2026-01-05 |
| Mo-Mi
06:20
Portland (PDX)
08:10
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-11-25 through 2025-12-01 |
| Mo,Di,Fr,So
06:20
Portland (PDX)
08:10
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-12-19 through 2026-01-04 |
| So
06:45
Portland (PDX)
08:35
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Operates only on 2025-11-30 |
| Sa
06:55
Portland (PDX)
08:45
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-11-22 through 2025-11-29 |
| Sa
06:55
Portland (PDX)
08:45
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-12-20 through 2026-01-03 |
| Di,Mi
12:05
Portland (PDX)
13:50
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-11-04 through 2025-11-12 |
| Mo-Do
12:05
Portland (PDX)
13:50
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-11-17 through 2025-11-20 |
| Mo-Fr
12:05
Portland (PDX)
13:50
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-12-02 through 2025-12-11 |
| Mo-Mi
12:05
Portland (PDX)
13:50
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-12-15 through 2025-12-17 |
| Mi,Do
12:05
Portland (PDX)
13:50
San Jose (SJC) B Southwest Airlines WN 4024 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-12-24 through 2026-01-01 |
| Mo-Mi
20:45
Portland (PDX)
22:35
San Jose (SJC) B Southwest Airlines WN 4028 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-11-25 through 2025-12-01 |
| Mo,Di,Fr,So
20:45
Portland (PDX)
22:35
San Jose (SJC) B Southwest Airlines WN 4028 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-12-19 through 2026-01-04 |
| Sa
21:05
Portland (PDX)
22:55
San Jose (SJC) B Southwest Airlines WN 4028 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-22 through 2025-11-29 |
| Sa
21:05
Portland (PDX)
22:55
San Jose (SJC) B Southwest Airlines WN 4028 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-20 through 2026-01-03 |
| Mo,Do,Fr
06:30
Portland (PDX)
08:15
San Jose (SJC) B Southwest Airlines WN 4132 Non-stop Boeing 737-700 (Scimitar Winglets) 1:45 Effective 2025-10-02 through 2025-10-31 |
| Di,Mi
06:45
Portland (PDX)
08:30
San Jose (SJC) B Southwest Airlines WN 4132 Non-stop Boeing 737-700 (Scimitar Winglets) 1:45 Effective 2025-10-07 through 2025-10-29 |
| So
07:20
Portland (PDX)
09:05
San Jose (SJC) B Southwest Airlines WN 4132 Non-stop Boeing 737-700 (Scimitar Winglets) 1:45 Effective 2025-10-05 through 2025-10-26 |
| Di,Mi
18:25
Portland (PDX)
20:10
San Jose (SJC) B Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:45 Effective 2025-10-07 through 2025-10-29 |
| Mo,Do,Fr
20:40
Portland (PDX)
22:25
San Jose (SJC) B Southwest Airlines WN 4135 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-10-02 through 2025-10-31 |
| So
21:05
Portland (PDX)
22:50
San Jose (SJC) B Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:45 Effective 2025-10-05 through 2025-10-26 |
| So
15:05
Portland (PDX)
16:55
San Jose (SJC) B Southwest Airlines WN 4287 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2025-11-30 |
| Di,Mi
06:30
Portland (PDX)
08:15
San Jose (SJC) B Southwest Airlines WN 4359 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Valid until 2025-06-04 |
| Mo,Do,Fr
20:25
Portland (PDX)
22:10
San Jose (SJC) B Southwest Airlines WN 4359 Non-stop Boeing 737-800 (73H) 1:45 Valid until 2025-06-02 |
| So
20:40
Portland (PDX)
22:25
San Jose (SJC) B Southwest Airlines WN 4359 Non-stop Boeing 737-700 (73W) 1:45 Valid until 2025-05-18 |
| So
20:40
Portland (PDX)
22:25
San Jose (SJC) B Southwest Airlines WN 4359 Non-stop Boeing 737-700 (73W) 1:45 Operates only on 2025-06-01 |
| Di,Mi
14:10
Portland (PDX)
15:55
San Jose (SJC) B Southwest Airlines WN 4382 Non-stop Boeing 737-700 (73W) 1:45 Effective 2025-06-10 through 2025-07-30 |
| So
10:30
Portland (PDX)
12:20
San Jose (SJC) B Southwest Airlines WN 4853 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2025-11-30 |
| Indirekte Flüge: |
| So
15:30
Portland (PDX)
21:05
San Jose (SJC) B Southwest Airlines WN 3997 2-stop Boeing 737-700 (Scimitar Winglets) 5:35 Operates only on 2025-11-30 |
| Direkte Codeshareflüge: |
| Di,Fr,So
21:10
Portland (PDX)
22:56
San Jose (SJC) B Condor DE 5214 Non-stop Embraer EMB 175 (E75) 1:46 Effective 2025-05-16 through 2025-06-10 Codeshare flight, operated by Alaska Airlines.(AS 2272) |
| Di,Fr,So
21:10
Portland (PDX)
23:00
San Jose (SJC) B Condor DE 5214 Non-stop Embraer EMB 175 (E75) 1:50 Effective 2025-06-13 through 2025-07-01 Codeshare flight, operated by Alaska Airlines.(AS 2272) |