| FLUGPLAN |
|---|
| Indirekte Codeshareflüge: |
| Do
14:00
San Carlos Bariloche (BRC)
06:25
Trelew (REL) Gol G3 3072 1-stop Boeing 737 MAX 8 (7M8) 16:25 Operates only on 2026-04-02 Codeshare flight, operated by Aerolineas Argentinas.(AR 1673) The flight arrives 1 day after departure. |
| Do
14:00
San Carlos Bariloche (BRC)
06:25
Trelew (REL) Gol G3 3072 1-stop Boeing 737 MAX 8 (7M8) 16:25 Operates only on 2026-06-25 Codeshare flight, operated by Aerolineas Argentinas.(AR 1673) The flight arrives 1 day after departure. |