| FLUGPLAN |
|---|
| Direkte Codeshareflüge: |
| Sa
16:26
Nashville (BNA)
18:35
Atlanta (ATL) S Virgin Atlantic VS 4687 Non-stop Boeing 717 (717) 1:09 Operates only on 2026-01-17 Codeshare flight, operated by Delta Air Lines.(DL 789) |
| Mo-Fr,So
17:29
Nashville (BNA)
19:42
Atlanta (ATL) S Virgin Atlantic VS 4687 Non-stop Boeing 737-900 (739) 1:13 Effective 2026-02-12 through 2026-03-06 Codeshare flight, operated by Delta Air Lines.(DL 789) |
| Di,Mi
17:30
Nashville (BNA)
19:53
Atlanta (ATL) S Virgin Atlantic VS 4687 Non-stop Boeing 737-900 (739) 1:23 Effective 2026-01-06 through 2026-01-14 Codeshare flight, operated by Delta Air Lines.(DL 789) |
| Di,Mi
17:55
Nashville (BNA)
20:18
Atlanta (ATL) S Virgin Atlantic VS 4687 Non-stop Boeing 717 (717) 1:23 Effective 2026-01-20 through 2026-02-11 Codeshare flight, operated by Delta Air Lines.(DL 789) |
| Mo,Do,Fr,So
17:58
Nashville (BNA)
20:21
Atlanta (ATL) S Virgin Atlantic VS 4687 Non-stop Airbus A320 (320) 1:23 Effective 2026-01-08 through 2026-01-18 Codeshare flight, operated by Delta Air Lines.(DL 789) |
| Mo,Do,Fr,So
17:58
Nashville (BNA)
20:21
Atlanta (ATL) S Virgin Atlantic VS 4687 Non-stop Boeing 717 (717) 1:23 Effective 2026-01-22 through 2026-02-09 Codeshare flight, operated by Delta Air Lines.(DL 789) |
| Sa
18:00
Nashville (BNA)
20:29
Atlanta (ATL) S Virgin Atlantic VS 4687 Non-stop Boeing 717 (717) 1:29 Effective 2026-01-24 through 2026-02-07 Codeshare flight, operated by Delta Air Lines.(DL 789) |
| Mo
18:10
Nashville (BNA)
20:39
Atlanta (ATL) S Virgin Atlantic VS 4687 Non-stop Boeing 737-900 (739) 1:29 Operates only on 2026-01-19 Codeshare flight, operated by Delta Air Lines.(DL 789) |
| Sa
18:52
Nashville (BNA)
21:15
Atlanta (ATL) S Virgin Atlantic VS 4687 Non-stop Boeing 717 (717) 1:23 Effective 2026-02-14 through 2026-03-07 Codeshare flight, operated by Delta Air Lines.(DL 789) |
| Täglich
08:25
Nashville (BNA)
10:43
Atlanta (ATL) S Aeromexico AM 4704 Non-stop Boeing 717 (717) 1:18 Valid until 2026-01-04 Codeshare flight, operated by Delta Air Lines.(DL 1743) |
| Mo
10:45
Nashville (BNA)
12:51
Atlanta (ATL) S Aeromexico AM 4856 Non-stop Boeing 717 (717) 1:06 Operates only on 2026-01-19 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Täglich
10:48
Nashville (BNA)
12:54
Atlanta (ATL) S Aeromexico AM 4856 Non-stop Boeing 717 (717) 1:06 Effective 2026-01-20 through 2026-02-11 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Sa
10:48
Nashville (BNA)
12:52
Atlanta (ATL) S Aeromexico AM 4856 Non-stop Boeing 717 (717) 1:04 Effective 2026-02-14 through 2026-03-07 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Mo-Fr,So
10:59
Nashville (BNA)
13:03
Atlanta (ATL) S Aeromexico AM 4856 Non-stop Boeing 717 (717) 1:04 Effective 2026-02-12 through 2026-03-06 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Fr
11:54
Nashville (BNA)
14:03
Atlanta (ATL) S Aeromexico AM 4856 Non-stop Boeing 737-900 (739) 1:09 Operates only on 2026-01-09 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Mo-Do,Sa,So
12:00
Nashville (BNA)
14:10
Atlanta (ATL) S Aeromexico AM 4856 Non-stop Boeing 717 (717) 1:10 Effective 2026-01-05 through 2026-01-15 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Fr-So
12:00
Nashville (BNA)
14:10
Atlanta (ATL) S Aeromexico AM 4856 Non-stop Boeing 717 (717) 1:10 Effective 2026-01-16 through 2026-01-18 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Mo-Fr
08:05
Nashville (BNA)
10:20
Atlanta (ATL) S Aeromexico AM 4893 Non-stop Boeing 717 (717) 1:15 Effective 2026-02-12 through 2026-02-20 Codeshare flight, operated by Delta Air Lines.(DL 630) |
| Sa
08:05
Nashville (BNA)
10:25
Atlanta (ATL) S Aeromexico AM 4893 Non-stop Boeing 737-900 (739) 1:20 Operates only on 2026-02-14 Codeshare flight, operated by Delta Air Lines.(DL 630) |
| Mo-Sa
08:05
Nashville (BNA)
10:20
Atlanta (ATL) S Aeromexico AM 4893 Non-stop Boeing 717 (717) 1:15 Effective 2026-02-21 through 2026-03-07 Codeshare flight, operated by Delta Air Lines.(DL 630) |
| So
08:12
Nashville (BNA)
10:30
Atlanta (ATL) S Aeromexico AM 4893 Non-stop Boeing 717 (717) 1:18 Effective 2026-02-15 through 2026-03-01 Codeshare flight, operated by Delta Air Lines.(DL 630) |
| Täglich
08:25
Nashville (BNA)
10:45
Atlanta (ATL) S Aeromexico AM 4893 Non-stop Boeing 717 (717) 1:20 Effective 2026-01-05 through 2026-01-17 Codeshare flight, operated by Delta Air Lines.(DL 630) |
| Täglich
08:25
Nashville (BNA)
10:45
Atlanta (ATL) S Aeromexico AM 4893 Non-stop Boeing 717 (717) 1:20 Effective 2026-01-19 through 2026-02-11 Codeshare flight, operated by Delta Air Lines.(DL 630) |
| So
09:23
Nashville (BNA)
11:35
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 737-900 (739) 1:12 Effective 2026-02-15 through 2026-03-01 Codeshare flight, operated by Delta Air Lines.(DL 1029) |
| Täglich
12:15
Nashville (BNA)
14:24
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 737-900 (739) 1:09 Effective from 2026-10-25 Codeshare flight, operated by Delta Air Lines.(DL 2867) |
| Mo,Di,Fr-So
12:29
Nashville (BNA)
14:41
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 717 (717) 1:12 Valid until 2026-01-04 Codeshare flight, operated by Delta Air Lines.(DL 1617) |
| Mo,Do,Fr,So
12:58
Nashville (BNA)
15:04
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 737-800 (738) 1:06 Effective 2026-01-19 through 2026-02-09 Codeshare flight, operated by Delta Air Lines.(DL 970) |
| Mi,Do
13:00
Nashville (BNA)
15:16
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 717 (717) 1:16 Valid until 2026-01-01 Codeshare flight, operated by Delta Air Lines.(DL 1617) |
| Sa
13:10
Nashville (BNA)
15:25
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 717 (717) 1:15 Effective 2026-01-24 through 2026-02-07 Codeshare flight, operated by Delta Air Lines.(DL 970) |
| Mo-Fr
13:51
Nashville (BNA)
15:56
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 737-900 (739) 1:05 Effective 2026-02-12 through 2026-03-06 Codeshare flight, operated by Delta Air Lines.(DL 970) |
| Di,Mi
14:00
Nashville (BNA)
16:05
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 737-800 (738) 1:05 Effective 2026-01-20 through 2026-02-11 Codeshare flight, operated by Delta Air Lines.(DL 970) |
| Mo-Fr,So
14:06
Nashville (BNA)
16:11
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 737-900 (739) 1:05 Effective 2026-01-05 through 2026-01-18 Codeshare flight, operated by Delta Air Lines.(DL 970) |
| Sa
14:06
Nashville (BNA)
16:11
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 717 (717) 1:05 Effective 2026-01-10 through 2026-01-17 Codeshare flight, operated by Delta Air Lines.(DL 970) |
| Sa
14:25
Nashville (BNA)
16:30
Atlanta (ATL) S Virgin Atlantic VS 5000 Non-stop Boeing 737-900 (739) 1:05 Effective 2026-02-14 through 2026-03-07 Codeshare flight, operated by Delta Air Lines.(DL 970) |
| Mo
10:45
Nashville (BNA)
12:51
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 717 (717) 1:06 Operates only on 2026-01-19 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Täglich
10:48
Nashville (BNA)
12:54
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 717 (717) 1:06 Effective 2026-01-20 through 2026-02-11 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Sa
10:48
Nashville (BNA)
12:52
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 717 (717) 1:04 Effective 2026-02-14 through 2026-03-07 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Mo-Fr,So
10:59
Nashville (BNA)
13:03
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 717 (717) 1:04 Effective 2026-02-12 through 2026-03-06 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Fr
11:54
Nashville (BNA)
14:03
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 737-900 (739) 1:09 Operates only on 2026-01-09 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Mo-Do,Sa,So
12:00
Nashville (BNA)
14:10
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 717 (717) 1:10 Effective 2026-01-05 through 2026-01-15 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Fr-So
12:00
Nashville (BNA)
14:10
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 717 (717) 1:10 Effective 2026-01-16 through 2026-01-18 Codeshare flight, operated by Delta Air Lines.(DL 1051) |
| Mo-Fr,So
16:32
Nashville (BNA)
18:43
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 717 (717) 1:11 Valid until 2026-01-04 Codeshare flight, operated by Delta Air Lines.(DL 1625) |
| Mo,Do,Fr,So
17:55
Nashville (BNA)
20:10
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 737-900 (739) 1:15 Effective 2026-04-13 through 2026-05-08 Codeshare flight, operated by Delta Air Lines.(DL 1693) |
| Täglich
17:55
Nashville (BNA)
20:10
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 737-900 (739) 1:15 Effective 2026-05-09 through 2026-08-09 Codeshare flight, operated by Delta Air Lines.(DL 1693) |
| Täglich
17:55
Nashville (BNA)
20:12
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 737-900 (739) 1:17 Effective 2026-08-10 through 2026-10-05 Codeshare flight, operated by Delta Air Lines.(DL 1693) |
| Täglich
17:55
Nashville (BNA)
20:10
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 737-900 (739) 1:15 Effective from 2026-10-06 Codeshare flight, operated by Delta Air Lines.(DL 1693) |
| Täglich
17:59
Nashville (BNA)
20:19
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Airbus A319 (319) 1:20 Effective 2026-03-08 through 2026-04-12 Codeshare flight, operated by Delta Air Lines.(DL 1693) |
| Di,Mi,Sa
18:30
Nashville (BNA)
20:45
Atlanta (ATL) S Virgin Atlantic VS 5024 Non-stop Boeing 737-900 (739) 1:15 Effective 2026-04-14 through 2026-05-06 Codeshare flight, operated by Delta Air Lines.(DL 1693) |
| Sa
15:26
Nashville (BNA)
17:41
Atlanta (ATL) S Virgin Atlantic VS 5026 Non-stop Boeing 737-800 (738) 1:15 Effective 2026-01-10 through 2026-01-17 Codeshare flight, operated by Delta Air Lines.(DL 1371) |
| Sa
15:30
Nashville (BNA)
17:41
Atlanta (ATL) S Virgin Atlantic VS 5026 Non-stop Boeing 737-800 (738) 1:11 Effective 2026-01-24 through 2026-02-07 Codeshare flight, operated by Delta Air Lines.(DL 1371) |