| FLUGPLAN |
|---|
| Direktflüge: |
| Mo,Mi,Sa
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Vueling VY 1574 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-19 through 2026-01-26 |
| Mo-Do
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Vueling VY 1574 Non-stop Airbus A320 (32A) 1:35 Effective 2026-01-27 through 2026-02-05 |
| Sa
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Vueling VY 1574 Non-stop Airbus A321 (321) 1:35 Operates only on 2026-01-31 |
| Mi,Do,Sa
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Vueling VY 1574 Non-stop Airbus A320 (32A) 1:35 Effective 2026-02-07 through 2026-02-21 |
| Mo
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Vueling VY 1574 Non-stop Airbus A321 (321) 1:35 Effective 2026-02-09 through 2026-02-16 |
| Mo,Mi,Do,So
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Vueling VY 1574 Non-stop Airbus A320 (32A) 1:35 Effective 2026-02-22 through 2026-03-02 |
| Mo-Do,So
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Vueling VY 1574 Non-stop Airbus A320 (32A) 1:35 Effective 2026-03-03 through 2026-03-26 |
| Sa
14:30
Barcelona (BCN) 1
16:00
Asturias (OVD) Vueling VY 1574 Non-stop Airbus A320 (32A) 1:30 Effective 2026-02-28 through 2026-03-28 |
| Do
17:45
Barcelona (BCN) 1
19:30
Asturias (OVD) Vueling VY 1574 Non-stop Airbus A320 (32A) 1:45 Effective 2026-06-18 through 2026-09-10 |
| So
06:25
Barcelona (BCN) 1
08:05
Asturias (OVD) Vueling VY 1576 Non-stop Airbus A320 (32A) 1:40 Valid until 2026-01-04 |
| Mi
07:30
Barcelona (BCN) 1
09:10
Asturias (OVD) Vueling VY 1576 Non-stop Airbus A320 (32A) 1:40 Valid until 2026-01-07 |
| Do
15:45
Barcelona (BCN) 1
17:30
Asturias (OVD) Vueling VY 1576 Non-stop Airbus A320 (320) 1:45 Effective 2026-05-07 through 2026-06-11 |
| Do
15:45
Barcelona (BCN) 1
17:30
Asturias (OVD) Vueling VY 1576 Non-stop Airbus A320 (320) 1:45 Effective from 2026-09-17 |
| Di
18:20
Barcelona (BCN) 1
19:55
Asturias (OVD) Vueling VY 1576 Non-stop Airbus A320 (32A) 1:35 Operates only on 2026-01-06 |
| Sa
21:15
Barcelona (BCN) 1
22:50
Asturias (OVD) Vueling VY 1576 Non-stop Airbus A320 (32A) 1:35 Valid until 2026-01-03 |
| Mo
14:00
Barcelona (BCN) 1
15:40
Asturias (OVD) Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective from 2026-03-30 |
| Di,Mi,So
14:10
Barcelona (BCN) 1
15:50
Asturias (OVD) Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective 2026-03-29 through 2026-06-16 |
| Di
14:10
Barcelona (BCN) 1
15:50
Asturias (OVD) Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective 2026-06-23 through 2026-09-15 |
| Di,Mi,So
14:10
Barcelona (BCN) 1
15:50
Asturias (OVD) Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective from 2026-09-16 |
| Fr,Sa
14:25
Barcelona (BCN) 1
16:05
Asturias (OVD) Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective 2026-04-03 through 2026-06-13 |
| Fr,Sa
14:25
Barcelona (BCN) 1
16:05
Asturias (OVD) Vueling VY 1578 Non-stop Airbus A320 (32A) 1:40 Effective from 2026-09-18 |
| Do
11:00
Barcelona (BCN)
01:40
Asturias (OVD) AlbaStar AP 1775 Non-stop Boeing 737-800 (738) 14:40 Effective from 2026-02-19 The flight arrives 1 day after departure. This is a Charter flight. |
| Mo
09:30
Barcelona (BCN)
11:10
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Valid until 2026-01-05 |
| Mo
09:30
Barcelona (BCN)
11:10
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-02-16 through 2026-03-23 |
| Mo
09:35
Barcelona (BCN)
11:15
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-03-30 through 2026-10-19 |
| Do
16:05
Barcelona (BCN)
17:45
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-02-12 through 2026-03-26 |
| Fr
17:15
Barcelona (BCN)
18:55
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A320 (320) 1:40 Effective 2026-01-09 through 2026-02-06 |
| Fr,So
17:40
Barcelona (BCN)
19:20
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Valid until 2026-01-04 |
| So
17:40
Barcelona (BCN)
19:20
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A320 (320) 1:40 Effective 2026-01-11 through 2026-02-08 |
| Fr,So
17:40
Barcelona (BCN)
19:20
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-02-13 through 2026-03-27 |
| Fr
18:00
Barcelona (BCN)
19:40
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-04-03 through 2026-10-23 |
| So
18:35
Barcelona (BCN)
20:15
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-03-29 through 2026-10-18 |
| Do
18:45
Barcelona (BCN)
20:25
Asturias (OVD) Volotea V7 3573 Non-stop Airbus A319 (319) 1:40 Effective 2026-04-02 through 2026-10-22 |
| Direkte Codeshareflüge: |
| Fr
11:45
Barcelona (BCN) 1
13:20
Asturias (OVD) Qatar Airways QR 3519 Non-stop Airbus A320 (32A) 1:35 Operates only on 2026-01-02 Codeshare flight, operated by Vueling.(VY 1574) |
| Mi,Do
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3519 Non-stop Airbus A320 (32A) 1:35 Valid until 2026-01-07 Codeshare flight, operated by Vueling.(VY 1574) |
| Di,Do
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3519 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-06 through 2026-01-08 Codeshare flight, operated by Vueling.(VY 1574) |
| Fr
11:45
Barcelona (BCN) 1
13:20
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-09 through 2026-01-16 Codeshare flight, operated by Vueling.(VY 1574) |
| Fr
11:45
Barcelona (BCN) 1
13:20
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Operates only on 2026-01-23 Codeshare flight, operated by Vueling.(VY 1574) |
| Fr
11:45
Barcelona (BCN) 1
13:20
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Operates only on 2026-01-30 Codeshare flight, operated by Vueling.(VY 1574) |
| Fr
11:45
Barcelona (BCN) 1
13:20
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-02-06 through 2026-03-27 Codeshare flight, operated by Vueling.(VY 1574) |
| Sa
12:20
Barcelona (BCN) 1
13:55
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-10 through 2026-01-17 Codeshare flight, operated by Vueling.(VY 1574) |
| Di-Do,So
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-11 through 2026-01-15 Codeshare flight, operated by Vueling.(VY 1574) |
| Mo,So
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-01-12 through 2026-01-18 Codeshare flight, operated by Vueling.(VY 1574) |
| Mo,Mi,Sa
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Effective 2026-01-19 through 2026-01-26 Codeshare flight, operated by Vueling.(VY 1574) |
| Di,Do
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-01-20 through 2026-01-27 Codeshare flight, operated by Vueling.(VY 1574) |
| Mo-Do
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-01-28 through 2026-02-05 Codeshare flight, operated by Vueling.(VY 1574) |
| Sa
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Operates only on 2026-01-31 Codeshare flight, operated by Vueling.(VY 1574) |
| Mi,Do,Sa
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-02-07 through 2026-02-21 Codeshare flight, operated by Vueling.(VY 1574) |
| Mo
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A321 (321) 1:35 Effective 2026-02-09 through 2026-02-16 Codeshare flight, operated by Vueling.(VY 1574) |
| Mo,Mi,Do,So
12:25
Barcelona (BCN) 1
14:00
Asturias (OVD) Qatar Airways QR 3528 Non-stop Airbus A320 (32A) 1:35 Effective 2026-02-22 through 2026-03-02 Codeshare flight, operated by Vueling.(VY 1574) |