| FLUGPLAN |
|---|
| Direkte Codeshareflüge: |
| Täglich
17:20
Turin (TRN)
18:30
Munich (MUC) 2 ITA Airways AZ 7466 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-03-29 through 2026-10-24 Codeshare flight, operated by Air Dolomiti.(EN 8257) |
| Mo,Do,Sa,So
19:50
Turin (TRN)
21:00
Munich (MUC) 2 ITA Airways AZ 7466 Non-stop Embraer EMB 195 (E95) 1:10 Valid until 2026-01-08 Codeshare flight, operated by Air Dolomiti.(EN 8257) |
| Mo,Mi-So
19:50
Turin (TRN)
21:00
Munich (MUC) 2 ITA Airways AZ 7466 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-01-09 through 2026-03-28 Codeshare flight, operated by Air Dolomiti.(EN 8257) |
| Di
19:55
Turin (TRN)
21:05
Munich (MUC) 2 ITA Airways AZ 7466 Non-stop Embraer EMB 195 (E95) 1:10 Valid until 2026-01-06 Codeshare flight, operated by Air Dolomiti.(EN 8257) |
| Di
19:55
Turin (TRN)
21:05
Munich (MUC) 2 ITA Airways AZ 7466 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-02-03 through 2026-03-24 Codeshare flight, operated by Air Dolomiti.(EN 8257) |
| Mo-Sa
06:15
Turin (TRN)
07:25
Munich (MUC) 2 ITA Airways AZ 7468 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-03-30 through 2026-04-04 Codeshare flight, operated by Air Dolomiti.(EN 8259) |
| Mo-Sa
06:15
Turin (TRN)
07:25
Munich (MUC) 2 ITA Airways AZ 7468 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-04-07 through 2026-10-24 Codeshare flight, operated by Air Dolomiti.(EN 8259) |
| So
08:20
Turin (TRN)
09:30
Munich (MUC) 2 ITA Airways AZ 7468 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-03-29 through 2026-10-18 Codeshare flight, operated by Air Dolomiti.(EN 8259) |
| Mo-Mi,Fr-So
09:45
Turin (TRN)
10:55
Munich (MUC) 2 ITA Airways AZ 7470 Non-stop Embraer EMB 195 (E95) 1:10 Valid until 2026-01-13 Codeshare flight, operated by Air Dolomiti.(EN 8255) |
| Mo,Di,Do-So
09:45
Turin (TRN)
10:55
Munich (MUC) 2 ITA Airways AZ 7470 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-01-15 through 2026-01-27 Codeshare flight, operated by Air Dolomiti.(EN 8255) |
| Täglich
09:45
Turin (TRN)
10:55
Munich (MUC) 2 ITA Airways AZ 7470 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-01-28 through 2026-03-28 Codeshare flight, operated by Air Dolomiti.(EN 8255) |
| Mo-Sa
09:55
Turin (TRN)
11:05
Munich (MUC) 2 ITA Airways AZ 7470 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-03-30 through 2026-08-14 Codeshare flight, operated by Air Dolomiti.(EN 8251) |
| Mo-Sa
09:55
Turin (TRN)
11:05
Munich (MUC) 2 ITA Airways AZ 7470 Non-stop Embraer EMB 195 (E95) 1:10 Effective 2026-08-17 through 2026-10-24 Codeshare flight, operated by Air Dolomiti.(EN 8251) |