| FLUGPLAN |
|---|
| Direkte Codeshareflüge: |
| Mo,Mi,Fr
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Valid until 2026-01-19 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Sa
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737-700 (73W) 2:30 Valid until 2026-01-03 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Di,Do,So
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737-800 (738) 2:30 Valid until 2026-01-08 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Di,Do,Sa,So
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737-800 (738) 2:30 Effective 2026-01-10 through 2026-01-15 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Sa
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737-700 (73W) 2:30 Operates only on 2026-01-17 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Di-Do,Sa,So
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737-800 (738) 2:30 Effective 2026-01-18 through 2026-01-28 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Mo,Fr
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-01-23 through 2026-02-02 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Do
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737-700 (73W) 2:30 Effective 2026-01-29 through 2026-02-05 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Di,Sa,So
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737-800 (738) 2:30 Effective 2026-01-31 through 2026-02-10 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Mo,Mi,Fr
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-02-04 through 2026-03-27 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Di,Do,Sa,So
08:25
Addis Ababa (ADD) 2
09:55
Kigali (KGL) Flynas XY 6807 Non-stop Boeing 737-800 (738) 2:30 Effective 2026-02-12 through 2026-03-28 Codeshare flight, operated by Ethiopian Airlines.(ET 807) |
| Mo,Do
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-700 (73W) 2:30 Valid until 2026-01-08 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Di,Fr-So
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-800 (738) 2:30 Valid until 2026-01-09 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Mi
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Valid until 2026-02-18 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Mo,Sa
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-700 (73W) 2:30 Effective 2026-01-10 through 2026-01-12 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Di,Do-So
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-800 (738) 2:30 Effective 2026-01-11 through 2026-01-18 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Mo,Di
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-700 (73W) 2:30 Effective 2026-01-19 through 2026-01-26 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Di,Do-So
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-800 (738) 2:30 Effective 2026-01-22 through 2026-01-27 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Mo,Di,Do
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-700 (73W) 2:30 Effective 2026-01-29 through 2026-02-10 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Fr-So
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-800 (738) 2:30 Effective 2026-01-30 through 2026-02-08 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Mo,Di,Do-So
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-800 (738) 2:30 Effective 2026-02-12 through 2026-02-19 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Mi,Fr
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2026-02-20 through 2026-03-18 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Mo,Di,Do,Sa,So
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-800 (738) 2:30 Effective 2026-02-21 through 2026-03-19 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Mo,Di,Do-So
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737-800 (738) 2:30 Effective 2026-03-20 through 2026-03-28 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Mi
15:15
Addis Ababa (ADD) 2
16:45
Kigali (KGL) Flynas XY 6817 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2026-03-25 Codeshare flight, operated by Ethiopian Airlines.(ET 817) |
| Mo-Fr,So
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-700 (73W) 3:00 Valid until 2026-01-01 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |
| Di,Fr
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-01-02 through 2026-01-06 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |
| Mo,Mi-So
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-700 (73W) 3:00 Effective 2026-01-03 through 2026-01-23 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |
| Di
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-01-13 through 2026-01-20 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |
| Di,Sa
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-01-24 through 2026-01-31 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |
| Mo,Mi-Fr,So
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-700 (73W) 3:00 Effective 2026-01-25 through 2026-02-04 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |
| Mo,Mi,Fr,So
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-700 (73W) 3:00 Effective 2026-02-06 through 2026-02-20 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |
| Sa
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-02-07 through 2026-02-14 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |
| Mo,Mi,Fr-So
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-700 (73W) 3:00 Effective 2026-02-21 through 2026-03-20 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |
| Sa
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-800 (738) 3:00 Operates only on 2026-03-21 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |
| Mo,Mi,Fr-So
23:05
Addis Ababa (ADD) 2
01:05
Kigali (KGL) Flynas XY 6821 Non-stop Boeing 737-700 (73W) 3:00 Effective 2026-03-22 through 2026-03-28 Codeshare flight, operated by Ethiopian Airlines.(ET 821) The flight arrives 1 day after departure. |