| FLUGPLAN |
|---|
| Direktflüge: |
| Fr
09:55
Lyon Saint Exupery (LYS) 1
11:35
Vienna (VIE) 3 Austrian OS 352 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-07-03 through 2026-09-11 |
| Mo,Di,Do,So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Valid until 2026-01-06 |
| Fr
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A321 (321) 1:40 Operates only on 2026-01-02 |
| Mi,Sa
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320 (320) 1:40 Effective 2026-01-03 through 2026-01-07 |
| Fr
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Operates only on 2026-01-09 |
| Mo,So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320 (320) 1:40 Effective 2026-01-11 through 2026-01-12 |
| Mi,Fr
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320neo (32N) 1:40 Effective 2026-01-14 through 2026-01-16 |
| Mo,So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-01-18 through 2026-01-19 |
| Mo,Mi-Fr,So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320 (320) 1:40 Effective 2026-01-21 through 2026-02-04 |
| Do,Sa
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-01-31 through 2026-02-07 |
| Mo,Mi-Fr,So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320 (320) 1:40 Effective 2026-02-06 through 2026-02-13 |
| Mo,Di,Do,Sa,So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-02-14 through 2026-02-22 |
| Mo,Mi,Fr
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320 (320) 1:40 Effective 2026-02-18 through 2026-02-25 |
| Mo,Di,So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-02-24 through 2026-03-02 |
| Di,Do,Fr
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320 (320) 1:40 Effective 2026-02-26 through 2026-03-03 |
| Mo,Mi,Do,Sa,So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-03-04 through 2026-03-09 |
| Di-Fr
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320 (320) 1:40 Effective 2026-03-06 through 2026-03-12 |
| Mo,Mi-So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-03-13 through 2026-03-20 |
| Di,Sa
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320 (320) 1:40 Effective 2026-03-17 through 2026-03-21 |
| Mo-Fr,So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-03-22 through 2026-03-27 |
| Sa
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320 (320) 1:40 Operates only on 2026-03-28 |
| Di,Do,Sa,So
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective from 2026-10-25 |
| Mo,Mi,Fr
12:50
Lyon Saint Exupery (LYS) 1
14:30
Vienna (VIE) 3 Austrian OS 354 Non-stop Airbus A320 (320) 1:40 Effective from 2026-10-26 |
| Täglich
12:55
Lyon Saint Exupery (LYS) 1
14:35
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-03-29 through 2026-06-28 |
| Di-Do,Sa,So
12:55
Lyon Saint Exupery (LYS) 1
14:35
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-06-30 through 2026-09-13 |
| Täglich
12:55
Lyon Saint Exupery (LYS) 1
14:35
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Effective 2026-09-14 through 2026-10-24 |
| Sa
16:00
Lyon Saint Exupery (LYS) 1
17:40
Vienna (VIE) 3 Austrian OS 354 Non-stop Embraer EMB 195 (E95) 1:40 Operates only on 2026-02-28 |