| FLUGPLAN |
|---|
| Direkte Codeshareflüge: |
| Mo
06:15
Sao Paulo Congonhas (CGH)
08:05
Brasilia (BSB) TP 5817 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2026-01-19 Codeshare flight, operated by Gol.(G3 1430) |
| Do,Fr
06:30
Sao Paulo Congonhas (CGH)
08:20
Brasilia (BSB) TP 5817 Non-stop Boeing 737-800 (738) 1:50 Valid until 2026-01-01 Codeshare flight, operated by Gol.(G3 1430) |
| Mo-Fr
06:30
Sao Paulo Congonhas (CGH)
08:20
Brasilia (BSB) TP 5817 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2026-01-02 through 2026-01-13 Codeshare flight, operated by Gol.(G3 1430) |
| Mi
06:30
Sao Paulo Congonhas (CGH)
08:20
Brasilia (BSB) TP 5817 Non-stop Boeing 737-800 (738) 1:50 Effective 2026-01-14 through 2026-01-21 Codeshare flight, operated by Gol.(G3 1430) |
| Di,Do,Fr
06:30
Sao Paulo Congonhas (CGH)
08:20
Brasilia (BSB) TP 5817 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2026-01-15 through 2026-01-22 Codeshare flight, operated by Gol.(G3 1430) |
| Mi-Fr
06:30
Sao Paulo Congonhas (CGH)
08:20
Brasilia (BSB) TP 5817 Non-stop Boeing 737-800 (738) 1:50 Effective 2026-01-23 through 2026-01-29 Codeshare flight, operated by Gol.(G3 1430) |
| Mo,Di,Fr
06:30
Sao Paulo Congonhas (CGH)
08:20
Brasilia (BSB) TP 5817 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2026-01-26 through 2026-01-30 Codeshare flight, operated by Gol.(G3 1430) |
| Mo-Fr
06:30
Sao Paulo Congonhas (CGH)
08:20
Brasilia (BSB) TP 5817 Non-stop Boeing 737-800 (738) 1:50 Effective 2026-02-02 through 2026-02-18 Codeshare flight, operated by Gol.(G3 1430) |
| Mo-Fr
06:30
Sao Paulo Congonhas (CGH)
08:20
Brasilia (BSB) TP 5817 Non-stop Boeing 737-800 (738) 1:50 Effective 2026-02-23 through 2026-02-27 Codeshare flight, operated by Gol.(G3 1430) |
| Sa,So
07:00
Sao Paulo-Guarulhos (GRU) 2
09:20
Salvador (SSA) TP 5817 Non-stop Boeing 737-800 (738) 2:20 Valid until 2026-01-03 Codeshare flight, operated by Gol.(G3 1160) |
| So
07:00
Sao Paulo-Guarulhos (GRU) 2
09:20
Salvador (SSA) TP 5817 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2026-01-04 Codeshare flight, operated by Gol.(G3 1160) |
| Sa,So
07:00
Sao Paulo-Guarulhos (GRU) 2
09:20
Salvador (SSA) TP 5817 Non-stop Boeing 737-800 (738) 2:20 Effective 2026-01-10 through 2026-01-11 Codeshare flight, operated by Gol.(G3 1160) |
| Sa
07:00
Sao Paulo-Guarulhos (GRU) 2
09:20
Salvador (SSA) TP 5817 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2026-01-17 Codeshare flight, operated by Gol.(G3 1160) |
| Sa,So
07:00
Sao Paulo-Guarulhos (GRU) 2
09:20
Salvador (SSA) TP 5817 Non-stop Boeing 737-800 (738) 2:20 Effective 2026-01-18 through 2026-02-08 Codeshare flight, operated by Gol.(G3 1160) |
| Sa,So
07:00
Sao Paulo-Guarulhos (GRU) 2
09:20
Salvador (SSA) TP 5817 Non-stop Boeing 737-800 (738) 2:20 Effective 2026-02-21 through 2026-03-01 Codeshare flight, operated by Gol.(G3 1160) |
| Täglich
07:00
Sao Paulo-Guarulhos (GRU) 2
09:20
Salvador (SSA) TP 5817 Non-stop Boeing 737-800 (738) 2:20 Effective 2026-03-02 through 2026-03-28 Codeshare flight, operated by Gol.(G3 1160) |
| Mo-Do,Sa,So
11:30
Brasilia (BSB)
13:30
Salvador (SSA) TP 5817 Non-stop Boeing 737-800 (738) 2:00 Effective from 2026-07-01 Codeshare flight, operated by Gol.(G3 1682) |