| FLUGPLAN |
|---|
| Direktflüge: |
| So
23:05
Mardin (MQM)
01:15
Izmir (ADB) I XQ 9297 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-03-29 through 2026-10-18 The flight arrives 1 day after departure. |
| Do
23:05
Mardin (MQM)
01:15
Izmir (ADB) I XQ 9297 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective 2026-04-02 through 2026-06-18 The flight arrives 1 day after departure. |
| Do
23:05
Mardin (MQM)
01:15
Izmir (ADB) I XQ 9297 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective 2026-09-10 through 2026-10-22 The flight arrives 1 day after departure. |
| Fr,So
23:10
Mardin (MQM)
01:25
Izmir (ADB) I XQ 9297 Non-stop Boeing 737-800 (73H) 2:15 Effective 2026-01-02 through 2026-02-15 The flight arrives 1 day after departure. |
| Mo
23:10
Mardin (MQM)
01:25
Izmir (ADB) I XQ 9297 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2026-01-19 through 2026-02-09 The flight arrives 1 day after departure. |
| Fr,So
23:10
Mardin (MQM)
01:25
Izmir (ADB) I XQ 9297 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2026-02-20 through 2026-02-22 The flight arrives 1 day after departure. |
| Fr
23:10
Mardin (MQM)
01:25
Izmir (ADB) I XQ 9297 Non-stop Boeing 737-800 (73H) 2:15 Effective 2026-02-27 through 2026-03-06 The flight arrives 1 day after departure. |
| So
23:10
Mardin (MQM)
01:25
Izmir (ADB) I XQ 9297 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Operates only on 2026-03-01 The flight arrives 1 day after departure. |
| Fr,So
23:10
Mardin (MQM)
01:25
Izmir (ADB) I XQ 9297 Non-stop Boeing 737-800 (73H) 2:15 Effective 2026-03-08 through 2026-03-27 The flight arrives 1 day after departure. |