| FLUGPLAN |
|---|
| Direkte Codeshareflüge: |
| Sa
14:45
Melbourne Tullamarine (MEL) 3
16:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:25 Operates only on 2026-04-04 Codeshare flight, operated by Virgin Australia.(VA 691) |
| Sa
14:45
Melbourne Tullamarine (MEL) 3
17:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:25 Effective 2026-04-11 through 2026-10-03 Codeshare flight, operated by Virgin Australia.(VA 691) |
| Sa
14:45
Melbourne Tullamarine (MEL) 3
16:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:25 Effective 2026-10-10 through 2026-10-24 Codeshare flight, operated by Virgin Australia.(VA 691) |
| Sa
14:55
Melbourne Tullamarine (MEL) 3
16:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:15 Effective 2026-01-03 through 2026-03-28 Codeshare flight, operated by Virgin Australia.(VA 691) |
| Mo,Di,So
17:45
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:25 Effective 2026-03-29 through 2026-03-31 Codeshare flight, operated by Virgin Australia.(VA 697) |
| So
17:45
Melbourne Tullamarine (MEL) 3
20:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-700 (73W) 4:25 Operates only on 2026-04-05 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Mo-Fr,So
17:45
Melbourne Tullamarine (MEL) 3
20:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:25 Effective 2026-04-06 through 2026-05-08 Codeshare flight, operated by Virgin Australia.(VA 697) |
| So
17:45
Melbourne Tullamarine (MEL) 3
20:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-700 (73W) 4:25 Effective 2026-05-10 through 2026-06-28 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Mo-Fr
17:45
Melbourne Tullamarine (MEL) 3
20:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:25 Effective 2026-05-11 through 2026-07-03 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Mo-Fr,So
17:45
Melbourne Tullamarine (MEL) 3
20:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:25 Effective 2026-07-05 through 2026-08-07 Codeshare flight, operated by Virgin Australia.(VA 697) |
| So
17:45
Melbourne Tullamarine (MEL) 3
20:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-700 (73W) 4:25 Effective 2026-08-09 through 2026-09-06 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Mo-Fr
17:45
Melbourne Tullamarine (MEL) 3
20:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:25 Effective 2026-08-10 through 2026-09-11 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Mo-Fr,So
17:45
Melbourne Tullamarine (MEL) 3
20:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:25 Effective 2026-09-13 through 2026-10-02 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Mo,Di,So
17:45
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:25 Effective 2026-10-04 through 2026-10-20 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Mo-Mi,Fr,So
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:15 Valid until 2026-01-30 Codeshare flight, operated by Virgin Australia.(VA 697) |
| So
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737 MAX 8 (7M8) 4:15 Effective 2026-02-01 through 2026-03-01 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Mo-Mi,Fr
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:15 Effective 2026-02-02 through 2026-02-09 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Di
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-700 (73W) 4:15 Effective 2026-02-10 through 2026-03-03 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Mo,Mi,Fr
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:15 Effective 2026-02-11 through 2026-03-23 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Di,So
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-700 (73W) 4:15 Effective 2026-03-08 through 2026-03-10 Codeshare flight, operated by Virgin Australia.(VA 697) |
| So
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737 MAX 8 (7M8) 4:15 Effective 2026-03-15 through 2026-03-22 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Di
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-700 (73W) 4:15 Operates only on 2026-03-17 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Di,Mi,Fr
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:15 Effective 2026-03-24 through 2026-03-27 Codeshare flight, operated by Virgin Australia.(VA 697) |
| So
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737 MAX 8 (7M8) 4:15 Effective from 2026-10-25 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Mo-Fr
17:55
Melbourne Tullamarine (MEL) 3
19:10
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:15 Effective from 2026-10-26 Codeshare flight, operated by Virgin Australia.(VA 697) |
| Do
18:00
Melbourne Tullamarine (MEL) 3
19:15
Perth (PER) 1 SQ 6960 Non-stop Boeing 737-800 (73H) 4:15 Valid until 2026-03-26 Codeshare flight, operated by Virgin Australia.(VA 697) |