Qatar Airways flug QR 7154: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direkte Codeshareflüge:
Sa 08:55 Townsville (TSV) 10:50 Brisbane (BNE) D
QR 7154 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2026-03-07
Codeshare flight, operated by Virgin Australia.(VA 384)
So 09:10 Cairns (CNS) 2 13:40 Melbourne Tullamarine (MEL) 3
QR 7154 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Operates only on 2026-03-29
Codeshare flight, operated by Virgin Australia.(VA 1290)
Sa 09:10 Cairns (CNS) 2 13:40 Melbourne Tullamarine (MEL) 3
QR 7154 Non-stop Boeing 737-800 (73H) 3:30 Operates only on 2026-04-04
Codeshare flight, operated by Virgin Australia.(VA 1290)
So 09:10 Cairns (CNS) 2 13:40 Melbourne Tullamarine (MEL) 3
QR 7154 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2026-10-04 through 2026-10-18
Codeshare flight, operated by Virgin Australia.(VA 1290)
Sa 09:10 Cairns (CNS) 2 13:40 Melbourne Tullamarine (MEL) 3
QR 7154 Non-stop Boeing 737-800 (73H) 3:30 Effective 2026-10-10 through 2026-10-24
Codeshare flight, operated by Virgin Australia.(VA 1290)
So 09:30 Sunshine Coast (MCY) 12:05 Sydney (SYD) 2
QR 7154 Non-stop Boeing 737-700 (73W) 1:35 Valid until 2026-01-04
Codeshare flight, operated by Virgin Australia.(VA 484)
So 09:30 Sunshine Coast (MCY) 12:05 Sydney (SYD) 2
QR 7154 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2026-01-18
Codeshare flight, operated by Virgin Australia.(VA 484)
Sa 09:50 Sydney (SYD) 2 10:50 Canberra (CBR)
QR 7154 Non-stop Saab SF340A/B (SF3) 1:00 Effective 2026-04-11 through 2026-07-25
Codeshare flight, operated by Virgin Australia.(VA 638)
Sa 09:50 Sydney (SYD) 2 10:50 Canberra (CBR)
QR 7154 Non-stop Saab SF340A/B (SF3) 1:00 Effective 2026-09-05 through 2026-10-03
Codeshare flight, operated by Virgin Australia.(VA 638)
Mo-Fr 10:30 Cairns (CNS) 2 14:00 Melbourne Tullamarine (MEL) 3
QR 7154 Non-stop Boeing 737-800 (73H) 3:30 Effective 2026-04-06 through 2026-10-02
Codeshare flight, operated by Virgin Australia.(VA 1292)
Mo-Fr 11:40 Cairns (CNS) 2 16:10 Melbourne Tullamarine (MEL) 3
QR 7154 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2026-03-30 through 2026-04-03
Codeshare flight, operated by Virgin Australia.(VA 1292)
Mo-Fr 11:40 Cairns (CNS) 2 16:10 Melbourne Tullamarine (MEL) 3
QR 7154 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2026-10-05 through 2026-10-23
Codeshare flight, operated by Virgin Australia.(VA 1292)
Mo-Fr 11:45 Cairns (CNS) 2 16:10 Melbourne Tullamarine (MEL) 3
QR 7154 Non-stop Boeing 737-800 (73H) 3:25 Valid until 2026-03-27
Codeshare flight, operated by Virgin Australia.(VA 1292)
Mo-Fr 11:45 Cairns (CNS) 2 16:10 Melbourne Tullamarine (MEL) 3
QR 7154 Non-stop Boeing 737-800 (73H) 3:25 Effective from 2026-10-26
Codeshare flight, operated by Virgin Australia.(VA 1292)
So 14:25 Queenstown (ZQN) 15:45 Sydney (SYD) 1
QR 7154 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Operates only on 2026-08-02
Codeshare flight, operated by Virgin Australia.(VA 164)
So 14:25 Queenstown (ZQN) 15:45 Sydney (SYD) 1
QR 7154 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Operates only on 2026-09-06
Codeshare flight, operated by Virgin Australia.(VA 164)
Sa 14:50 Brisbane (BNE) D 18:40 Hobart (HBA) D
QR 7154 Non-stop Boeing 737-800 (73H) 2:50 Effective 2026-01-03 through 2026-01-24
Codeshare flight, operated by Virgin Australia.(VA 1006)
So 14:50 Gold Coast (OOL) 1 17:20 Sydney (SYD) 2
QR 7154 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2026-10-25
Codeshare flight, operated by Virgin Australia.(VA 528)
So 16:30 Queenstown (ZQN) 18:25 Brisbane (BNE) I
QR 7154 Non-stop Boeing 737 MAX 8 (7M8) 3:55 Operates only on 2026-07-26
Codeshare flight, operated by Virgin Australia.(VA 118)
So 17:25 Newman (ZNE) 19:15 Perth (PER) 1
QR 7154 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2026-06-28
Codeshare flight, operated by Virgin Australia.(VA 1892)
So 17:45 Sydney (SYD) 2 19:25 Adelaide (ADL) 1
QR 7154 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-05 through 2026-07-19
Codeshare flight, operated by Virgin Australia.(VA 434)
So 17:45 Sydney (SYD) 2 19:25 Adelaide (ADL) 1
QR 7154 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-09-20 through 2026-09-27
Codeshare flight, operated by Virgin Australia.(VA 434)
So 17:55 Perth (PER) 1 00:30 Melbourne Tullamarine (MEL) 3
QR 7154 Non-stop Boeing 737-800 (73H) 3:35 Operates only on 2026-01-11
Codeshare flight, operated by Virgin Australia.(VA 702)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
Qatar Airways flug QR 7154: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direkte Codeshareflüge:

Qatar Airways QR7154
Operates only on 2026-03-07
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Virgin Australia. (VA 384)
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Direkte Codeshareflüge:

Qatar Airways QR7154
Operates only on 2026-03-29
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 1290)
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Direkte Codeshareflüge:

Qatar Airways QR7154
Operates only on 2026-04-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Virgin Australia. (VA 1290)
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Direkte Codeshareflüge:

Qatar Airways QR7154
Effective 2026-10-04 through 2026-10-18
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 1290)
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Direkte Codeshareflüge:

Qatar Airways QR7154
Effective 2026-10-10 through 2026-10-24
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Virgin Australia. (VA 1290)
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Direkte Codeshareflüge:

Qatar Airways QR7154
Valid until 2026-01-04
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 484)
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Direkte Codeshareflüge:

Qatar Airways QR7154
Operates only on 2026-01-18
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 484)
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Direkte Codeshareflüge:

Qatar Airways QR7154
Effective 2026-04-11 through 2026-07-25
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Virgin Australia. (VA 638)
Duration: 1:00, non-stop
Saab SF340A/B (SF3)

Direkte Codeshareflüge:

Qatar Airways QR7154
Effective 2026-09-05 through 2026-10-03
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Virgin Australia. (VA 638)
Duration: 1:00, non-stop
Saab SF340A/B (SF3)

Direkte Codeshareflüge:

Qatar Airways QR7154
Effective 2026-04-06 through 2026-10-02
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Codeshare flight, operated by Virgin Australia. (VA 1292)
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Direkte Codeshareflüge:

Qatar Airways QR7154
Effective 2026-03-30 through 2026-04-03
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Codeshare flight, operated by Virgin Australia. (VA 1292)
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Direkte Codeshareflüge:

Qatar Airways QR7154
Effective 2026-10-05 through 2026-10-23
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Codeshare flight, operated by Virgin Australia. (VA 1292)
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Direkte Codeshareflüge:

Qatar Airways QR7154
Valid until 2026-03-27
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Codeshare flight, operated by Virgin Australia. (VA 1292)
Duration: 3:25, non-stop
Boeing 737-800 (73H)

Direkte Codeshareflüge:

Qatar Airways QR7154
Effective from 2026-10-26
Mo
Di
Mi
Do
Fr
Sa
-
So
-
Codeshare flight, operated by Virgin Australia. (VA 1292)
Duration: 3:25, non-stop
Boeing 737-800 (73H)

Direkte Codeshareflüge:

Qatar Airways QR7154
Operates only on 2026-08-02
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 164)
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Direkte Codeshareflüge:

Qatar Airways QR7154
Operates only on 2026-09-06
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 164)
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Direkte Codeshareflüge:

Qatar Airways QR7154
14:50

18:40
Effective 2026-01-03 through 2026-01-24
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Codeshare flight, operated by Virgin Australia. (VA 1006)
Duration: 2:50, non-stop
Boeing 737-800 (73H)

Direkte Codeshareflüge:

Qatar Airways QR7154
14:50

17:20
Operates only on 2026-10-25
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 528)
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Direkte Codeshareflüge:

Qatar Airways QR7154
Operates only on 2026-07-26
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 118)
Duration: 3:55, non-stop
Boeing 737 MAX 8 (7M8)

Direkte Codeshareflüge:

Qatar Airways QR7154
17:25

19:15
Operates only on 2026-06-28
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 1892)
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Direkte Codeshareflüge:

Qatar Airways QR7154
17:45

19:25
Effective 2026-07-05 through 2026-07-19
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 434)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direkte Codeshareflüge:

Qatar Airways QR7154
17:45

19:25
Effective 2026-09-20 through 2026-09-27
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 434)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Direkte Codeshareflüge:

Qatar Airways QR7154
Operates only on 2026-01-11
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Codeshare flight, operated by Virgin Australia. (VA 702)
Duration: 3:35, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
  • Brisbane (BNE) - Hobart (HBA)
  • Cairns (CNS) - Melbourne Tullamarine (MEL)
  • Gold Coast (OOL) - Sydney (SYD)
  • Newman (ZNE) - Perth (PER)
  • Perth (PER) - Melbourne Tullamarine (MEL)
  • Queenstown (ZQN) - Brisbane (BNE)
  • Queenstown (ZQN) - Sydney (SYD)
  • Sunshine Coast (MCY) - Sydney (SYD)
  • Sydney (SYD) - Adelaide (ADL)
  • Sydney (SYD) - Canberra (CBR)
  • Townsville (TSV) - Brisbane (BNE)