| FLUGPLAN |
|---|
| Direktflüge: |
| Fr
23:30
Florianopolis (FLN)
02:05
Cordoba (COR) G3 9448 Non-stop Boeing 737-800 (738) 2:35 Effective 2026-01-02 through 2026-01-16 The flight arrives 1 day after departure. This is a Non-scheduled Passenger flight. |
| Mo,Mi,So
23:30
Florianopolis (FLN)
02:05
Cordoba (COR) G3 9448 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2026-01-04 through 2026-01-18 The flight arrives 1 day after departure. This is a Non-scheduled Passenger flight. |
| Mo,Fr
23:30
Florianopolis (FLN)
02:05
Cordoba (COR) G3 9448 Non-stop Boeing 737-800 (738) 2:35 Effective 2026-01-19 through 2026-01-26 The flight arrives 1 day after departure. This is a Non-scheduled Passenger flight. |
| Mi,So
23:30
Florianopolis (FLN)
02:05
Cordoba (COR) G3 9448 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2026-01-21 through 2026-01-25 The flight arrives 1 day after departure. This is a Non-scheduled Passenger flight. |
| Mo,Mi,Fr,So
23:30
Florianopolis (FLN)
02:05
Cordoba (COR) G3 9448 Non-stop Boeing 737-800 (738) 2:35 Effective 2026-01-28 through 2026-02-02 The flight arrives 1 day after departure. This is a Non-scheduled Passenger flight. |
| Mo,Fr,So
23:30
Florianopolis (FLN)
02:05
Cordoba (COR) G3 9448 Non-stop Boeing 737-800 (738) 2:35 Effective 2026-02-06 through 2026-02-13 The flight arrives 1 day after departure. This is a Non-scheduled Passenger flight. |
| Mo,Mi,Fr,So
23:30
Florianopolis (FLN)
02:05
Cordoba (COR) G3 9448 Non-stop Boeing 737-800 (738) 2:35 Effective 2026-04-01 through 2026-04-10 The flight arrives 1 day after departure. This is a Non-scheduled Passenger flight. |