Gol flug G3 9072: Multiple routes

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Mi,Fr 00:05 Sao Paulo-Guarulhos (GRU) 2 03:05 Maceio (MCZ)
G3 9072 Non-stop Boeing 737-800 (738) 3:00 Effective 2026-04-01 through 2026-04-29
Sa 17:15 Sao Paulo-Guarulhos (GRU) 2 20:35 Teresina (THE)
G3 9072 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Operates only on 2026-01-03
This is a Non-scheduled Passenger flight.
This flight number is listed as serving the following routes:
Gol flug G3 9072: Multiple routes
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Gol G39072
Effective 2026-04-01 through 2026-04-29
Mo
-
Di
-
Mi
Do
-
Fr
Sa
-
So
-
Duration: 3:00, non-stop
Boeing 737-800 (738)

Direktflüge:

Gol G39072
Operates only on 2026-01-03
This is a Non-scheduled Passenger flight.
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)
This flight number is listed as serving the following routes:
  • Sao Paulo-Guarulhos (GRU) - Maceio (MCZ)
  • Sao Paulo-Guarulhos (GRU) - Teresina (THE)