| FLUGPLAN |
|---|
| Direktflüge: |
| Do
21:20
Geneva (GVA) 1
06:10
Addis Ababa (ADD) 2 ET 739 Non-stop Boeing 787-8 (788) 6:50 Operates only on 2026-01-01 The flight arrives 1 day after departure. |
| Di,Do
21:20
Geneva (GVA) 1
06:10
Addis Ababa (ADD) 2 ET 739 Non-stop Airbus A350-900 (359) 6:50 Effective 2026-01-06 through 2026-03-26 The flight arrives 1 day after departure. |
| Di,Do
21:20
Geneva (GVA) 1
06:10
Addis Ababa (ADD) 2 ET 739 Non-stop Airbus A350-900 (359) 6:50 Effective from 2026-10-27 The flight arrives 1 day after departure. |
| Sa
22:15
Geneva (GVA) 1
07:05
Addis Ababa (ADD) 2 ET 739 Non-stop Airbus A350-900 (359) 6:50 Valid until 2026-03-28 The flight arrives 1 day after departure. |
| Di,Do,Sa
22:15
Geneva (GVA) 1
06:05
Addis Ababa (ADD) 2 ET 739 Non-stop Airbus A350-900 (359) 6:50 Effective 2026-03-31 through 2026-10-24 The flight arrives 1 day after departure. |