| FLUGPLAN |
|---|
| Direkte Codeshareflüge: |
| Sa
05:45
Salvador (SSA)
07:30
Belo Horizonte (CNF) UX 2309 Non-stop Boeing 737-700 (73G) 1:45 Operates only on 2026-01-03 Codeshare flight, operated by Gol.(G3 9142) This is a Non-scheduled Passenger flight. |
| Sa
05:45
Salvador (SSA)
07:30
Belo Horizonte (CNF) UX 2309 Non-stop Boeing 737-800 (738) 1:45 Effective 2026-01-10 through 2026-01-17 Codeshare flight, operated by Gol.(G3 9142) This is a Non-scheduled Passenger flight. |
| Mo,Di
06:05
Salvador (SSA)
07:50
Belo Horizonte (CNF) UX 2309 Non-stop Boeing 737-800 (738) 1:45 Valid until 2026-01-06 Codeshare flight, operated by Gol.(G3 9142) This is a Non-scheduled Passenger flight. |
| Mo
06:05
Salvador (SSA)
07:50
Belo Horizonte (CNF) UX 2309 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2026-01-12 Codeshare flight, operated by Gol.(G3 9142) This is a Non-scheduled Passenger flight. |
| Di
06:05
Salvador (SSA)
07:50
Belo Horizonte (CNF) UX 2309 Non-stop Boeing 737-800 (738) 1:45 Operates only on 2026-01-13 Codeshare flight, operated by Gol.(G3 9142) This is a Non-scheduled Passenger flight. |
| So
23:45
Salvador (SSA)
01:20
Belo Horizonte (CNF) UX 2309 Non-stop Boeing 737-800 (738) 1:35 Effective 2026-03-29 through 2026-06-21 Codeshare flight, operated by Gol.(G3 1950) The flight arrives 1 day after departure. |
| Mo,Fr
23:45
Salvador (SSA)
01:35
Belo Horizonte (CNF) UX 2309 Non-stop Boeing 737-800 (738) 1:50 Effective 2026-03-30 through 2026-06-15 Codeshare flight, operated by Gol.(G3 1950) The flight arrives 1 day after departure. |
| Mo,Mi,Fr
23:45
Salvador (SSA)
01:35
Belo Horizonte (CNF) UX 2309 Non-stop Boeing 737-800 (738) 1:50 Effective 2026-06-17 through 2026-06-26 Codeshare flight, operated by Gol.(G3 1950) The flight arrives 1 day after departure. |
| Di,Mi,Fr
23:45
Salvador (SSA)
01:35
Belo Horizonte (CNF) UX 2309 Non-stop Boeing 737-800 (738) 1:50 Effective 2026-06-30 through 2026-10-13 Codeshare flight, operated by Gol.(G3 1950) The flight arrives 1 day after departure. |
| Di,Fr
23:45
Salvador (SSA)
01:35
Belo Horizonte (CNF) UX 2309 Non-stop Boeing 737-800 (738) 1:50 Effective from 2026-10-16 Codeshare flight, operated by Gol.(G3 1950) The flight arrives 1 day after departure. |