Air Dolomiti flug EN 8113: EuroAirport Swiss, Mulhouse/Basel - Frankfurt

Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:
Mo,So 06:00 EuroAirport Swiss, Mulhouse/Basel (BSL) 07:00 Frankfurt (FRA) 1
EN 8113 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:00 Effective 2026-03-29 through 2026-04-13
Täglich 06:00 EuroAirport Swiss, Mulhouse/Basel (BSL) 07:00 Frankfurt (FRA) 1
EN 8113 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:00 Effective from 2026-05-22
Do 06:30 EuroAirport Swiss, Mulhouse/Basel (BSL) 07:35 Frankfurt (FRA) 1
EN 8113 Non-stop Embraer EMB 195 (E95) 1:05 Effective 2026-02-05 through 2026-03-26
Sa 06:40 EuroAirport Swiss, Mulhouse/Basel (BSL) 07:45 Frankfurt (FRA) 1
EN 8113 Non-stop Embraer EMB 195 (E95) 1:05 Effective 2026-02-07 through 2026-03-28
Mo,Fr,So 06:45 EuroAirport Swiss, Mulhouse/Basel (BSL) 07:50 Frankfurt (FRA) 1
EN 8113 Non-stop Embraer EMB 195 (E95) 1:05 Effective 2026-02-02 through 2026-02-09
Mi 06:45 EuroAirport Swiss, Mulhouse/Basel (BSL) 07:50 Frankfurt (FRA) 1
EN 8113 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:05 Operates only on 2026-02-04
Mi,Fr,So 06:45 EuroAirport Swiss, Mulhouse/Basel (BSL) 07:50 Frankfurt (FRA) 1
EN 8113 Non-stop Embraer EMB 195 (E95) 1:05 Effective 2026-02-11 through 2026-02-22
Mo 06:45 EuroAirport Swiss, Mulhouse/Basel (BSL) 07:50 Frankfurt (FRA) 1
EN 8113 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:05 Operates only on 2026-02-16
Mo,Mi,Fr,So 06:45 EuroAirport Swiss, Mulhouse/Basel (BSL) 07:50 Frankfurt (FRA) 1
EN 8113 Non-stop Embraer EMB 195 (E95) 1:05 Effective 2026-02-23 through 2026-03-27
Di 06:50 EuroAirport Swiss, Mulhouse/Basel (BSL) 07:55 Frankfurt (FRA) 1
EN 8113 Non-stop Embraer EMB 195 (E95) 1:05 Effective 2026-02-03 through 2026-03-24
Air Dolomiti flug EN 8113:
EuroAirport Swiss, Mulhouse/Basel - Frankfurt
Wählen Sie ein Flugdatum:
FLUGPLAN
Direktflüge:

Air Dolomiti EN8113
Effective 2026-03-29 through 2026-04-13
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
Duration: 1:00, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direktflüge:

Air Dolomiti EN8113
Effective from 2026-05-22
Mo
Di
Mi
Do
Fr
Sa
So
Duration: 1:00, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direktflüge:

Air Dolomiti EN8113
Effective 2026-02-05 through 2026-03-26
Mo
-
Di
-
Mi
-
Do
Fr
-
Sa
-
So
-
Duration: 1:05, non-stop
Embraer EMB 195 (E95)

Direktflüge:

Air Dolomiti EN8113
Effective 2026-02-07 through 2026-03-28
Mo
-
Di
-
Mi
-
Do
-
Fr
-
Sa
So
-
Duration: 1:05, non-stop
Embraer EMB 195 (E95)

Direktflüge:

Air Dolomiti EN8113
Effective 2026-02-02 through 2026-02-09
Mo
Di
-
Mi
-
Do
-
Fr
Sa
-
So
Duration: 1:05, non-stop
Embraer EMB 195 (E95)

Direktflüge:

Air Dolomiti EN8113
Operates only on 2026-02-04
Mo
-
Di
-
Mi
Do
-
Fr
-
Sa
-
So
-
Duration: 1:05, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direktflüge:

Air Dolomiti EN8113
Effective 2026-02-11 through 2026-02-22
Mo
-
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 1:05, non-stop
Embraer EMB 195 (E95)

Direktflüge:

Air Dolomiti EN8113
Operates only on 2026-02-16
Mo
Di
-
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:05, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direktflüge:

Air Dolomiti EN8113
Effective 2026-02-23 through 2026-03-27
Mo
Di
-
Mi
Do
-
Fr
Sa
-
So
Duration: 1:05, non-stop
Embraer EMB 195 (E95)

Direktflüge:

Air Dolomiti EN8113
Effective 2026-02-03 through 2026-03-24
Mo
-
Di
Mi
-
Do
-
Fr
-
Sa
-
So
-
Duration: 1:05, non-stop
Embraer EMB 195 (E95)
  • EN 8113 ist ein internationaler Flug Abflug vom EuroAirport Swiss, Mulhouse/Basel, Switzerland (BSL) und Ankunft am Frankfurt, Germany (FRA).
  • Der Flug geht über eine Entfernung von 175 Meilen oder 282 Kilometer.
  • Der Abflug- und der Zielflughafen liegen in folgender/folgenden Zeitzone/n UTC+1 . Die aktuelle Zeit in beiden Flughäfen ist (loading...).
  • Bei Direktflügen kann die Flugzeit zwischen 1:00 und 1:05 betragen.