| FLUGPLAN |
|---|
| Direktflüge: |
| Di,Sa
16:55
Tianjin (TSN) 2
20:10
Guiyang (KWE) CA 2877 Non-stop Boeing 737-800 (738) 3:15 Effective 2026-03-31 through 2026-10-24 |
| Mo,Mi-Fr,So
17:00
Tianjin (TSN) 2
20:10
Guiyang (KWE) CA 2877 Non-stop Boeing 737-800 (738) 3:10 Effective 2026-03-29 through 2026-10-23 |