FLUGPLAN |
---|
Direkte Codeshareflüge: |
Sa
10:55
Brisbane (BNE) D
13:20
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-04-13 through 2024-08-24 Codeshare flight, operated by Virgin Australia International.(VA 324) |
Mo,Do,Fr,So
12:55
Brisbane (BNE) D
16:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2024-01-28 Codeshare flight, operated by Virgin Australia International.(VA 328) |
Mo,Fr,So
12:55
Brisbane (BNE) D
16:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-02-12 through 2024-03-29 Codeshare flight, operated by Virgin Australia International.(VA 328) |
Mo,Do,Fr,So
12:55
Brisbane (BNE) D
16:20
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-03-31 through 2024-04-05 Codeshare flight, operated by Virgin Australia International.(VA 328) |
Mo,Do,Fr,So
12:55
Brisbane (BNE) D
15:20
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-04-07 through 2024-08-30 Codeshare flight, operated by Virgin Australia International.(VA 328) |
Mo,Do-So
12:55
Brisbane (BNE) D
15:20
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-08-31 through 2024-10-05 Codeshare flight, operated by Virgin Australia International.(VA 328) |
Mo,Do-So
12:55
Brisbane (BNE) D
16:20
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-10-06 through 2024-10-26 Codeshare flight, operated by Virgin Australia International.(VA 328) |
Mo,Fr,So
12:55
Brisbane (BNE) D
16:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Effective from 2024-10-27 Codeshare flight, operated by Virgin Australia International.(VA 328) |
Di-Do,Sa
13:55
Brisbane (BNE) D
17:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-01-30 through 2024-02-10 Codeshare flight, operated by Virgin Australia International.(VA 332) |
Do
13:55
Brisbane (BNE) D
17:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-02-15 Codeshare flight, operated by Virgin Australia International.(VA 332) |
Do,Sa
13:55
Brisbane (BNE) D
17:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-02-22 through 2024-03-07 Codeshare flight, operated by Virgin Australia International.(VA 332) |
Do,Sa
13:55
Brisbane (BNE) D
17:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-03-14 through 2024-03-28 Codeshare flight, operated by Virgin Australia International.(VA 332) |
Di,Mi
13:55
Brisbane (BNE) D
16:20
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-04-09 through 2024-10-02 Codeshare flight, operated by Virgin Australia International.(VA 332) |
Di,Mi,Sa
14:55
Brisbane (BNE) D
18:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2024-01-27 Codeshare flight, operated by Virgin Australia International.(VA 334) |
Di,Mi,Sa
14:55
Brisbane (BNE) D
18:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-02-13 through 2024-02-21 Codeshare flight, operated by Virgin Australia International.(VA 334) |
Di,Mi
14:55
Brisbane (BNE) D
18:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-02-27 through 2024-03-06 Codeshare flight, operated by Virgin Australia International.(VA 334) |
Di,Mi,Sa
14:55
Brisbane (BNE) D
18:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-03-09 through 2024-03-13 Codeshare flight, operated by Virgin Australia International.(VA 334) |
Di,Mi
14:55
Brisbane (BNE) D
18:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-03-19 through 2024-03-27 Codeshare flight, operated by Virgin Australia International.(VA 334) |
Sa
14:55
Brisbane (BNE) D
18:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-03-30 Codeshare flight, operated by Virgin Australia International.(VA 334) |
Di,Mi,Sa
14:55
Brisbane (BNE) D
18:20
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-04-02 through 2024-04-06 Codeshare flight, operated by Virgin Australia International.(VA 334) |
Mo,Fr,So
15:55
Brisbane (BNE) D
19:15
Melbourne (MEL) 3 AC 2782 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-01-29 through 2024-02-11 Codeshare flight, operated by Virgin Australia International.(VA 336) |