航班時刻表 |
---|
直飛航班 |
星期三
17:50
Tucuman (TUC)
19:40
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-800 (738) 1:50 Valid until 2024-09-04 |
星期四
17:50
Tucuman (TUC)
19:40
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Valid until 2024-09-26 |
星期六
17:50
Tucuman (TUC)
19:40
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-700 (73R) 1:50 Operates only on 2024-09-21 |
星期三
17:50
Tucuman (TUC)
19:40
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-800 (738) 1:50 Operates only on 2024-09-25 |
星期一
17:50
Tucuman (TUC)
19:40
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Operates only on 2024-09-30 |
星期三
17:50
Tucuman (TUC)
19:40
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-700 (73R) 1:50 Effective from 2025-01-01 |
星期一,星期四
17:55
Tucuman (TUC)
19:45
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-700 (73R) 1:50 Effective from 2025-01-02 |
星期六
17:55
Tucuman (TUC)
19:45
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-800 (738) 1:50 Effective from 2025-01-04 |
星期日
17:55
Tucuman (TUC)
19:45
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-200 Combi (73M) 1:50 Effective from 2025-01-05 |
星期一,星期五-星期日
18:00
Tucuman (TUC)
19:50
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-700 (73R) 1:50 Valid until 2024-09-01 |
星期一,星期五
18:00
Tucuman (TUC)
19:50
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-800 (738) 1:50 Effective 2024-09-02 through 2024-09-06 |
星期六,星期日
18:00
Tucuman (TUC)
19:50
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-700 (73R) 1:50 Effective 2024-09-07 through 2024-09-15 |
星期一
18:00
Tucuman (TUC)
19:50
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Effective 2024-09-09 through 2024-09-23 |
星期六
18:00
Tucuman (TUC)
19:50
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-700 (73R) 1:50 Operates only on 2024-09-28 |
星期二-星期六
18:00
Tucuman (TUC)
19:50
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Effective 2024-10-01 through 2024-12-31 |
星期一
18:00
Tucuman (TUC)
19:50
Buenos Aires Jorge Newbery Airfield (AEP) AR 1483 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Effective 2024-10-07 through 2024-12-30 |
星期五
18:00
Tucuman (TUC)
19:50
Ministro Pistarini, Buenos Aires (EZE) DA AR 1483 Non-stop Boeing 737-700 (73R) 1:50 Effective from 2025-01-03 |
星期二
18:00
Tucuman (TUC)
19:50
Buenos Aires Jorge Newbery Airfield (AEP) AR 1483 Non-stop Boeing 737-200 Combi (73M) 1:50 Effective from 2025-01-07 |