航班時刻表 |
---|
直飛航班 |
星期三,星期四
04:40
Buenos Aires Jorge Newbery Airfield (AEP)
06:40
Mendoza (MDZ) AR 1400 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:00 Effective 2024-10-02 through 2024-12-26 |
星期三,星期五
04:45
Buenos Aires Jorge Newbery Airfield (AEP)
06:45
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-800 (738) 2:00 Valid until 2024-09-11 |
星期五
04:45
Buenos Aires Jorge Newbery Airfield (AEP)
06:45
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-200 Combi (73M) 2:00 Operates only on 2024-09-13 |
星期三
04:45
Buenos Aires Jorge Newbery Airfield (AEP)
06:45
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-09-18 through 2024-09-25 |
星期五
04:45
Buenos Aires Jorge Newbery Airfield (AEP)
06:45
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-700 (73R) 2:00 Operates only on 2024-09-20 |
星期五
04:45
Buenos Aires Jorge Newbery Airfield (AEP)
06:45
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-800 (738) 2:00 Operates only on 2024-09-27 |
星期二,星期五
04:45
Buenos Aires Jorge Newbery Airfield (AEP)
06:45
Mendoza (MDZ) AR 1400 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:00 Effective 2024-10-01 through 2024-12-31 |
星期六
04:45
Ministro Pistarini, Buenos Aires (EZE) P
06:45
Mendoza (MDZ) AR 1400 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:00 Effective 2024-10-05 through 2024-12-28 |
星期日
04:45
Buenos Aires Jorge Newbery Airfield (AEP)
06:45
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-10-06 through 2024-12-29 |
星期一
04:45
Buenos Aires Jorge Newbery Airfield (AEP)
06:45
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-200 Combi (73M) 2:00 Effective 2024-10-07 through 2024-12-30 |
星期六
04:55
Ministro Pistarini, Buenos Aires (EZE) P
06:55
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-700 (73R) 2:00 Valid until 2024-09-07 |
星期一
04:55
Ministro Pistarini, Buenos Aires (EZE) P
06:55
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-800 (738) 2:00 Valid until 2024-09-09 |
星期二,星期四
04:55
Buenos Aires Jorge Newbery Airfield (AEP)
06:55
Mendoza (MDZ) AR 1400 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:00 Valid until 2024-09-26 |
星期一
04:55
Ministro Pistarini, Buenos Aires (EZE) P
06:55
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-200 Combi (73M) 2:00 Operates only on 2024-09-16 |
星期一,星期六
04:55
Ministro Pistarini, Buenos Aires (EZE) P
06:55
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-09-21 through 2024-09-30 |
星期日
05:00
Ministro Pistarini, Buenos Aires (EZE) P
07:00
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-700 (73R) 2:00 Operates only on 2024-09-01 |
星期日
05:00
Ministro Pistarini, Buenos Aires (EZE) P
07:00
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-09-08 through 2024-09-29 |
星期六
05:05
Ministro Pistarini, Buenos Aires (EZE) P
07:05
Mendoza (MDZ) AR 1400 Non-stop Boeing 737-800 (738) 2:00 Operates only on 2024-09-14 |
星期二
05:10
Buenos Aires Jorge Newbery Airfield (AEP)
07:10
Mendoza (MDZ) AR 1400 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:00 Effective from 2025-01-07 |
星期三,星期六
05:45
Buenos Aires Jorge Newbery Airfield (AEP)
07:45
Mendoza (MDZ) AR 1400 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:00 Effective from 2025-01-01 |
星期四
06:00
Buenos Aires Jorge Newbery Airfield (AEP)
08:00
Mendoza (MDZ) AR 1400 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:00 Effective from 2025-01-02 |