Tucson (TUS)到Minneapolis/Saint Paul (MSP)全部航班

选择出发日期:
航班时刻表
直达航班
日 19:52 Tucson (TUS) 23:57 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 662 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-02-16
日 20:04 Tucson (TUS) 00:10 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 662 Non-stop Boeing 737-800 (738) 3:06 Operates only on 2024-12-22
此航班在起飞后隔一天抵达。
日 20:12 Tucson (TUS) 00:11 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 662 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-02
此航班在起飞后隔一天抵达。
日 17:30 Tucson (TUS) 21:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Operates only on 2024-11-24
五 17:39 Tucson (TUS) 21:45 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Operates only on 2024-11-22
一 18:05 Tucson (TUS) 23:12 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:07 Operates only on 2025-04-14
日 18:10 Tucson (TUS) 22:16 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Operates only on 2024-12-01
日 18:17 Tucson (TUS) 23:16 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-09
日 18:30 Tucson (TUS) 23:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:07 Operates only on 2025-04-13
一 18:32 Tucson (TUS) 23:31 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-04-07
四 18:34 Tucson (TUS) 23:33 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-20
一 18:34 Tucson (TUS) 23:33 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-31
一 18:35 Tucson (TUS) 23:34 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-24
五 18:35 Tucson (TUS) 23:42 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:07 Operates only on 2025-04-11
一 18:40 Tucson (TUS) 23:39 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-10
四 18:41 Tucson (TUS) 23:40 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-13
五 18:45 Tucson (TUS) 22:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Operates only on 2024-12-13
一 18:45 Tucson (TUS) 23:44 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-17
四 18:50 Tucson (TUS) 23:57 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:07 Operates only on 2025-04-10
日 18:54 Tucson (TUS) 23:53 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-30
五 18:55 Tucson (TUS) 23:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-04-04
四 19:00 Tucson (TUS) 22:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-02-20
五,日 19:00 Tucson (TUS) 23:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Effective 2025-03-14 through 2025-03-23
四 19:00 Tucson (TUS) 23:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Effective 2025-03-27 through 2025-04-03
日 19:00 Tucson (TUS) 23:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-04-06
一 19:06 Tucson (TUS) 23:05 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-02-24
五 19:10 Tucson (TUS) 00:09 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-28
此航班在起飞后隔一天抵达。
六 19:20 Tucson (TUS) 23:25 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-01-18
一 19:20 Tucson (TUS) 23:25 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-02-10
五 19:22 Tucson (TUS) 23:28 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Operates only on 2024-12-06
日 19:23 Tucson (TUS) 23:28 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-01-12
四 19:23 Tucson (TUS) 23:28 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-02-13
一,四 19:30 Tucson (TUS) 23:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Effective 2024-12-19 through 2024-12-23
三,四 19:30 Tucson (TUS) 23:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Effective 2025-01-01 through 2025-01-02
四 19:34 Tucson (TUS) 23:33 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Effective 2025-02-27 through 2025-03-06
一,二,五 19:37 Tucson (TUS) 23:43 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Effective 2024-12-27 through 2024-12-31
日 19:38 Tucson (TUS) 23:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-02-23
二 19:40 Tucson (TUS) 23:46 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Operates only on 2024-12-24
五 19:40 Tucson (TUS) 23:45 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-02-07
一 19:40 Tucson (TUS) 23:39 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-03
日 19:42 Tucson (TUS) 23:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Operates only on 2024-12-15
四 19:43 Tucson (TUS) 23:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-01-16
四 19:43 Tucson (TUS) 23:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-01-30
一 19:44 Tucson (TUS) 23:49 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-02-17
四 19:45 Tucson (TUS) 23:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:06 Operates only on 2024-12-26
五 19:45 Tucson (TUS) 23:44 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 2:59 Operates only on 2025-03-07
日 19:46 Tucson (TUS) 23:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-01-19
五 19:46 Tucson (TUS) 23:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-02-14
四,日 19:49 Tucson (TUS) 23:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Effective 2025-01-23 through 2025-01-26
四 19:49 Tucson (TUS) 23:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 664 Non-stop Boeing 737-800 (738) 3:05 Operates only on 2025-02-06
1 2   next


Tucson (TUS)到Minneapolis/Saint Paul (MSP)全部航班
选择出发日期:
航班时刻表
直达航班

Operates only on 2025-02-16

-

-

-

-

-

-

Duration: 3:05, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-22

-

-

-

-

-

-

Duration: 3:06, non-stop
Boeing 737-800 (738)
此航班在起飞后隔一天抵达。

Operates only on 2025-03-02

-

-

-

-

-

-

Duration: 2:59, non-stop
Boeing 737-800 (738)
此航班在起飞后隔一天抵达。

Operates only on 2024-11-24

-

-

-

-

-

-

Duration: 3:06, non-stop
Boeing 737-800 (738)

Operates only on 2024-11-22

-

-

-

-


-

-
Duration: 3:06, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-14


-

-

-

-

-

-
Duration: 3:07, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 3:06, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-09

-

-

-

-

-

-

Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-13

-

-

-

-

-

-

Duration: 3:07, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-07


-

-

-

-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-20

-

-

-


-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-31


-

-

-

-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-24


-

-

-

-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-11

-

-

-

-


-

-
Duration: 3:07, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-10


-

-

-

-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-13

-

-

-


-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-13

-

-

-

-


-

-
Duration: 3:06, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-17


-

-

-

-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-10

-

-

-


-

-

-
Duration: 3:07, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-30

-

-

-

-

-

-

Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-04

-

-

-

-


-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-20

-

-

-


-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Effective 2025-03-14 through 2025-03-23

-

-

-

-


-

Duration: 2:59, non-stop
Boeing 737-800 (738)

Effective 2025-03-27 through 2025-04-03

-

-

-


-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-06

-

-

-

-

-

-

Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-24


-

-

-

-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-28

-

-

-

-


-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)
此航班在起飞后隔一天抵达。

Operates only on 2025-01-18

-

-

-

-

-


-
Duration: 3:05, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-10


-

-

-

-

-

-
Duration: 3:05, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-06

-

-

-

-


-

-
Duration: 3:06, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-12

-

-

-

-

-

-

Duration: 3:05, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-13

-

-

-


-

-

-
Duration: 3:05, non-stop
Boeing 737-800 (738)

Effective 2024-12-19 through 2024-12-23


-

-


-

-

-
Duration: 3:06, non-stop
Boeing 737-800 (738)

Effective 2025-01-01 through 2025-01-02

-

-



-

-

-
Duration: 3:06, non-stop
Boeing 737-800 (738)

Effective 2025-02-27 through 2025-03-06

-

-

-


-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Effective 2024-12-27 through 2024-12-31



-

-


-

-
Duration: 3:06, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-23

-

-

-

-

-

-

Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-24

-


-

-

-

-

-
Duration: 3:06, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-07

-

-

-

-


-

-
Duration: 3:05, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-03


-

-

-

-

-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-15

-

-

-

-

-

-

Duration: 3:06, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-16

-

-

-


-

-

-
Duration: 3:05, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-30

-

-

-


-

-

-
Duration: 3:05, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-17


-

-

-

-

-

-
Duration: 3:05, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-26

-

-

-


-

-

-
Duration: 3:06, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-07

-

-

-

-


-

-
Duration: 2:59, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-19

-

-

-

-

-

-

Duration: 3:05, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-14

-

-

-

-


-

-
Duration: 3:05, non-stop
Boeing 737-800 (738)

Effective 2025-01-23 through 2025-01-26

-

-

-


-

-

Duration: 3:05, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-06

-

-

-


-

-

-
Duration: 3:05, non-stop
Boeing 737-800 (738)
Page 1 / 2        next
  • 国内航线 从 Tucson (TUS)机场出发,到达 Minneapolis/Saint Paul (MSP)机场。
  • 航班飞行距离为 1296英里( 2086公里)。
  • 出发地的时区为 UTC-7 , 目的地的时区为 UTC-6 . 出发地的当前时间是 (loading...),目的地的当前时间是 (loading...)。 两地时差 (loading...)小时。
  • 直达航班的最短飞行时间为2:59 ,最长飞行时间为3:14。