San Diego (SAN)到Minneapolis/Saint Paul (MSP)全部航班

选择出发日期:
航班时刻表
直达航班
日 17:45 San Diego (SAN) 1 23:25 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2024-10-20
五 17:45 San Diego (SAN) 1 23:30 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:45 Operates only on 2025-04-18
三,五 17:46 San Diego (SAN) 1 23:24 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Effective 2024-12-20 through 2024-12-25
三,日 17:46 San Diego (SAN) 1 23:24 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Effective 2025-01-01 through 2025-01-05
四 17:48 San Diego (SAN) 1 23:28 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2024-10-31
五 17:48 San Diego (SAN) 1 23:26 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-01-03
四 17:48 San Diego (SAN) 1 23:26 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-02-13
二 17:50 San Diego (SAN) 1 23:35 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:45 Operates only on 2024-09-03
一,四 17:50 San Diego (SAN) 1 23:25 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:35 Effective 2024-11-04 through 2024-11-07
一,四 17:50 San Diego (SAN) 1 23:25 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:35 Effective 2024-11-14 through 2024-11-18
三 17:50 San Diego (SAN) 1 23:25 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:35 Operates only on 2024-11-27
一 17:50 San Diego (SAN) 1 23:35 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:45 Operates only on 2025-04-14
日 17:51 San Diego (SAN) 1 23:29 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-02-16
日 17:51 San Diego (SAN) 1 23:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:45 Operates only on 2025-04-27
日 17:52 San Diego (SAN) 1 23:32 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2024-10-06
一 17:52 San Diego (SAN) 1 23:29 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2025-04-07
四 17:55 San Diego (SAN) 1 23:35 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2024-10-10
四 17:55 San Diego (SAN) 1 23:35 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2024-10-24
四 17:59 San Diego (SAN) 1 23:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Effective 2024-12-19 through 2024-12-26
四 17:59 San Diego (SAN) 1 23:44 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:45 Operates only on 2025-04-17
一 18:00 San Diego (SAN) 1 23:38 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2024-12-23
五 18:00 San Diego (SAN) 1 23:38 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-02-07
四 18:00 San Diego (SAN) 1 23:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2025-02-20
一 18:01 San Diego (SAN) 1 23:39 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-02-03
四,六 18:05 San Diego (SAN) 1 23:40 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:35 Effective 2024-11-23 through 2024-11-28
一,三 18:05 San Diego (SAN) 1 23:40 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:35 Effective 2024-12-09 through 2024-12-11
五 18:05 San Diego (SAN) 1 23:43 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2024-12-27
一 18:05 San Diego (SAN) 1 23:42 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2025-02-24
五 18:06 San Diego (SAN) 1 23:41 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:35 Operates only on 2024-11-29
日 18:06 San Diego (SAN) 1 23:41 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:35 Operates only on 2024-12-15
四 18:06 San Diego (SAN) 1 23:44 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-01-02
日 18:07 San Diego (SAN) 1 23:45 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-02-02
一,四 18:08 San Diego (SAN) 1 23:46 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Effective 2025-01-13 through 2025-01-16
一,四 18:08 San Diego (SAN) 1 23:46 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Effective 2025-01-23 through 2025-01-30
日 18:08 San Diego (SAN) 1 23:46 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-02-09
日 18:09 San Diego (SAN) 1 23:47 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-01-19
三 18:09 San Diego (SAN) 1 23:46 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2025-03-05
四 18:10 San Diego (SAN) 1 23:50 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2024-10-03
六 18:10 San Diego (SAN) 1 23:50 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2024-10-19
四 18:10 San Diego (SAN) 1 23:45 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:35 Operates only on 2024-11-21
日 18:10 San Diego (SAN) 1 23:47 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2025-03-23
四,日 18:10 San Diego (SAN) 1 23:55 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:45 Effective 2025-04-10 through 2025-04-13
四,日 18:10 San Diego (SAN) 1 23:55 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:45 Effective 2025-04-20 through 2025-04-24
一 18:13 San Diego (SAN) 1 23:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-02-10
日 18:14 San Diego (SAN) 1 23:52 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-01-12
日 18:14 San Diego (SAN) 1 23:52 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-01-26
五 18:14 San Diego (SAN) 1 23:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:45 Operates only on 2025-04-11
五 18:15 San Diego (SAN) 1 23:52 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2025-02-28
一 18:15 San Diego (SAN) 1 23:52 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2025-03-24
二 18:16 San Diego (SAN) 1 23:53 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 408 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2025-03-25
prev   1 2 3 4 5   next


San Diego (SAN)到Minneapolis/Saint Paul (MSP)全部航班
选择出发日期:
航班时刻表
直达航班

Operates only on 2024-10-20

-

-

-

-

-

-

Duration: 3:40, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-18

-

-

-

-


-

-
Duration: 3:45, non-stop
Boeing 737-800 (738)

Effective 2024-12-20 through 2024-12-25

-

-


-


-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Effective 2025-01-01 through 2025-01-05

-

-


-

-

-

Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-31

-

-

-


-

-

-
Duration: 3:40, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-03

-

-

-

-


-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-13

-

-

-


-

-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-03

-


-

-

-

-

-
Duration: 3:45, non-stop
Boeing 737-800 (738)

Effective 2024-11-04 through 2024-11-07


-

-


-

-

-
Duration: 3:35, non-stop
Boeing 737-800 (738)

Effective 2024-11-14 through 2024-11-18


-

-


-

-

-
Duration: 3:35, non-stop
Boeing 737-800 (738)

Operates only on 2024-11-27

-

-


-

-

-

-
Duration: 3:35, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-14


-

-

-

-

-

-
Duration: 3:45, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-16

-

-

-

-

-

-

Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-27

-

-

-

-

-

-

Duration: 3:45, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-06

-

-

-

-

-

-

Duration: 3:40, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-07


-

-

-

-

-

-
Duration: 3:37, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-10

-

-

-


-

-

-
Duration: 3:40, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-24

-

-

-


-

-

-
Duration: 3:40, non-stop
Boeing 737-800 (738)

Effective 2024-12-19 through 2024-12-26

-

-

-


-

-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-17

-

-

-


-

-

-
Duration: 3:45, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-23


-

-

-

-

-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-07

-

-

-

-


-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-20

-

-

-


-

-

-
Duration: 3:37, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-03


-

-

-

-

-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Effective 2024-11-23 through 2024-11-28

-

-

-


-


-
Duration: 3:35, non-stop
Boeing 737-800 (738)

Effective 2024-12-09 through 2024-12-11


-


-

-

-

-
Duration: 3:35, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-27

-

-

-

-


-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-24


-

-

-

-

-

-
Duration: 3:37, non-stop
Boeing 737-800 (738)

Operates only on 2024-11-29

-

-

-

-


-

-
Duration: 3:35, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-15

-

-

-

-

-

-

Duration: 3:35, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-02

-

-

-


-

-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-02

-

-

-

-

-

-

Duration: 3:38, non-stop
Boeing 737-800 (738)

Effective 2025-01-13 through 2025-01-16


-

-


-

-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Effective 2025-01-23 through 2025-01-30


-

-


-

-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-09

-

-

-

-

-

-

Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-19

-

-

-

-

-

-

Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-05

-

-


-

-

-

-
Duration: 3:37, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-03

-

-

-


-

-

-
Duration: 3:40, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-19

-

-

-

-

-


-
Duration: 3:40, non-stop
Boeing 737-800 (738)

Operates only on 2024-11-21

-

-

-


-

-

-
Duration: 3:35, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-23

-

-

-

-

-

-

Duration: 3:37, non-stop
Boeing 737-800 (738)

Effective 2025-04-10 through 2025-04-13

-

-

-


-

-

Duration: 3:45, non-stop
Boeing 737-800 (738)

Effective 2025-04-20 through 2025-04-24

-

-

-


-

-

Duration: 3:45, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-10


-

-

-

-

-

-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-12

-

-

-

-

-

-

Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-26

-

-

-

-

-

-

Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-04-11

-

-

-

-


-

-
Duration: 3:45, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-28

-

-

-

-


-

-
Duration: 3:37, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-24


-

-

-

-

-

-
Duration: 3:37, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-25

-


-

-

-

-

-
Duration: 3:37, non-stop
Boeing 737-800 (738)
prev        Page 2 / 5        next
  • 国内航线 从 San Diego (SAN)机场出发,到达 Minneapolis/Saint Paul (MSP)机场。
  • 航班飞行距离为 1529英里( 2461公里)。
  • 出发地的时区为 UTC-8 , 目的地的时区为 UTC-6 . 出发地的当前时间是 (loading...),目的地的当前时间是 (loading...)。 两地时差 (loading...)小时。
  • 直达航班的最短飞行时间为3:35 ,最长飞行时间为3:50。