Oakland (OAK)到Denver (DEN)全部航班

选择出发日期:
航班时刻表
直达航班
一-三 20:40 Oakland (OAK) 2 00:05 Denver (DEN)
Southwest Airlines WN 153 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-26 through 2024-12-02
此航班在起飞后隔一天抵达。
一,四,五,日 20:40 Oakland (OAK) 2 00:05 Denver (DEN)
Southwest Airlines WN 153 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-20 through 2025-01-02
此航班在起飞后隔一天抵达。
日 20:40 Oakland (OAK) 2 00:05 Denver (DEN)
Southwest Airlines WN 153 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2025-01-05
此航班在起飞后隔一天抵达。
四,五,日 05:00 Oakland (OAK) 2 08:30 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-11-03 through 2024-11-10
一,四,五,日 05:00 Oakland (OAK) 2 08:30 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-11-11 through 2024-11-25
六 05:00 Oakland (OAK) 2 08:30 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-11-23 through 2024-11-30
五,日 05:00 Oakland (OAK) 2 08:30 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-12-08 through 2024-12-15
四 05:00 Oakland (OAK) 2 08:30 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2024-12-19
六 05:00 Oakland (OAK) 2 08:30 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-12-21 through 2025-01-04
五 05:00 Oakland (OAK) 2 08:30 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2025-01-03
一-四 05:05 Oakland (OAK) 2 08:35 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-11-26 through 2024-12-02
一,四,五,日 05:05 Oakland (OAK) 2 08:35 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-12-20 through 2025-01-02
日 05:05 Oakland (OAK) 2 08:35 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Operates only on 2025-01-05
四,五,日 05:05 Oakland (OAK) 2 08:35 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-01-12 through 2025-01-17
一,日 05:05 Oakland (OAK) 2 08:35 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-01-20 through 2025-01-26
四,五,日 05:05 Oakland (OAK) 2 08:35 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-02 through 2025-02-07
一 05:05 Oakland (OAK) 2 08:35 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2025-02-10
一,二,四 05:05 Oakland (OAK) 2 08:35 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-18 through 2025-02-24
一 05:05 Oakland (OAK) 2 08:35 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2025-03-03
一,四,五,日 05:20 Oakland (OAK) 2 08:50 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-13 through 2025-02-17
四,五,日 05:20 Oakland (OAK) 2 08:50 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-21 through 2025-03-02
日 05:25 Oakland (OAK) 2 08:55 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Operates only on 2024-12-01
六 05:30 Oakland (OAK) 2 09:00 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-11-09 through 2024-11-16
六 05:30 Oakland (OAK) 2 09:00 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-12-07 through 2024-12-14
六 06:05 Oakland (OAK) 2 09:35 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-800 (73H) 2:30 Effective 2025-01-11 through 2025-02-08
一,三 07:10 Oakland (OAK) 2 10:40 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-11-04 through 2024-11-06
二,三 07:10 Oakland (OAK) 2 10:40 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-11-12 through 2024-11-20
二-五 07:10 Oakland (OAK) 2 10:40 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-11-29 through 2024-12-06
一-四 07:10 Oakland (OAK) 2 10:40 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-12-09 through 2024-12-18
二,三 07:10 Oakland (OAK) 2 10:40 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-12-24 through 2025-01-01
一 07:10 Oakland (OAK) 2 10:40 Denver (DEN)
Southwest Airlines WN 157 Non-stop Boeing 737-700 (73W) 2:30 Operates only on 2025-01-06
一,四,五,日 19:40 Oakland (OAK) 2 23:10 Denver (DEN)
Southwest Airlines WN 184 Non-stop Boeing 737-700 (73W) 2:30 Effective 2025-02-13 through 2025-02-17
四,五,日 19:40 Oakland (OAK) 2 23:10 Denver (DEN)
Southwest Airlines WN 184 Non-stop Boeing 737-700 (73W) 2:30 Effective 2025-02-21 through 2025-03-02
一-三 11:40 Oakland (OAK) 2 15:05 Denver (DEN)
Southwest Airlines WN 294 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-11-26 through 2024-12-02
一,四,五,日 11:40 Oakland (OAK) 2 15:05 Denver (DEN)
Southwest Airlines WN 294 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-12-20 through 2025-01-02
日 11:40 Oakland (OAK) 2 15:05 Denver (DEN)
Southwest Airlines WN 294 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2025-01-05
日 20:25 Oakland (OAK) 2 23:50 Denver (DEN)
Southwest Airlines WN 384 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2024-12-01
一,四,五 05:10 Oakland (OAK) 2 08:45 Denver (DEN)
Southwest Airlines WN 427 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-10-03 through 2024-10-28
五 05:10 Oakland (OAK) 2 08:45 Denver (DEN)
Southwest Airlines WN 427 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2024-11-01
日 05:20 Oakland (OAK) 2 08:55 Denver (DEN)
Southwest Airlines WN 427 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-10-06 through 2024-10-27
四 05:35 Oakland (OAK) 2 09:10 Denver (DEN)
Southwest Airlines WN 427 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2024-10-31
二,三 06:30 Oakland (OAK) 2 10:05 Denver (DEN)
Southwest Airlines WN 427 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-10-08 through 2024-10-30
日 11:45 Oakland (OAK) 2 15:10 Denver (DEN)
Southwest Airlines WN 497 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-09-08 through 2024-09-29
六 08:25 Oakland (OAK) 2 11:50 Denver (DEN)
Southwest Airlines WN 509 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-11-23 through 2024-11-30
六 08:25 Oakland (OAK) 2 11:50 Denver (DEN)
Southwest Airlines WN 509 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-12-21 through 2025-01-04
六 19:05 Oakland (OAK) 2 22:40 Denver (DEN)
Southwest Airlines WN 519 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-10-05 through 2024-11-02
四 15:50 Oakland (OAK) 2 19:15 Denver (DEN)
Southwest Airlines WN 650 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2024-10-31
四 12:30 Oakland (OAK) 2 15:55 Denver (DEN)
Southwest Airlines WN 711 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2024-10-31
一-五 05:35 Oakland (OAK) 2 09:00 Denver (DEN)
Southwest Airlines WN 716 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-01-07 through 2025-01-15
二-五,日 05:35 Oakland (OAK) 2 09:00 Denver (DEN)
Southwest Airlines WN 716 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-01-19 through 2025-01-24
1 2 3 4 ... 6 7 8   next


Oakland (OAK)到Denver (DEN)全部航班
选择出发日期:
航班时刻表
直达航班

20:40

00:05(+1)
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)
此航班在起飞后隔一天抵达。

20:40

00:05(+1)
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)
此航班在起飞后隔一天抵达。

20:40

00:05(+1)
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)
此航班在起飞后隔一天抵达。

05:00

08:30
Effective 2024-11-03 through 2024-11-10

-

-

-



-

Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:00

08:30
Effective 2024-11-11 through 2024-11-25


-

-



-

Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:00

08:30
Effective 2024-11-23 through 2024-11-30

-

-

-

-

-


-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

05:00

08:30
Effective 2024-12-08 through 2024-12-15

-

-

-

-


-

Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:00

08:30
Operates only on 2024-12-19

-

-

-


-

-

-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:00

08:30
Effective 2024-12-21 through 2025-01-04

-

-

-

-

-


-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

05:00

08:30
Operates only on 2025-01-03

-

-

-

-


-

-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:05

08:35
Effective 2024-11-26 through 2024-12-02





-

-

-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

05:05

08:35
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 2:30, non-stop
Boeing 737-700 (73W)

05:05

08:35
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 2:30, non-stop
Boeing 737-700 (73W)

05:05

08:35
Effective 2025-01-12 through 2025-01-17

-

-

-



-

Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:05

08:35
Effective 2025-01-20 through 2025-01-26


-

-

-

-

-

Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:05

08:35
Effective 2025-02-02 through 2025-02-07

-

-

-



-

Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:05

08:35
Operates only on 2025-02-10


-

-

-

-

-

-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:05

08:35
Effective 2025-02-18 through 2025-02-24



-


-

-

-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:05

08:35
Operates only on 2025-03-03


-

-

-

-

-

-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:20

08:50
Effective 2025-02-13 through 2025-02-17


-

-



-

Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:20

08:50
Effective 2025-02-21 through 2025-03-02

-

-

-



-

Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:25

08:55
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 2:30, non-stop
Boeing 737-700 (73W)

05:30

09:00
Effective 2024-11-09 through 2024-11-16

-

-

-

-

-


-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

05:30

09:00
Effective 2024-12-07 through 2024-12-14

-

-

-

-

-


-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

06:05

09:35
Effective 2025-01-11 through 2025-02-08

-

-

-

-

-


-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

07:10

10:40
Effective 2024-11-04 through 2024-11-06


-


-

-

-

-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

07:10

10:40
Effective 2024-11-12 through 2024-11-20

-



-

-

-

-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

07:10

10:40
Effective 2024-11-29 through 2024-12-06

-





-

-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

07:10

10:40
Effective 2024-12-09 through 2024-12-18





-

-

-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

07:10

10:40
Effective 2024-12-24 through 2025-01-01

-



-

-

-

-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

07:10

10:40
Operates only on 2025-01-06


-

-

-

-

-

-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

19:40

23:10
Effective 2025-02-13 through 2025-02-17


-

-



-

Duration: 2:30, non-stop
Boeing 737-700 (73W)

19:40

23:10
Effective 2025-02-21 through 2025-03-02

-

-

-



-

Duration: 2:30, non-stop
Boeing 737-700 (73W)

11:40

15:05
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

11:40

15:05
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 2:25, non-stop
Boeing 737-700 (73W)

11:40

15:05
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 2:25, non-stop
Boeing 737-700 (73W)

20:25

23:50
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

05:10

08:45
Effective 2024-10-03 through 2024-10-28


-

-



-

-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

05:10

08:45
Operates only on 2024-11-01

-

-

-

-


-

-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

05:20

08:55
Effective 2024-10-06 through 2024-10-27

-

-

-

-

-

-

Duration: 2:35, non-stop
Boeing 737-800 (73H)

05:35

09:10
Operates only on 2024-10-31

-

-

-


-

-

-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

06:30

10:05
Effective 2024-10-08 through 2024-10-30

-



-

-

-

-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

11:45

15:10
Effective 2024-09-08 through 2024-09-29

-

-

-

-

-

-

Duration: 2:25, non-stop
Boeing 737-700 (73W)

08:25

11:50
Effective 2024-11-23 through 2024-11-30

-

-

-

-

-


-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

08:25

11:50
Effective 2024-12-21 through 2025-01-04

-

-

-

-

-


-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

19:05

22:40
Effective 2024-10-05 through 2024-11-02

-

-

-

-

-


-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

15:50

19:15
Operates only on 2024-10-31

-

-

-


-

-

-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

12:30

15:55
Operates only on 2024-10-31

-

-

-


-

-

-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

05:35

09:00
Effective 2025-01-07 through 2025-01-15






-

-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

05:35

09:00
Effective 2025-01-19 through 2025-01-24

-





-

Duration: 2:25, non-stop
Boeing 737-700 (73W)
Page 1 / 8        next
  • 国内航线 从 Oakland (OAK)机场出发,到达 Denver (DEN)机场。
  • 航班飞行距离为 954英里( 1536公里)。
  • 出发地的时区为 UTC-8 , 目的地的时区为 UTC-7 . 出发地的当前时间是 (loading...),目的地的当前时间是 (loading...)。 两地时差 (loading...)小时。
  • 直达航班的最短飞行时间为2:25 ,最长飞行时间为2:35。