Southwest Airlines 航班 WN 199: 复合航线

选择出发日期:
航班时刻表
直达航班
四,五,日 05:40 Houston Hobby (HOU) 07:00 Las Vegas Harry Reid (LAS) 1
WN 199 Non-stop Boeing 737-700 (73W) 3:20 Effective 2024-11-03 through 2024-11-10
一,四,五,日 05:40 Houston Hobby (HOU) 07:00 Las Vegas Harry Reid (LAS) 1
WN 199 Non-stop Boeing 737-700 (73W) 3:20 Effective 2024-11-11 through 2024-11-25
四 05:40 Sarasota/Bradenton (SRQ) 07:10 Houston Hobby (HOU)
WN 199 Non-stop Boeing 737-800 (73H) 2:30 Operates only on 2024-11-28
五,日 05:40 Houston Hobby (HOU) 07:00 Las Vegas Harry Reid (LAS) 1
WN 199 Non-stop Boeing 737-700 (73W) 3:20 Effective 2024-12-08 through 2024-12-15
四 05:40 Houston Hobby (HOU) 07:00 Las Vegas Harry Reid (LAS) 1
WN 199 Non-stop Boeing 737-700 (73W) 3:20 Operates only on 2024-12-19
五 05:40 Houston Hobby (HOU) 07:00 Las Vegas Harry Reid (LAS) 1
WN 199 Non-stop Boeing 737-700 (73W) 3:20 Operates only on 2025-01-03
六 05:50 Phoenix Sky Harbor (PHX) 4 09:10 Houston Hobby (HOU)
WN 199 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-23 through 2024-11-30
六 05:50 Phoenix Sky Harbor (PHX) 4 09:10 Houston Hobby (HOU)
WN 199 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-21 through 2025-01-04
日 06:30 El Paso (ELP) 09:15 Houston Hobby (HOU)
WN 199 Non-stop Boeing 737-700 (73W) 1:45 Operates only on 2024-12-01
六 07:00 Memphis (MEM) 10:00 Orlando (MCO)
WN 199 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-11-09 through 2024-11-16
六 07:00 Memphis (MEM) 10:00 Orlando (MCO)
WN 199 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-12-07 through 2024-12-14
六 07:00 Memphis (MEM) 10:00 Orlando (MCO)
WN 199 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-02-15 through 2025-03-01
日 07:25 Baltimore (BWI) 08:25 Midway, Chicago (MDW)
WN 199 Non-stop Boeing 737-800 (73H) 2:00 Operates only on 2024-09-01
四,五,日 07:35 Las Vegas Harry Reid (LAS) 1 09:10 Oakland (OAK) 2
WN 199 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-03 through 2024-11-10
一,四,五,日 07:35 Las Vegas Harry Reid (LAS) 1 09:10 Oakland (OAK) 2
WN 199 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-11 through 2024-11-25
五,日 07:35 Las Vegas Harry Reid (LAS) 1 09:10 Oakland (OAK) 2
WN 199 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-12-08 through 2024-12-15
四 07:35 Las Vegas Harry Reid (LAS) 1 09:10 Oakland (OAK) 2
WN 199 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2024-12-19
五 07:35 Las Vegas Harry Reid (LAS) 1 09:10 Oakland (OAK) 2
WN 199 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2025-01-03
四 08:00 Las Vegas Harry Reid (LAS) 1 09:15 San Diego (SAN) 1
WN 199 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2024-10-31
六 08:05 Memphis (MEM) 11:05 Orlando (MCO)
WN 199 Non-stop Boeing 737-700 (73W) 2:00 Effective 2025-01-11 through 2025-02-08
一-三 08:45 Orlando (MCO) 10:55 Denver (DEN)
WN 199 Non-stop Boeing 737-700 (73W) 4:10 Effective 2024-11-26 through 2024-12-02
一,四,五,日 08:45 Orlando (MCO) 10:55 Denver (DEN)
WN 199 Non-stop Boeing 737-700 (73W) 4:10 Effective 2024-12-20 through 2025-01-02
日 08:45 Orlando (MCO) 10:55 Denver (DEN)
WN 199 Non-stop Boeing 737-700 (73W) 4:10 Operates only on 2025-01-05
日 09:10 Baltimore (BWI) 10:15 Midway, Chicago (MDW)
WN 199 Non-stop Boeing 737-700 (73W) 2:05 Effective 2024-09-08 through 2024-09-29
六 09:15 Atlanta (ATL) N 10:40 San Antonio (SAT) A
WN 199 Non-stop Boeing 737-700 (73W) 2:25 Valid until 2024-09-28
四,五,日 09:15 Austin (AUS) 10:35 Denver (DEN)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-01-12 through 2025-01-17
一,日 09:15 Austin (AUS) 10:35 Denver (DEN)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-01-20 through 2025-01-26
四,五,日 09:15 Austin (AUS) 10:35 Denver (DEN)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-02-02 through 2025-02-07
一 09:15 Austin (AUS) 10:35 Denver (DEN)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2025-02-10
一,二,四 09:15 Austin (AUS) 10:35 Denver (DEN)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-02-18 through 2025-02-24
一 09:15 Austin (AUS) 10:35 Denver (DEN)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2025-03-03
四 10:00 San Diego (SAN) 1 13:20 Denver (DEN)
WN 199 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-10-31
日 10:00 Houston Hobby (HOU) 11:15 Jackson (JAN)
WN 199 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2024-12-01
一,四,五 10:45 Atlanta (ATL) N 12:05 Austin (AUS)
WN 199 Non-stop Boeing 737-700 (73W) 2:20 Valid until 2024-09-30
一-三 11:05 Denver (DEN) 13:05 Phoenix Sky Harbor (PHX) 4
WN 199 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-11-04 through 2024-11-06
二,三 11:05 Denver (DEN) 13:05 Phoenix Sky Harbor (PHX) 4
WN 199 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-11-12 through 2024-11-20
二-五 11:05 Denver (DEN) 13:05 Phoenix Sky Harbor (PHX) 4
WN 199 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-11-29 through 2024-12-06
一-四 11:05 Denver (DEN) 13:05 Phoenix Sky Harbor (PHX) 4
WN 199 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-12-09 through 2024-12-18
二,三 11:05 Denver (DEN) 13:05 Phoenix Sky Harbor (PHX) 4
WN 199 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-12-24 through 2025-01-01
一 11:05 Denver (DEN) 13:05 Phoenix Sky Harbor (PHX) 4
WN 199 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2025-01-06
一-五 11:05 Denver (DEN) 14:35 New Orleans (MSY)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-01-07 through 2025-01-15
二-五,日 11:05 Denver (DEN) 14:35 New Orleans (MSY)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-01-19 through 2025-01-24
一-五 11:05 Denver (DEN) 14:35 New Orleans (MSY)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-01-27 through 2025-02-05
二,三,日 11:05 Denver (DEN) 14:35 New Orleans (MSY)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-09 through 2025-02-12
二,三 11:05 Denver (DEN) 14:35 New Orleans (MSY)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-19 through 2025-03-05
六 11:15 San Antonio (SAT) A 12:25 Love Field, Dallas (DAL) 1
WN 199 Non-stop Boeing 737-700 (73W) 1:10 Valid until 2024-09-28
一-三 11:35 Denver (DEN) 13:05 Fresno (FAT)
WN 199 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-11-26 through 2024-12-02
一,四,五,日 11:35 Denver (DEN) 13:05 Fresno (FAT)
WN 199 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-12-20 through 2025-01-02
日 11:35 Denver (DEN) 13:05 Fresno (FAT)
WN 199 Non-stop Boeing 737-700 (73W) 2:30 Operates only on 2025-01-05
日 11:50 Jackson (JAN) 14:40 Orlando (MCO)
WN 199 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2024-12-01
一,四,五 12:30 Destin/Fort Walton Beach (VPS) 15:40 Baltimore (BWI)
WN 199 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-10-03 through 2024-10-28
五 12:30 Destin/Fort Walton Beach (VPS) 15:40 Baltimore (BWI)
WN 199 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2024-11-01
六 13:05 Love Field, Dallas (DAL) 1 14:10 Tulsa (TUL)
WN 199 Non-stop Boeing 737-700 (73W) 1:05 Valid until 2024-09-28
二,三 13:30 Atlanta (ATL) N 14:50 Austin (AUS)
WN 199 Non-stop Boeing 737-700 (73W) 2:20 Valid until 2024-10-02
一-三 13:40 Fresno (FAT) 14:55 Las Vegas Harry Reid (LAS) 1
WN 199 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-11-26 through 2024-12-02
一,四,五,日 13:40 Fresno (FAT) 14:55 Las Vegas Harry Reid (LAS) 1
WN 199 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-12-20 through 2025-01-02
日 13:40 Fresno (FAT) 14:55 Las Vegas Harry Reid (LAS) 1
WN 199 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2025-01-05
六 14:45 Tulsa (TUL) 15:30 Denver (DEN)
WN 199 Non-stop Boeing 737-700 (73W) 1:45 Valid until 2024-09-28
一-三 15:35 Las Vegas Harry Reid (LAS) 1 18:15 El Paso (ELP)
WN 199 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-11-26 through 2024-12-02
一,四,五,日 15:35 Las Vegas Harry Reid (LAS) 1 18:15 El Paso (ELP)
WN 199 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-12-20 through 2025-01-02
日 15:35 Las Vegas Harry Reid (LAS) 1 18:15 El Paso (ELP)
WN 199 Non-stop Boeing 737-700 (73W) 1:40 Operates only on 2025-01-05
日 15:40 Orlando (MCO) 19:25 Luis Munoz Marin, San Juan (SJU) B
WN 199 Non-stop Boeing 737-700 (73W) 2:45 Operates only on 2024-12-01
一,四,五,日 15:40 Denver (DEN) 19:55 Indianapolis (IND)
WN 199 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-02-13 through 2025-02-17
四,五,日 15:40 Denver (DEN) 19:55 Indianapolis (IND)
WN 199 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-02-21 through 2025-03-02
六 15:45 Baltimore (BWI) 17:00 Albany (ALB)
WN 199 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2024-11-02
二,三 15:50 Indianapolis (IND) 17:25 Baltimore (BWI)
WN 199 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-10-08 through 2024-10-30
六 16:10 Baltimore (BWI) 17:30 Albany (ALB)
WN 199 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-05 through 2024-10-26
一,四,五 16:20 Baltimore (BWI) 17:40 Albany (ALB)
WN 199 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-10-03 through 2024-10-28
五 16:20 Baltimore (BWI) 17:40 Albany (ALB)
WN 199 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-11-01
日 17:35 Midway, Chicago (MDW) 21:10 Tampa (TPA)
WN 199 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-10-06 through 2024-10-27
转机航班
四,五,日 05:40 Houston Hobby (HOU) 09:10 Oakland (OAK) 2
WN 199 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-11-03 through 2024-11-10
一,四,五,日 05:40 Houston Hobby (HOU) 09:10 Oakland (OAK) 2
WN 199 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-11-11 through 2024-11-25
五,日 05:40 Houston Hobby (HOU) 09:10 Oakland (OAK) 2
WN 199 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-12-08 through 2024-12-15
四 05:40 Houston Hobby (HOU) 09:10 Oakland (OAK) 2
WN 199 1-stop Boeing 737-700 (73W) 5:30 Operates only on 2024-12-19
五 05:40 Houston Hobby (HOU) 09:10 Oakland (OAK) 2
WN 199 1-stop Boeing 737-700 (73W) 5:30 Operates only on 2025-01-03
日 06:30 El Paso (ELP) 11:15 Jackson (JAN)
WN 199 1-stop Boeing 737-700 (73W) 3:45 Operates only on 2024-12-01
四 08:00 Las Vegas Harry Reid (LAS) 1 13:20 Denver (DEN)
WN 199 1-stop Boeing 737-700 (73W) 4:20 Operates only on 2024-10-31
一-三 08:45 Orlando (MCO) 13:05 Fresno (FAT)
WN 199 1-stop Boeing 737-700 (73W) 7:20 Effective 2024-11-26 through 2024-12-02
一,四,五,日 08:45 Orlando (MCO) 13:05 Fresno (FAT)
WN 199 1-stop Boeing 737-700 (73W) 7:20 Effective 2024-12-20 through 2025-01-02
日 08:45 Orlando (MCO) 13:05 Fresno (FAT)
WN 199 1-stop Boeing 737-700 (73W) 7:20 Operates only on 2025-01-05
六 09:15 Atlanta (ATL) N 12:25 Love Field, Dallas (DAL) 1
WN 199 1-stop Boeing 737-700 (73W) 4:10 Valid until 2024-09-28
日 10:00 Houston Hobby (HOU) 14:40 Orlando (MCO)
WN 199 1-stop Boeing 737-700 (73W) 3:40 Operates only on 2024-12-01
六 11:15 San Antonio (SAT) A 14:10 Tulsa (TUL)
WN 199 1-stop Boeing 737-700 (73W) 2:55 Valid until 2024-09-28
一-三 11:35 Denver (DEN) 14:55 Las Vegas Harry Reid (LAS) 1
WN 199 1-stop Boeing 737-700 (73W) 4:20 Effective 2024-11-26 through 2024-12-02
一,四,五,日 11:35 Denver (DEN) 14:55 Las Vegas Harry Reid (LAS) 1
WN 199 1-stop Boeing 737-700 (73W) 4:20 Effective 2024-12-20 through 2025-01-02
日 11:35 Denver (DEN) 14:55 Las Vegas Harry Reid (LAS) 1
WN 199 1-stop Boeing 737-700 (73W) 4:20 Operates only on 2025-01-05
日 11:50 Jackson (JAN) 19:25 Luis Munoz Marin, San Juan (SJU) B
WN 199 1-stop Boeing 737-700 (73W) 5:35 Operates only on 2024-12-01
一,四,五 12:30 Destin/Fort Walton Beach (VPS) 17:40 Albany (ALB)
WN 199 1-stop Boeing 737-700 (73W) 4:10 Effective 2024-10-03 through 2024-10-28
五 12:30 Destin/Fort Walton Beach (VPS) 17:40 Albany (ALB)
WN 199 1-stop Boeing 737-700 (73W) 4:10 Operates only on 2024-11-01
六 13:05 Love Field, Dallas (DAL) 1 15:30 Denver (DEN)
WN 199 1-stop Boeing 737-700 (73W) 3:25 Valid until 2024-09-28
一-三 13:40 Fresno (FAT) 18:15 El Paso (ELP)
WN 199 1-stop Boeing 737-700 (73W) 3:35 Effective 2024-11-26 through 2024-12-02
一,四,五,日 13:40 Fresno (FAT) 18:15 El Paso (ELP)
WN 199 1-stop Boeing 737-700 (73W) 3:35 Effective 2024-12-20 through 2025-01-02
日 13:40 Fresno (FAT) 18:15 El Paso (ELP)
WN 199 1-stop Boeing 737-700 (73W) 3:35 Operates only on 2025-01-05
日 06:30 El Paso (ELP) 14:40 Orlando (MCO)
WN 199 2-stop Boeing 737-700 (73W) 6:10 Operates only on 2024-12-01
一-三 08:45 Orlando (MCO) 14:55 Las Vegas Harry Reid (LAS) 1
WN 199 2-stop Boeing 737-700 (73W) 9:10 Effective 2024-11-26 through 2024-12-02
一,四,五,日 08:45 Orlando (MCO) 14:55 Las Vegas Harry Reid (LAS) 1
WN 199 2-stop Boeing 737-700 (73W) 9:10 Effective 2024-12-20 through 2025-01-02
日 08:45 Orlando (MCO) 14:55 Las Vegas Harry Reid (LAS) 1
WN 199 2-stop Boeing 737-700 (73W) 9:10 Operates only on 2025-01-05
六 09:15 Atlanta (ATL) N 14:10 Tulsa (TUL)
WN 199 2-stop Boeing 737-700 (73W) 5:55 Valid until 2024-09-28
日 10:00 Houston Hobby (HOU) 19:25 Luis Munoz Marin, San Juan (SJU) B
WN 199 2-stop Boeing 737-700 (73W) 7:25 Operates only on 2024-12-01
六 11:15 San Antonio (SAT) A 15:30 Denver (DEN)
WN 199 2-stop Boeing 737-700 (73W) 5:15 Valid until 2024-09-28
一-三 11:35 Denver (DEN) 18:15 El Paso (ELP)
WN 199 2-stop Boeing 737-700 (73W) 6:40 Effective 2024-11-26 through 2024-12-02
一,四,五,日 11:35 Denver (DEN) 18:15 El Paso (ELP)
WN 199 2-stop Boeing 737-700 (73W) 6:40 Effective 2024-12-20 through 2025-01-02
日 11:35 Denver (DEN) 18:15 El Paso (ELP)
WN 199 2-stop Boeing 737-700 (73W) 6:40 Operates only on 2025-01-05
日 06:30 El Paso (ELP) 19:25 Luis Munoz Marin, San Juan (SJU) B
WN 199 3-stop Boeing 737-700 (73W) 9:55 Operates only on 2024-12-01
一-三 08:45 Orlando (MCO) 18:15 El Paso (ELP)
WN 199 3-stop Boeing 737-700 (73W) 11:30 Effective 2024-11-26 through 2024-12-02
一,四,五,日 08:45 Orlando (MCO) 18:15 El Paso (ELP)
WN 199 3-stop Boeing 737-700 (73W) 11:30 Effective 2024-12-20 through 2025-01-02
日 08:45 Orlando (MCO) 18:15 El Paso (ELP)
WN 199 3-stop Boeing 737-700 (73W) 11:30 Operates only on 2025-01-05
六 09:15 Atlanta (ATL) N 15:30 Denver (DEN)
WN 199 3-stop Boeing 737-700 (73W) 8:15 Valid until 2024-09-28
此航班代码的飞行航线如下:
Southwest Airlines 航班 WN 199: 复合航线
选择出发日期:
航班时刻表
直达航班

Southwest Airlines WN199
Effective 2024-11-03 through 2024-11-10

-

-

-



-

Duration: 3:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-11 through 2024-11-25


-

-



-

Duration: 3:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-11-28

-

-

-


-

-

-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN199
Effective 2024-12-08 through 2024-12-15

-

-

-

-


-

Duration: 3:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-19

-

-

-


-

-

-
Duration: 3:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-03

-

-

-

-


-

-
Duration: 3:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-23 through 2024-11-30

-

-

-

-

-


-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN199
Effective 2024-12-21 through 2025-01-04

-

-

-

-

-


-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN199
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-09 through 2024-11-16

-

-

-

-

-


-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN199
Effective 2024-12-07 through 2024-12-14

-

-

-

-

-


-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN199
Effective 2025-02-15 through 2025-03-01

-

-

-

-

-


-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN199
Operates only on 2024-09-01

-

-

-

-

-

-

Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN199
Effective 2024-11-03 through 2024-11-10

-

-

-



-

Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-11 through 2024-11-25


-

-



-

Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-08 through 2024-12-15

-

-

-

-


-

Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-19

-

-

-


-

-

-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-03

-

-

-

-


-

-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-10-31

-

-

-


-

-

-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2025-01-11 through 2025-02-08

-

-

-

-

-


-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 4:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 4:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 4:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-09-08 through 2024-09-29

-

-

-

-

-

-

Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2025-01-12 through 2025-01-17

-

-

-



-

Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Effective 2025-01-20 through 2025-01-26


-

-

-

-

-

Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Effective 2025-02-02 through 2025-02-07

-

-

-



-

Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Operates only on 2025-02-10


-

-

-

-

-

-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Effective 2025-02-18 through 2025-02-24



-


-

-

-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Operates only on 2025-03-03


-

-

-

-

-

-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Operates only on 2024-10-31

-

-

-


-

-

-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
10:45

12:05
Valid until 2024-09-30


-

-



-

-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-04 through 2024-11-06




-

-

-

-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-12 through 2024-11-20

-



-

-

-

-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-29 through 2024-12-06

-





-

-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-09 through 2024-12-18





-

-

-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-24 through 2025-01-01

-



-

-

-

-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-06


-

-

-

-

-

-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2025-01-07 through 2025-01-15






-

-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Effective 2025-01-19 through 2025-01-24

-





-

Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Effective 2025-01-27 through 2025-02-05






-

-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Effective 2025-02-09 through 2025-02-12

-



-

-

-

Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Effective 2025-02-19 through 2025-03-05

-



-

-

-

-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-10-03 through 2024-10-28


-

-



-

-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-11-01

-

-

-

-


-

-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
13:30

14:50
Valid until 2024-10-02

-



-

-

-

-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2025-02-13 through 2025-02-17


-

-



-

Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN199
Effective 2025-02-21 through 2025-03-02

-

-

-



-

Duration: 2:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN199
Operates only on 2024-11-02

-

-

-

-

-


-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-10-08 through 2024-10-30

-



-

-

-

-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN199
Effective 2024-10-05 through 2024-10-26

-

-

-

-

-


-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN199
Effective 2024-10-03 through 2024-10-28


-

-



-

-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-11-01

-

-

-

-


-

-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-10-06 through 2024-10-27

-

-

-

-

-

-

Duration: 2:35, non-stop
Boeing 737-800 (73H)

转机航班

Southwest Airlines WN199
Effective 2024-11-03 through 2024-11-10

-

-

-



-

Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-11 through 2024-11-25


-

-



-

Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-08 through 2024-12-15

-

-

-

-


-

Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-19

-

-

-


-

-

-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-03

-

-

-

-


-

-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 3:45, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-10-31

-

-

-


-

-

-
Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 7:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 7:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 7:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 3:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 2:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 4:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 5:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-10-03 through 2024-10-28


-

-



-

-
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-11-01

-

-

-

-


-

-
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 3:25, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 3:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 3:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 3:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 6:10, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 9:10, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 9:10, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 9:10, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
09:15

14:10
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 5:55, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 7:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 5:15, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 6:40, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 6:40, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 6:40, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 9:55, 3-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 11:30, 3-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 11:30, 3-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 11:30, 3-stop
Boeing 737-700 (73W)

Southwest Airlines WN199
09:15

15:30
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 8:15, 3-stop
Boeing 737-700 (73W)
此航班代码的飞行航线如下:
  • Atlanta (ATL) - Austin (AUS)
  • Atlanta (ATL) - Denver (DEN)
  • Atlanta (ATL) - Love Field, Dallas (DAL)
  • Atlanta (ATL) - San Antonio (SAT)
  • Atlanta (ATL) - Tulsa (TUL)
  • Austin (AUS) - Denver (DEN)
  • Baltimore (BWI) - Albany (ALB)
  • Baltimore (BWI) - Midway, Chicago (MDW)
  • Denver (DEN) - El Paso (ELP)
  • Denver (DEN) - Fresno (FAT)
  • Denver (DEN) - Indianapolis (IND)
  • Denver (DEN) - New Orleans (MSY)
  • Denver (DEN) - Phoenix Sky Harbor (PHX)
  • Destin/Fort Walton Beach (VPS) - Albany (ALB)
  • Destin/Fort Walton Beach (VPS) - Baltimore (BWI)
  • El Paso (ELP) - Houston Hobby (HOU)
  • El Paso (ELP) - Jackson (JAN)
  • El Paso (ELP) - Luis Munoz Marin, San Juan (SJU)
  • El Paso (ELP) - Orlando (MCO)
  • Fresno (FAT) - El Paso (ELP)
  • Fresno (FAT) - Las Vegas Harry Reid (LAS)
  • Houston Hobby (HOU) - Jackson (JAN)
  • Houston Hobby (HOU) - Las Vegas Harry Reid (LAS)
  • Houston Hobby (HOU) - Luis Munoz Marin, San Juan (SJU)
  • Houston Hobby (HOU) - Oakland (OAK)
  • Houston Hobby (HOU) - Orlando (MCO)
  • Indianapolis (IND) - Baltimore (BWI)
  • Jackson (JAN) - Luis Munoz Marin, San Juan (SJU)
  • Jackson (JAN) - Orlando (MCO)
  • Las Vegas Harry Reid (LAS) - Denver (DEN)
  • Las Vegas Harry Reid (LAS) - El Paso (ELP)
  • Las Vegas Harry Reid (LAS) - Oakland (OAK)
  • Las Vegas Harry Reid (LAS) - San Diego (SAN)
  • Love Field, Dallas (DAL) - Denver (DEN)
  • Love Field, Dallas (DAL) - Tulsa (TUL)
  • Memphis (MEM) - Orlando (MCO)
  • Midway, Chicago (MDW) - Tampa (TPA)
  • Orlando (MCO) - Denver (DEN)
  • Orlando (MCO) - Fresno (FAT)
  • Orlando (MCO) - Las Vegas Harry Reid (LAS)
  • Orlando (MCO) - Luis Munoz Marin, San Juan (SJU)
  • Phoenix Sky Harbor (PHX) - Houston Hobby (HOU)
  • San Antonio (SAT) - Denver (DEN)
  • San Antonio (SAT) - Love Field, Dallas (DAL)
  • San Antonio (SAT) - Tulsa (TUL)
  • San Diego (SAN) - Denver (DEN)
  • Sarasota/Bradenton (SRQ) - Houston Hobby (HOU)
  • Tulsa (TUL) - Denver (DEN)