EgyptAir 航班 MS 24: 复合航线

选择出发日期:
航班时刻表
直达航班
六 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Airbus A320neo (32N) 1:00 Operates only on 2024-09-07
六 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-14 through 2024-10-26
一 10:15 Cairo (CAI) 3 11:15 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective 2025-03-31 through 2025-04-21
一 10:45 Cairo (CAI) 3 11:45 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-02
一 11:15 Cairo (CAI) 3 12:15 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-09 through 2024-10-21
二,三,六 11:15 Cairo (CAI) 3 12:15 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective 2025-04-01 through 2025-04-23
四 11:15 Cairo (CAI) 3 12:15 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Airbus A320neo (32N) 1:00 Effective 2025-04-03 through 2025-04-24
一 11:15 Cairo (CAI) 3 12:15 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective from 2025-04-28
三 12:15 Cairo (CAI) 3 13:15 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Valid until 2024-09-11
二,三 12:15 Cairo (CAI) 3 13:15 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-17 through 2024-09-25
二,三 12:15 Cairo (CAI) 3 13:15 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-10-02 through 2024-10-23
二,三,六 12:15 Cairo (CAI) 3 13:15 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective from 2025-04-26
四 12:15 Cairo (CAI) 3 13:15 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Airbus A320neo (32N) 1:00 Effective from 2025-05-01
二 13:00 Cairo (CAI) 3 14:00 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-10
二 13:00 Cairo (CAI) 3 14:00 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-10-01
日 13:00 Cairo (CAI) 3 14:00 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective 2025-03-30 through 2025-04-20
二 13:30 Cairo (CAI) 3 14:30 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-03
五 13:30 Cairo (CAI) 3 14:30 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective 2025-04-04 through 2025-04-18
每日 13:45 Cairo (CAI) 3 14:50 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-11-01 through 2025-03-29
日 14:00 Cairo (CAI) 3 15:00 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective from 2025-04-27
五 14:30 Cairo (CAI) 3 15:30 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Effective from 2025-04-25
四 14:40 Cairo (CAI) 3 15:40 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Airbus A320neo (32N) 1:00 Operates only on 2024-09-05
四 14:40 Cairo (CAI) 3 15:40 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-12
四 14:40 Cairo (CAI) 3 15:40 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-09-19 through 2024-09-26
四 14:40 Cairo (CAI) 3 15:40 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-10-03
四 14:40 Cairo (CAI) 3 15:40 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-10-10 through 2024-10-24
二-四,日 14:45 Cairo (CAI) 3 15:50 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-10-27 through 2024-10-31
每日 15:30 Sharm el-Sheikh (SSH) 2 16:10 Hurghada (HRG) 2
MS 24 Non-stop Boeing 737-800 (738) 0:40 Effective 2024-11-01 through 2025-03-29
五,日 15:35 Cairo (CAI) 3 16:35 Sharm el-Sheikh (SSH) 1
MS 24 Non-stop Boeing 737-800 (738) 1:00 Valid until 2024-10-25
二-四,日 16:30 Sharm el-Sheikh (SSH) 2 17:10 Hurghada (HRG) 2
MS 24 Non-stop Boeing 737-800 (738) 0:40 Effective 2024-10-27 through 2024-10-31
每日 16:50 Hurghada (HRG) 2 17:55 Cairo (CAI) 3
MS 24 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-11-01 through 2025-03-29
二-四,日 17:50 Hurghada (HRG) 2 18:55 Cairo (CAI) 3
MS 24 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-10-27 through 2024-10-31
转机航班
每日 13:45 Cairo (CAI) 3 16:10 Hurghada (HRG) 2
MS 24 1-stop Boeing 737-800 (738) 2:25 Effective 2024-11-01 through 2025-03-29
二-四,日 14:45 Cairo (CAI) 3 17:10 Hurghada (HRG) 2
MS 24 1-stop Boeing 737-800 (738) 2:25 Effective 2024-10-27 through 2024-10-31
每日 15:30 Sharm el-Sheikh (SSH) 2 17:55 Cairo (CAI) 3
MS 24 1-stop Boeing 737-800 (738) 2:25 Effective 2024-11-01 through 2025-03-29
二-四,日 16:30 Sharm el-Sheikh (SSH) 2 18:55 Cairo (CAI) 3
MS 24 1-stop Boeing 737-800 (738) 2:25 Effective 2024-10-27 through 2024-10-31
此航班代码的飞行航线如下:
EgyptAir 航班 MS 24: 复合航线
选择出发日期:
航班时刻表
直达航班

EgyptAir MS24
Operates only on 2024-09-07

-

-

-

-

-


-
Duration: 1:00, non-stop
Airbus A320neo (32N)

EgyptAir MS24
Effective 2024-09-14 through 2024-10-26

-

-

-

-

-


-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2025-03-31 through 2025-04-21


-

-

-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Operates only on 2024-09-02


-

-

-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2024-09-09 through 2024-10-21


-

-

-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2025-04-01 through 2025-04-23

-



-

-


-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2025-04-03 through 2025-04-24

-

-

-


-

-

-
Duration: 1:00, non-stop
Airbus A320neo (32N)

EgyptAir MS24
Effective from 2025-04-28


-

-

-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Valid until 2024-09-11

-

-


-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2024-09-17 through 2024-09-25

-



-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2024-10-02 through 2024-10-23

-



-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective from 2025-04-26

-



-

-


-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective from 2025-05-01

-

-

-


-

-

-
Duration: 1:00, non-stop
Airbus A320neo (32N)

EgyptAir MS24
Operates only on 2024-09-10

-


-

-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Operates only on 2024-10-01

-


-

-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2025-03-30 through 2025-04-20

-

-

-

-

-

-

Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Operates only on 2024-09-03

-


-

-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2025-04-04 through 2025-04-18

-

-

-

-


-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2024-11-01 through 2025-03-29







Duration: 1:05, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective from 2025-04-27

-

-

-

-

-

-

Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective from 2025-04-25

-

-

-

-


-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Operates only on 2024-09-05

-

-

-


-

-

-
Duration: 1:00, non-stop
Airbus A320neo (32N)

EgyptAir MS24
Operates only on 2024-09-12

-

-

-


-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2024-09-19 through 2024-09-26

-

-

-


-

-

-
Duration: 1:00, non-stop
Airbus A320neo (32N)

EgyptAir MS24
Operates only on 2024-10-03

-

-

-


-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2024-10-10 through 2024-10-24

-

-

-


-

-

-
Duration: 1:00, non-stop
Airbus A320neo (32N)

EgyptAir MS24
Effective 2024-10-27 through 2024-10-31

-




-

-

Duration: 1:05, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2024-11-01 through 2025-03-29







Duration: 0:40, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Valid until 2024-10-25

-

-

-

-


-

Duration: 1:00, non-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2024-10-27 through 2024-10-31

-




-

-

Duration: 0:40, non-stop
Boeing 737-800 (738)

EgyptAir MS24
16:50

17:55
Effective 2024-11-01 through 2025-03-29







Duration: 1:05, non-stop
Boeing 737-800 (738)

EgyptAir MS24
17:50

18:55
Effective 2024-10-27 through 2024-10-31

-




-

-

Duration: 1:05, non-stop
Boeing 737-800 (738)

转机航班

EgyptAir MS24
13:45

16:10
Effective 2024-11-01 through 2025-03-29







Duration: 2:25, 1-stop
Boeing 737-800 (738)

EgyptAir MS24
14:45

17:10
Effective 2024-10-27 through 2024-10-31

-




-

-

Duration: 2:25, 1-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2024-11-01 through 2025-03-29







Duration: 2:25, 1-stop
Boeing 737-800 (738)

EgyptAir MS24
Effective 2024-10-27 through 2024-10-31

-




-

-

Duration: 2:25, 1-stop
Boeing 737-800 (738)
此航班代码的飞行航线如下:
  • Cairo (CAI) - Hurghada (HRG)
  • Sharm el-Sheikh (SSH) - Cairo (CAI)
  • Sharm el-Sheikh (SSH) - Hurghada (HRG)