All airlines flying from Sarasota/Bradenton (SRQ) to Flint (FNT).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Tue 09:00 Sarasota/Bradenton (SRQ) 11:50 Flint (FNT)
Allegiant Air G4 1361 Non-stop Airbus A320 (320) 2:50 Effective 2025-11-04 through 2025-11-18
Sun 14:14 Sarasota/Bradenton (SRQ) 17:07 Flint (FNT)
Allegiant Air G4 1375 Non-stop Airbus A320 (320) 2:53 Operates only on 2025-08-17
Thu 14:14 Sarasota/Bradenton (SRQ) 17:07 Flint (FNT)
Allegiant Air G4 1386 Non-stop Airbus A320 (320) 2:53 Operates only on 2025-08-14
Sun 18:47 Sarasota/Bradenton (SRQ) 21:32 Flint (FNT)
Allegiant Air G4 1530 Non-stop Airbus A320 (320) 2:45 Effective 2025-07-06 through 2025-07-27
Thu 18:42 Sarasota/Bradenton (SRQ) 21:35 Flint (FNT)
Allegiant Air G4 1535 Non-stop Airbus A320 (320) 2:53 Effective 2025-05-22 through 2025-05-29
Sun 18:42 Sarasota/Bradenton (SRQ) 21:35 Flint (FNT)
Allegiant Air G4 1542 Non-stop Airbus A320 (320) 2:53 Effective 2025-05-25 through 2025-06-01
Thu 11:10 Sarasota/Bradenton (SRQ) 14:00 Flint (FNT)
Allegiant Air G4 1547 Non-stop Airbus A320 (320) 2:50 Effective 2025-06-05 through 2025-06-12
Sun 11:37 Sarasota/Bradenton (SRQ) 14:30 Flint (FNT)
Allegiant Air G4 1548 Non-stop Airbus A320 (320) 2:53 Operates only on 2025-05-18
Thu,Sun 10:47 Sarasota/Bradenton (SRQ) 13:36 Flint (FNT)
Allegiant Air G4 1550 Non-stop Airbus A320 (320) 2:49 Valid until 2025-05-11
Sun 11:10 Sarasota/Bradenton (SRQ) 14:00 Flint (FNT)
Allegiant Air G4 1550 Non-stop Airbus A320 (320) 2:50 Effective 2025-06-08 through 2025-06-15
Thu 17:22 Sarasota/Bradenton (SRQ) 20:06 Flint (FNT)
Allegiant Air G4 1552 Non-stop Airbus A320 (320) 2:44 Effective 2025-09-18 through 2025-09-25
Thu 11:37 Sarasota/Bradenton (SRQ) 14:30 Flint (FNT)
Allegiant Air G4 1553 Non-stop Airbus A320 (320) 2:53 Operates only on 2025-05-15
Thu 17:42 Sarasota/Bradenton (SRQ) 20:32 Flint (FNT)
Allegiant Air G4 3154 Non-stop Airbus A320 (320) 2:50 Effective 2025-11-06 through 2025-11-13
Sun 17:42 Sarasota/Bradenton (SRQ) 20:32 Flint (FNT)
Allegiant Air G4 3156 Non-stop Airbus A320 (320) 2:50 Effective 2025-11-09 through 2025-11-16
Tue 12:06 Sarasota/Bradenton (SRQ) 14:52 Flint (FNT)
Allegiant Air G4 3158 Non-stop Airbus A320 (320) 2:46 Effective 2025-10-07 through 2025-10-28
Thu,Sun 17:27 Sarasota/Bradenton (SRQ) 20:13 Flint (FNT)
Allegiant Air G4 3158 Non-stop Airbus A320 (320) 2:46 Effective 2025-10-02 through 2025-11-02
Sat 11:17 Sarasota/Bradenton (SRQ) 14:06 Flint (FNT)
Allegiant Air G4 3159 Non-stop Airbus A320 (320) 2:49 Valid until 2025-05-10
Tue 19:02 Sarasota/Bradenton (SRQ) 21:51 Flint (FNT)
Allegiant Air G4 3159 Non-stop Airbus A320 (320) 2:49 Valid until 2025-05-06
Sun 18:42 Sarasota/Bradenton (SRQ) 21:32 Flint (FNT)
Allegiant Air G4 3167 Non-stop Airbus A320 (320) 2:50 Effective 2025-06-22 through 2025-06-29
Tue 11:40 Sarasota/Bradenton (SRQ) 14:30 Flint (FNT)
Allegiant Air G4 3170 Non-stop Airbus A320 (320) 2:50 Operates only on 2025-07-01
Sun 17:22 Sarasota/Bradenton (SRQ) 20:06 Flint (FNT)
Allegiant Air G4 3170 Non-stop Airbus A320 (320) 2:44 Effective 2025-09-21 through 2025-09-28
Thu 18:31 Sarasota/Bradenton (SRQ) 21:16 Flint (FNT)
Allegiant Air G4 3170 Non-stop Airbus A320 (320) 2:45 Effective 2025-07-03 through 2025-08-07
Thu 18:32 Sarasota/Bradenton (SRQ) 21:22 Flint (FNT)
Allegiant Air G4 3171 Non-stop Airbus A320 (320) 2:50 Effective 2025-06-19 through 2025-06-26
Sun 18:31 Sarasota/Bradenton (SRQ) 21:16 Flint (FNT)
Allegiant Air G4 3177 Non-stop Airbus A320 (320) 2:45 Effective 2025-08-03 through 2025-08-10


All airlines flying from Sarasota/Bradenton (SRQ) to Flint (FNT).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2025-11-04 through 2025-11-18
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:50, non-stop
Airbus A320 (320)

Operates only on 2025-08-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:53, non-stop
Airbus A320 (320)

Operates only on 2025-08-14
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:53, non-stop
Airbus A320 (320)

Effective 2025-07-06 through 2025-07-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:45, non-stop
Airbus A320 (320)

Effective 2025-05-22 through 2025-05-29
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:53, non-stop
Airbus A320 (320)

Effective 2025-05-25 through 2025-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:53, non-stop
Airbus A320 (320)

Effective 2025-06-05 through 2025-06-12
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:50, non-stop
Airbus A320 (320)

Operates only on 2025-05-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:53, non-stop
Airbus A320 (320)

Valid until 2025-05-11
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 2:49, non-stop
Airbus A320 (320)

Effective 2025-06-08 through 2025-06-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:50, non-stop
Airbus A320 (320)

Effective 2025-09-18 through 2025-09-25
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:44, non-stop
Airbus A320 (320)

Operates only on 2025-05-15
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:53, non-stop
Airbus A320 (320)

Effective 2025-11-06 through 2025-11-13
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:50, non-stop
Airbus A320 (320)

Effective 2025-11-09 through 2025-11-16
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:50, non-stop
Airbus A320 (320)

Effective 2025-10-07 through 2025-10-28
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:46, non-stop
Airbus A320 (320)

Effective 2025-10-02 through 2025-11-02
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 2:46, non-stop
Airbus A320 (320)

Valid until 2025-05-10
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:49, non-stop
Airbus A320 (320)

Valid until 2025-05-06
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:49, non-stop
Airbus A320 (320)

Effective 2025-06-22 through 2025-06-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:50, non-stop
Airbus A320 (320)

Operates only on 2025-07-01
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:50, non-stop
Airbus A320 (320)

Effective 2025-09-21 through 2025-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:44, non-stop
Airbus A320 (320)

Effective 2025-07-03 through 2025-08-07
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Airbus A320 (320)

Effective 2025-06-19 through 2025-06-26
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:50, non-stop
Airbus A320 (320)

Effective 2025-08-03 through 2025-08-10
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:45, non-stop
Airbus A320 (320)
  • A domestic route departing from the Sarasota/Bradenton airport (SRQ) and arriving at Flint airport (FNT).
  • The flight distance is 1077 miles, or 1733 km.
  • The timezone of both the departure and the arrival airports is UTC-5 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 2:44 and 2:53.