All airlines flying from Montevideo (MVD) to Lima (LIM).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Mon-Sat 07:25 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 5:05 Valid until 2024-09-07
Sun 07:25 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 5:05 Operates only on 2024-09-01
Daily 07:25 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 5:05 Effective 2024-09-08 through 2024-10-26
Daily 07:25 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 5:05 Effective from 2025-03-30
Mon,Wed,Thu,Sat,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2024-10-27 through 2024-11-04
Tue,Fri 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2024-10-29 through 2024-11-01
Daily 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2024-11-05 through 2024-11-14
Mon,Fri,Sat 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2024-11-15 through 2024-11-18
Tue-Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2024-11-17 through 2024-11-24
Mon-Thu,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2024-11-25 through 2024-12-01
Mon,Tue,Fri,Sat 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2024-11-29 through 2024-12-03
Daily 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2024-12-04 through 2024-12-10
Tue,Wed 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2024-12-11 through 2024-12-17
Mon,Wed-Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2024-12-12 through 2024-12-18
Wed,Thu,Sat,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2024-12-19 through 2024-12-25
Mon,Tue,Thu,Fri 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2024-12-20 through 2024-12-27
Tue-Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2024-12-28 through 2025-01-03
Mon,Sat,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2024-12-30 through 2025-01-06
Tue-Thu,Sat 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2025-01-07 through 2025-01-11
Mon,Tue,Fri,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2025-01-10 through 2025-01-14
Tue-Fri 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2025-01-15 through 2025-01-21
Mon,Wed,Thu,Sat,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2025-01-18 through 2025-01-25
Fri,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2025-01-24 through 2025-01-31
Mon-Thu,Sat,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2025-01-27 through 2025-02-15
Fri 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2025-02-07 through 2025-02-14
Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Operates only on 2025-02-16
Daily 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2025-02-17 through 2025-02-25
Tue,Wed,Fri 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2025-02-26 through 2025-03-04
Mon,Wed,Thu,Sat,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2025-02-27 through 2025-03-06
Tue,Fri,Sat 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2025-03-07 through 2025-03-11
Mon,Wed-Fri,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2025-03-09 through 2025-03-14
Mon,Wed,Thu,Sat,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2025-03-15 through 2025-03-24
Tue,Fri 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Effective 2025-03-18 through 2025-03-21
Tue,Wed,Fri,Sat 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A320 (320) 4:55 Effective 2025-03-25 through 2025-03-29
Thu 07:35 Montevideo (MVD) 10:30 Lima (LIM)
LATAM Airlines LA 2421 Non-stop Airbus A319 (319) 4:55 Operates only on 2025-03-27
Tue,Thu,Sun 04:40 Montevideo (MVD) 07:50 Lima (LIM)
Sky Airline H2 5585 Non-stop Airbus A320neo (32N) 5:10 Effective 2025-01-02 through 2025-03-27
Thu,Sat 04:40 Montevideo (MVD) 07:50 Lima (LIM)
Sky Airline H2 5587 Non-stop Airbus A320neo (32N) 5:10 Effective 2024-09-05 through 2024-11-30
Tue,Thu,Sun 04:40 Montevideo (MVD) 07:50 Lima (LIM)
Sky Airline H2 5588 Non-stop Airbus A320neo (32N) 5:10 Effective 2024-12-03 through 2024-12-31
Direct Codeshare Flights:
Sun 07:25 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A319 (319) 5:05 Operates only on 2024-09-01
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Daily 07:25 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A320 (320) 5:05 Effective 2024-09-02 through 2024-10-26
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Daily 07:25 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A320 (320) 5:05 Effective from 2025-03-30
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Mon,Wed,Thu,Sat,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A320 (320) 4:55 Effective 2024-10-27 through 2024-11-04
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Tue,Fri 07:35 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A319 (319) 4:55 Effective 2024-10-29 through 2024-11-01
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Daily 07:35 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A320 (320) 4:55 Effective 2024-11-05 through 2024-11-14
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Mon,Fri,Sat 07:35 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A319 (319) 4:55 Effective 2024-11-15 through 2024-11-18
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Tue-Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A320 (320) 4:55 Effective 2024-11-17 through 2024-11-24
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Mon-Thu,Sun 07:35 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A320 (320) 4:55 Effective 2024-11-25 through 2024-12-01
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Mon,Tue,Fri,Sat 07:35 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A319 (319) 4:55 Effective 2024-11-29 through 2024-12-03
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Daily 07:35 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A320 (320) 4:55 Effective 2024-12-04 through 2024-12-10
Codeshare flight, operated by LATAM Airlines.(LA 2421)
Tue,Wed 07:35 Montevideo (MVD) 10:30 Lima (LIM)
Delta Air Lines DL 6350 Non-stop Airbus A319 (319) 4:55 Effective 2024-12-11 through 2024-12-17
Codeshare flight, operated by LATAM Airlines.(LA 2421)
1 2   next


All airlines flying from Montevideo (MVD) to Lima (LIM).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Valid until 2024-09-07
Mon
Tue
Wed
Thu
Fri
Sat
Sun
-
Duration: 5:05, non-stop
Airbus A320 (320)

Operates only on 2024-09-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:05, non-stop
Airbus A319 (319)

Effective 2024-09-08 through 2024-10-26
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 5:05, non-stop
Airbus A320 (320)

Effective from 2025-03-30
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 5:05, non-stop
Airbus A320 (320)

Effective 2024-10-27 through 2024-11-04
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-10-29 through 2024-11-01
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2024-11-05 through 2024-11-14
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-11-15 through 2024-11-18
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2024-11-17 through 2024-11-24
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-11-25 through 2024-12-01
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-11-29 through 2024-12-03
Mon
Tue
Wed
-
Thu
-
Fri
Sat
Sun
-
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2024-12-04 through 2024-12-10
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-12-11 through 2024-12-17
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2024-12-12 through 2024-12-18
Mon
Tue
-
Wed
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-12-19 through 2024-12-25
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2024-12-20 through 2024-12-27
Mon
Tue
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-12-28 through 2025-01-03
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-12-30 through 2025-01-06
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2025-01-07 through 2025-01-11
Mon
-
Tue
Wed
Thu
Fri
-
Sat
Sun
-
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2025-01-10 through 2025-01-14
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2025-01-15 through 2025-01-21
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2025-01-18 through 2025-01-25
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2025-01-24 through 2025-01-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2025-01-27 through 2025-02-15
Mon
Tue
Wed
Thu
Fri
-
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2025-02-07 through 2025-02-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Airbus A319 (319)

Operates only on 2025-02-16
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2025-02-17 through 2025-02-25
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2025-02-26 through 2025-03-04
Mon
-
Tue
Wed
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2025-02-27 through 2025-03-06
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2025-03-07 through 2025-03-11
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
Sun
-
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2025-03-09 through 2025-03-14
Mon
Tue
-
Wed
Thu
Fri
Sat
-
Sun
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2025-03-15 through 2025-03-24
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2025-03-18 through 2025-03-21
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2025-03-25 through 2025-03-29
Mon
-
Tue
Wed
Thu
-
Fri
Sat
Sun
-
Duration: 4:55, non-stop
Airbus A320 (320)

Operates only on 2025-03-27
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2025-01-02 through 2025-03-27
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 5:10, non-stop
Airbus A320neo (32N)

Effective 2024-09-05 through 2024-11-30
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 5:10, non-stop
Airbus A320neo (32N)

Effective 2024-12-03 through 2024-12-31
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 5:10, non-stop
Airbus A320neo (32N)

Direct Codeshare Flights:

Operates only on 2024-09-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 5:05, non-stop
Airbus A319 (319)

Effective 2024-09-02 through 2024-10-26
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 5:05, non-stop
Airbus A320 (320)

Effective from 2025-03-30
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 5:05, non-stop
Airbus A320 (320)

Effective 2024-10-27 through 2024-11-04
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-10-29 through 2024-11-01
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2024-11-05 through 2024-11-14
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-11-15 through 2024-11-18
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2024-11-17 through 2024-11-24
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-11-25 through 2024-12-01
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-11-29 through 2024-12-03
Mon
Tue
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 4:55, non-stop
Airbus A319 (319)

Effective 2024-12-04 through 2024-12-10
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 4:55, non-stop
Airbus A320 (320)

Effective 2024-12-11 through 2024-12-17
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2421)
Duration: 4:55, non-stop
Airbus A319 (319)
Page 1 / 2        next
  • An international route departing from Montevideo airport, Uruguay (MVD) and arriving at Lima airport, Peru (LIM).
  • The flight distance is 2056 miles, or 3308 km.
  • The timezone of the departure airport is UTC-3 , and the timezone of the arrival airport is UTC-5 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 4:55 and 5:10.