All airlines flying from Luton, London (LTN) to Naples (NAP).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Tue,Wed 06:00 Luton, London (LTN) 09:45 Naples (NAP)
easyJet U2 2493 Non-stop Airbus A320 (320) 2:45 Effective from 2024-04-02
Mon,Thu 06:10 Luton, London (LTN) 09:55 Naples (NAP)
easyJet U2 2493 Non-stop Airbus A320 (320) 2:45 Effective from 2024-04-01
Fri,Sun 06:15 Luton, London (LTN) 10:00 Naples (NAP)
easyJet U2 2493 Non-stop Airbus A319 (319) 2:45 Effective from 2024-03-31
Fri 06:30 Luton, London (LTN) 10:15 Naples (NAP)
easyJet U2 2493 Non-stop Airbus A320 (320) 2:45 Valid until 2024-02-09
Fri 06:30 Luton, London (LTN) 10:15 Naples (NAP)
easyJet U2 2493 Non-stop Airbus A319 (319) 2:45 Effective 2024-02-16 through 2024-02-23
Fri 06:30 Luton, London (LTN) 10:15 Naples (NAP)
easyJet U2 2493 Non-stop Airbus A320 (320) 2:45 Effective 2024-03-01 through 2024-03-29
Mon 15:45 Luton, London (LTN) 19:30 Naples (NAP)
easyJet U2 2493 Non-stop Airbus A320 (320) 2:45 Valid until 2024-02-05
Mon 15:45 Luton, London (LTN) 19:30 Naples (NAP)
easyJet U2 2493 Non-stop Airbus A319 (319) 2:45 Operates only on 2024-02-12
Mon 15:45 Luton, London (LTN) 19:30 Naples (NAP)
easyJet U2 2493 Non-stop Airbus A320 (320) 2:45 Effective 2024-02-19 through 2024-02-26
Mon 15:45 Luton, London (LTN) 19:30 Naples (NAP)
easyJet U2 2493 Non-stop Airbus A319 (319) 2:45 Effective 2024-03-04 through 2024-03-25
Mon 09:00 Luton, London (LTN) 12:45 Naples (NAP)
Ryanair FR 5455 Non-stop Boeing 737-800 (73H) 2:45 Valid until 2024-03-25
Thu 09:00 Luton, London (LTN) 12:45 Naples (NAP)
Ryanair FR 5455 Non-stop Boeing 737-800 (73H) 2:45 Effective from 2024-04-04
Fri 09:20 Luton, London (LTN) 13:05 Naples (NAP)
Ryanair FR 5455 Non-stop Boeing 737-800 (73H) 2:45 Valid until 2024-03-29
Sat 12:45 Luton, London (LTN) 16:30 Naples (NAP)
Ryanair FR 5455 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective from 2024-04-06
Sun 13:30 Luton, London (LTN) 17:15 Naples (NAP)
Ryanair FR 5455 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Valid until 2024-01-07
Sun 13:30 Luton, London (LTN) 17:15 Naples (NAP)
Ryanair FR 5455 Non-stop Boeing 737-800 (73H) 2:45 Effective 2024-01-14 through 2024-03-24
Wed 16:35 Luton, London (LTN) 20:20 Naples (NAP)
Ryanair FR 5455 Non-stop Boeing 737-800 (73H) 2:45 Effective 2024-04-03 through 2024-10-30
Tue 17:20 Luton, London (LTN) 21:05 Naples (NAP)
Ryanair FR 5455 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective from 2024-04-02


All airlines flying from Luton, London (LTN) to Naples (NAP).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective from 2024-04-02
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Airbus A320 (320)

Effective from 2024-04-01
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Airbus A320 (320)

Effective from 2024-03-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 2:45, non-stop
Airbus A319 (319)

Valid until 2024-02-09
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:45, non-stop
Airbus A320 (320)

Effective 2024-02-16 through 2024-02-23
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:45, non-stop
Airbus A319 (319)

Effective 2024-03-01 through 2024-03-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:45, non-stop
Airbus A320 (320)

Valid until 2024-02-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Airbus A320 (320)

Operates only on 2024-02-12
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Airbus A319 (319)

Effective 2024-02-19 through 2024-02-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Airbus A320 (320)

Effective 2024-03-04 through 2024-03-25
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Airbus A319 (319)

Valid until 2024-03-25
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Boeing 737-800 (73H)

Effective from 2024-04-04
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Boeing 737-800 (73H)

Valid until 2024-03-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:45, non-stop
Boeing 737-800 (73H)

Effective from 2024-04-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2024-01-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-01-14 through 2024-03-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:45, non-stop
Boeing 737-800 (73H)

Effective 2024-04-03 through 2024-10-30
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Boeing 737-800 (73H)

Effective from 2024-04-02
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)
  • An international route departing from Luton, London airport, United Kingdom (LTN) and arriving at Naples airport, Italy (NAP).
  • The flight distance is 1027 miles, or 1653 km.
  • The timezone of the departure airport is UTC+0 , and the timezone of the arrival airport is UTC+1 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time is 2:45.