All airlines flying from Lima (LIM) to Chiclayo (CIX).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sat 18:30 Lima (LIM) 19:57 Chiclayo (CIX)
JetSmart Chile JA 7174 Non-stop Airbus A320 (320) 1:27 Operates only on 2024-09-28
Sat 18:35 Lima (LIM) 20:02 Chiclayo (CIX)
JetSmart Chile JA 7174 Non-stop Airbus A320 (320) 1:27 Operates only on 2024-09-14
Sat 18:50 Lima (LIM) 20:17 Chiclayo (CIX)
JetSmart Chile JA 7174 Non-stop Airbus A320 (320) 1:27 Operates only on 2024-09-21
Tue 19:20 Lima (LIM) 20:47 Chiclayo (CIX)
JetSmart Chile JA 7174 Non-stop Airbus A320 (320) 1:27 Effective 2024-10-01 through 2024-10-08
Tue 19:55 Lima (LIM) 21:22 Chiclayo (CIX)
JetSmart Chile JA 7174 Non-stop Airbus A320 (320) 1:27 Effective 2024-09-17 through 2024-09-24
Thu 20:35 Lima (LIM) 22:02 Chiclayo (CIX)
JetSmart Chile JA 7174 Non-stop Airbus A320 (320) 1:27 Valid until 2024-09-12
Direct Codeshare Flights:
Wed 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6008 Non-stop Airbus A319 (319) 1:30 Valid until 2024-09-25
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Wed 13:00 Lima (LIM) 14:25 Chiclayo (CIX)
Delta Air Lines DL 6012 Non-stop Airbus A319 (319) 1:25 Operates only on 2024-12-11
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Wed 13:00 Lima (LIM) 14:25 Chiclayo (CIX)
Delta Air Lines DL 6012 Non-stop Airbus A320 (320) 1:25 Operates only on 2024-12-18
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Wed 13:00 Lima (LIM) 14:25 Chiclayo (CIX)
Delta Air Lines DL 6012 Non-stop Airbus A319 (319) 1:25 Operates only on 2024-12-25
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Wed 13:00 Lima (LIM) 14:25 Chiclayo (CIX)
Delta Air Lines DL 6012 Non-stop Airbus A320 (320) 1:25 Operates only on 2025-01-01
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Wed 13:00 Lima (LIM) 14:25 Chiclayo (CIX)
Delta Air Lines DL 6012 Non-stop Airbus A319 (319) 1:25 Operates only on 2025-01-08
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Sun 11:25 Lima (LIM) 12:55 Chiclayo (CIX)
Delta Air Lines DL 6019 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-10-06
Codeshare flight, operated by LATAM Airlines.(LA 2276)
Sun 11:25 Lima (LIM) 12:55 Chiclayo (CIX)
Delta Air Lines DL 6020 Non-stop Airbus A320 (320) 1:30 Effective 2024-10-13 through 2024-10-20
Codeshare flight, operated by LATAM Airlines.(LA 2276)
Thu,Sat 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2024-11-02 through 2024-11-07
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Thu 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2024-11-14 through 2024-11-21
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Thu,Sat,Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2024-11-23 through 2024-11-28
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Thu,Sat 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A319 (319) 1:30 Effective 2024-11-30 through 2024-12-05
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat,Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2024-12-01 through 2024-12-07
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat,Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A319 (319) 1:30 Effective 2024-12-08 through 2024-12-14
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat,Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2024-12-15 through 2024-12-22
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A319 (319) 1:30 Operates only on 2024-12-28
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat,Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2024-12-29 through 2025-01-18
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A319 (319) 1:30 Operates only on 2025-01-19
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat,Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2025-01-25 through 2025-02-15
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A319 (319) 1:30 Operates only on 2025-02-16
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat,Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2025-02-22 through 2025-03-08
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A319 (319) 1:30 Effective 2025-03-09 through 2025-03-16
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2025-03-15 through 2025-03-22
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat,Sun 07:50 Lima (LIM) 09:20 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2025-03-23 through 2025-03-29
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat 07:55 Lima (LIM) 09:25 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A319 (319) 1:30 Effective 2024-10-05 through 2024-10-26
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A319 (319) 1:30 Valid until 2024-09-07
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A320 (320) 1:30 Effective 2024-09-14 through 2024-09-21
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Sat 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6022 Non-stop Airbus A319 (319) 1:30 Operates only on 2024-09-28
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Wed 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6030 Non-stop Airbus A319 (319) 1:30 Operates only on 2024-10-02
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Wed 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6030 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-10-09
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Wed 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6030 Non-stop Airbus A319 (319) 1:30 Effective 2024-10-16 through 2024-10-23
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Wed 15:10 Lima (LIM) 16:40 Chiclayo (CIX)
Delta Air Lines DL 6035 Non-stop Airbus A319 (319) 1:30 Operates only on 2024-10-02
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Wed 15:10 Lima (LIM) 16:40 Chiclayo (CIX)
Delta Air Lines DL 6035 Non-stop Airbus A320 (320) 1:30 Effective 2024-10-09 through 2024-10-23
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Thu 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6041 Non-stop Airbus A319 (319) 1:30 Operates only on 2024-09-05
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Thu 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6041 Non-stop Airbus A320 (320) 1:30 Effective 2024-09-12 through 2024-10-17
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Thu 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6041 Non-stop Airbus A319 (319) 1:30 Operates only on 2024-10-24
Codeshare flight, operated by LATAM Airlines.(LA 2272)
Wed 08:10 Lima (LIM) 09:40 Chiclayo (CIX)
Delta Air Lines DL 6095 Non-stop Airbus A319 (319) 1:30 Effective from 2025-04-02
Codeshare flight, operated by LATAM Airlines.(LA 2221)
Sat 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6097 Non-stop Airbus A320 (320) 1:30 Effective from 2025-04-05
Codeshare flight, operated by LATAM Airlines.(LA 2280)
Wed 13:00 Lima (LIM) 14:25 Chiclayo (CIX)
Delta Air Lines DL 6112 Non-stop Airbus A320 (320) 1:25 Operates only on 2024-10-30
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Wed 13:00 Lima (LIM) 14:25 Chiclayo (CIX)
Delta Air Lines DL 6112 Non-stop Airbus A319 (319) 1:25 Operates only on 2024-11-06
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Wed 13:00 Lima (LIM) 14:25 Chiclayo (CIX)
Delta Air Lines DL 6112 Non-stop Airbus A320 (320) 1:25 Effective 2024-11-13 through 2024-11-20
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Wed 13:00 Lima (LIM) 14:25 Chiclayo (CIX)
Delta Air Lines DL 6112 Non-stop Airbus A319 (319) 1:25 Operates only on 2024-11-27
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Wed 13:00 Lima (LIM) 14:25 Chiclayo (CIX)
Delta Air Lines DL 6112 Non-stop Airbus A320 (320) 1:25 Operates only on 2024-12-04
Codeshare flight, operated by LATAM Airlines.(LA 2274)
Sat 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6117 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-09-21
Codeshare flight, operated by LATAM Airlines.(LA 2280)
prev   1 2 3 ... 5 6 7 8 9 10 11 ... 17 18 19   next


All airlines flying from Lima (LIM) to Chiclayo (CIX).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Operates only on 2024-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:27, non-stop
Airbus A320 (320)

Operates only on 2024-09-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:27, non-stop
Airbus A320 (320)

Operates only on 2024-09-21
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:27, non-stop
Airbus A320 (320)

Effective 2024-10-01 through 2024-10-08
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:27, non-stop
Airbus A320 (320)

Effective 2024-09-17 through 2024-09-24
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:27, non-stop
Airbus A320 (320)

Valid until 2024-09-12
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:27, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Valid until 2024-09-25
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Operates only on 2024-12-11
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:25, non-stop
Airbus A319 (319)

Operates only on 2024-12-18
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:25, non-stop
Airbus A320 (320)

Operates only on 2024-12-25
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:25, non-stop
Airbus A319 (319)

Operates only on 2025-01-01
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:25, non-stop
Airbus A320 (320)

Operates only on 2025-01-08
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:25, non-stop
Airbus A319 (319)

Operates only on 2024-10-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2276)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-10-13 through 2024-10-20
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2276)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-11-02 through 2024-11-07
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-11-14 through 2024-11-21
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-11-23 through 2024-11-28
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-11-30 through 2024-12-05
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-12-01 through 2024-12-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-12-08 through 2024-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-12-15 through 2024-12-22
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-12-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-12-29 through 2025-01-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2025-01-19
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2025-01-25 through 2025-02-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2025-02-16
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2025-02-22 through 2025-03-08
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2025-03-09 through 2025-03-16
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2025-03-15 through 2025-03-22
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2025-03-23 through 2025-03-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-10-05 through 2024-10-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Valid until 2024-09-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-09-14 through 2024-09-21
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Operates only on 2024-10-02
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Operates only on 2024-10-09
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-10-16 through 2024-10-23
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Operates only on 2024-10-02
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-10-09 through 2024-10-23
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-09-05
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-09-12 through 2024-10-17
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-10-24
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective from 2025-04-02
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2221)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective from 2025-04-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-10-30
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:25, non-stop
Airbus A320 (320)

Operates only on 2024-11-06
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:25, non-stop
Airbus A319 (319)

Effective 2024-11-13 through 2024-11-20
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:25, non-stop
Airbus A320 (320)

Operates only on 2024-11-27
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:25, non-stop
Airbus A319 (319)

Operates only on 2024-12-04
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2274)
Duration: 1:25, non-stop
Airbus A320 (320)

Operates only on 2024-09-21
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)
prev        Page 8 / 19        next
  • A domestic route departing from the Lima airport (LIM) and arriving at Chiclayo airport (CIX).
  • The flight distance is 406 miles, or 653 km.
  • The timezone of both the departure and the arrival airports is UTC-5 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 1:15 and 1:35.