All airlines flying from Baku (GYD) to Malpensa, Milan (MXP).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Mon,Wed,Thu,Sat,Sun 07:10 Baku (GYD) 1 10:25 Malpensa, Milan (MXP) 1
Azerbaijan Airlines J2 35 Non-stop Airbus A320 (320) 5:15 Valid until 2024-10-26
Mon,Wed,Thu,Sat,Sun 07:30 Baku (GYD) 1 09:45 Malpensa, Milan (MXP) 1
Azerbaijan Airlines J2 35 Non-stop Airbus A320 (320) 5:15 Effective 2024-10-27 through 2024-12-30
Mon,Wed,Thu,Sat,Sun 07:30 Baku (GYD) 1 09:45 Malpensa, Milan (MXP) 1
Azerbaijan Airlines J2 35 Non-stop Airbus A320 (320) 5:15 Effective 2025-01-02 through 2025-03-29
Mon,Wed,Thu,Sat,Sun 07:30 Baku (GYD) 1 09:45 Malpensa, Milan (MXP) 1
Azerbaijan Airlines J2 35 Non-stop Airbus A320 (320) 4:15 Effective from 2025-03-30
Sun 17:30 Baku (GYD) 20:30 Malpensa, Milan (MXP)
Cargolux Italia C8 7737 Non-stop Boeing 747 Freighter (74F) 5:00 Valid until 2024-10-20
This is a Scheduled Cargo flight.
Sun 17:30 Baku (GYD) 20:30 Malpensa, Milan (MXP)
Cargolux Italia C8 7737 Non-stop Boeing 747 Freighter (74F) 6:00 Effective 2024-10-27 through 2025-03-23
This is a Scheduled Cargo flight.
Sun 17:30 Baku (GYD) 20:30 Malpensa, Milan (MXP)
Cargolux Italia C8 7737 Non-stop Boeing 747 Freighter (74F) 5:00 Effective from 2025-03-30
This is a Scheduled Cargo flight.
Mon 01:20 Baku (GYD) 04:30 Malpensa, Milan (MXP)
Cargolux Italia C8 9267 Non-stop Boeing 747 Freighter (74F) 5:10 Valid until 2024-10-21
This is a Scheduled Cargo flight.
Mon 01:20 Baku (GYD) 04:30 Malpensa, Milan (MXP)
Cargolux Italia C8 9267 Non-stop Boeing 747 Freighter (74F) 6:10 Effective 2024-10-28 through 2025-03-24
This is a Scheduled Cargo flight.
Mon 01:20 Baku (GYD) 04:30 Malpensa, Milan (MXP)
Cargolux Italia C8 9267 Non-stop Boeing 747 Freighter (74F) 5:10 Effective from 2025-03-31
This is a Scheduled Cargo flight.


All airlines flying from Baku (GYD) to Malpensa, Milan (MXP).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Valid until 2024-10-26
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 5:15, non-stop
Airbus A320 (320)

Effective 2024-10-27 through 2024-12-30
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 5:15, non-stop
Airbus A320 (320)

Effective 2025-01-02 through 2025-03-29
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 5:15, non-stop
Airbus A320 (320)

Effective from 2025-03-30
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Duration: 4:15, non-stop
Airbus A320 (320)

Valid until 2024-10-20
This is a Scheduled Cargo flight.
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:00, non-stop
Boeing 747 Freighter (74F)

Effective 2024-10-27 through 2025-03-23
This is a Scheduled Cargo flight.
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 6:00, non-stop
Boeing 747 Freighter (74F)

Effective from 2025-03-30
This is a Scheduled Cargo flight.
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:00, non-stop
Boeing 747 Freighter (74F)

Valid until 2024-10-21
This is a Scheduled Cargo flight.
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:10, non-stop
Boeing 747 Freighter (74F)

Effective 2024-10-28 through 2025-03-24
This is a Scheduled Cargo flight.
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:10, non-stop
Boeing 747 Freighter (74F)

Effective from 2025-03-31
This is a Scheduled Cargo flight.
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:10, non-stop
Boeing 747 Freighter (74F)
  • An international route departing from Baku airport, Azerbaijan (GYD) and arriving at Malpensa, Milan airport, Italy (MXP).
  • The flight distance is 2092 miles, or 3367 km.
  • The timezone of the departure airport is UTC+4 , and the timezone of the arrival airport is UTC+1 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 4:15 and 6:10.