All airlines flying from Burbank (BUR) to Milwaukee (MKE).

Select flight date:
FLIGHT SCHEDULE
Non-Direct Flights:
Thu,Fri,Sun 07:10 Burbank (BUR) 14:35 Milwaukee (MKE)
Southwest Airlines WN 1001 1-stop Boeing 737-700 (73W) 5:25 Effective 2024-11-03 through 2024-11-10
Mon,Thu,Fri,Sun 07:10 Burbank (BUR) 14:35 Milwaukee (MKE)
Southwest Airlines WN 1001 1-stop Boeing 737-700 (73W) 5:25 Effective 2024-11-11 through 2024-11-25
Fri,Sun 07:10 Burbank (BUR) 14:35 Milwaukee (MKE)
Southwest Airlines WN 1001 1-stop Boeing 737-700 (73W) 5:25 Effective 2024-12-08 through 2024-12-15
Thu 07:10 Burbank (BUR) 14:35 Milwaukee (MKE)
Southwest Airlines WN 1001 1-stop Boeing 737-700 (73W) 5:25 Operates only on 2024-12-19
Fri 07:10 Burbank (BUR) 14:35 Milwaukee (MKE)
Southwest Airlines WN 1001 1-stop Boeing 737-700 (73W) 5:25 Operates only on 2025-01-03
Thu,Fri,Sun 15:45 Burbank (BUR) 22:55 Milwaukee (MKE)
Southwest Airlines WN 1476 1-stop Boeing 737-700 (73W) 5:10 Effective 2025-01-12 through 2025-01-17
Mon,Sun 15:45 Burbank (BUR) 22:55 Milwaukee (MKE)
Southwest Airlines WN 1476 1-stop Boeing 737-700 (73W) 5:10 Effective 2025-01-20 through 2025-01-26
Thu,Fri,Sun 15:45 Burbank (BUR) 22:55 Milwaukee (MKE)
Southwest Airlines WN 1476 1-stop Boeing 737-700 (73W) 5:10 Effective 2025-02-02 through 2025-02-07
Mon 15:45 Burbank (BUR) 22:55 Milwaukee (MKE)
Southwest Airlines WN 1476 1-stop Boeing 737-700 (73W) 5:10 Operates only on 2025-02-10
Mon,Tue,Thu 15:45 Burbank (BUR) 22:55 Milwaukee (MKE)
Southwest Airlines WN 1476 1-stop Boeing 737-700 (73W) 5:10 Effective 2025-02-18 through 2025-02-24
Mon 15:45 Burbank (BUR) 22:55 Milwaukee (MKE)
Southwest Airlines WN 1476 1-stop Boeing 737-700 (73W) 5:10 Operates only on 2025-03-03
Thu,Fri,Sun 11:20 Burbank (BUR) 18:50 Milwaukee (MKE)
Southwest Airlines WN 4960 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-11-03 through 2024-11-10
Mon,Thu,Fri,Sun 11:20 Burbank (BUR) 18:50 Milwaukee (MKE)
Southwest Airlines WN 4960 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-11-11 through 2024-11-25
Fri,Sun 11:20 Burbank (BUR) 18:50 Milwaukee (MKE)
Southwest Airlines WN 4960 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-12-08 through 2024-12-15
Thu 11:20 Burbank (BUR) 18:50 Milwaukee (MKE)
Southwest Airlines WN 4960 1-stop Boeing 737-700 (73W) 5:30 Operates only on 2024-12-19
Fri 11:20 Burbank (BUR) 18:50 Milwaukee (MKE)
Southwest Airlines WN 4960 1-stop Boeing 737-700 (73W) 5:30 Operates only on 2025-01-03
Mon-Wed 14:35 Burbank (BUR) 00:15 Milwaukee (MKE)
Southwest Airlines WN 419 2-stop Boeing 737-700 (73W) 7:40 Effective 2024-11-26 through 2024-12-02
The flight arrives 1 day after departure.
Mon,Thu,Fri,Sun 14:35 Burbank (BUR) 00:15 Milwaukee (MKE)
Southwest Airlines WN 419 2-stop Boeing 737-700 (73W) 7:40 Effective 2024-12-20 through 2025-01-02
The flight arrives 1 day after departure.
Sun 14:35 Burbank (BUR) 00:15 Milwaukee (MKE)
Southwest Airlines WN 419 2-stop Boeing 737-700 (73W) 7:40 Operates only on 2025-01-05
The flight arrives 1 day after departure.


All airlines flying from Burbank (BUR) to Milwaukee (MKE).
Select flight date:
FLIGHT SCHEDULE
Non-Direct Flights:

Effective 2024-11-03 through 2024-11-10
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:25, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-11 through 2024-11-25
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:25, 1-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 5:25, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-12-19
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 5:25, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 5:25, 1-stop
Boeing 737-700 (73W)

Effective 2025-01-12 through 2025-01-17
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Effective 2025-01-20 through 2025-01-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-02 through 2025-02-07
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-02-10
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-18 through 2025-02-24
Mon
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-03-03
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-03 through 2024-11-10
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-11 through 2024-11-25
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-12-19
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

14:35

00:15(+1)
Effective 2024-11-26 through 2024-12-02
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 7:40, 2-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

14:35

00:15(+1)
Effective 2024-12-20 through 2025-01-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 7:40, 2-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

14:35

00:15(+1)
Operates only on 2025-01-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 7:40, 2-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.
  • A domestic route departing from the Burbank airport (BUR) and arriving at Milwaukee airport (MKE).
  • The flight distance is 1740 miles, or 2801 km.
  • The timezone of the departure airport is UTC-8 , and the timezone of the arrival airport is UTC-6 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.