Southwest Airlines flights from Sacramento (SMF) to Denver (DEN).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sat 05:10 Sacramento (SMF) B 08:35 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-23 through 2024-11-30
Sat 05:10 Sacramento (SMF) B 08:35 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-21 through 2025-01-04
Sat 05:15 Sacramento (SMF) B 08:35 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-02-15 through 2025-03-01
Thu,Fri,Sun 05:20 Sacramento (SMF) B 08:40 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-01-12 through 2025-01-17
Mon,Sun 05:20 Sacramento (SMF) B 08:40 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-01-20 through 2025-01-26
Thu,Fri,Sun 05:20 Sacramento (SMF) B 08:40 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-02-02 through 2025-02-07
Mon 05:20 Sacramento (SMF) B 08:40 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2025-02-10
Mon,Tue,Thu 05:20 Sacramento (SMF) B 08:40 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-02-18 through 2025-02-24
Mon 05:20 Sacramento (SMF) B 08:40 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2025-03-03
Thu,Fri,Sun 05:35 Sacramento (SMF) B 09:00 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-03 through 2024-11-10
Mon,Thu,Fri,Sun 05:35 Sacramento (SMF) B 09:00 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-11 through 2024-11-25
Fri,Sun 05:35 Sacramento (SMF) B 09:00 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-08 through 2024-12-15
Thu 05:35 Sacramento (SMF) B 09:00 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2024-12-19
Fri 05:35 Sacramento (SMF) B 09:00 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2025-01-03
Mon-Fri 05:40 Sacramento (SMF) B 09:00 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-01-07 through 2025-01-15
Tue-Fri,Sun 05:40 Sacramento (SMF) B 09:00 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-01-19 through 2025-01-24
Mon-Fri 05:40 Sacramento (SMF) B 09:00 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-01-27 through 2025-02-05
Tue,Wed,Sun 05:40 Sacramento (SMF) B 09:00 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-09 through 2025-02-12
Tue,Wed 05:40 Sacramento (SMF) B 09:00 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-19 through 2025-03-05
Mon,Thu,Fri,Sun 05:50 Sacramento (SMF) B 09:10 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-02-13 through 2025-02-17
Thu,Fri,Sun 05:50 Sacramento (SMF) B 09:10 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2025-02-21 through 2025-03-02
Mon-Wed 06:05 Sacramento (SMF) B 09:25 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-04 through 2024-11-06
Tue,Wed 06:05 Sacramento (SMF) B 09:25 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-12 through 2024-11-20
Thu 06:05 Sacramento (SMF) B 09:25 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-11-28
Tue-Fri 06:05 Sacramento (SMF) B 09:25 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-29 through 2024-12-06
Mon-Thu 06:05 Sacramento (SMF) B 09:25 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-09 through 2024-12-18
Tue,Wed 06:05 Sacramento (SMF) B 09:25 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-24 through 2025-01-01
Mon 06:05 Sacramento (SMF) B 09:25 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2025-01-06
Mon-Wed 07:05 Sacramento (SMF) B 10:30 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-26 through 2024-12-02
Mon,Thu,Fri,Sun 07:05 Sacramento (SMF) B 10:30 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-20 through 2025-01-02
Sun 07:05 Sacramento (SMF) B 10:30 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2025-01-05
Sun 13:35 Sacramento (SMF) B 16:55 Denver (DEN)
Southwest Airlines WN 160 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-12-01
Sun 10:50 Sacramento (SMF) B 14:10 Denver (DEN)
Southwest Airlines WN 187 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-12-01
Thu,Fri,Sun 15:50 Sacramento (SMF) B 19:10 Denver (DEN)
Southwest Airlines WN 266 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-01-12 through 2025-01-17
Mon,Sun 15:50 Sacramento (SMF) B 19:10 Denver (DEN)
Southwest Airlines WN 266 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-01-20 through 2025-01-26
Thu,Fri,Sun 15:50 Sacramento (SMF) B 19:10 Denver (DEN)
Southwest Airlines WN 266 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-02 through 2025-02-07
Mon 15:50 Sacramento (SMF) B 19:10 Denver (DEN)
Southwest Airlines WN 266 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2025-02-10
Mon,Tue,Thu 15:50 Sacramento (SMF) B 19:10 Denver (DEN)
Southwest Airlines WN 266 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-18 through 2025-02-24
Mon 15:50 Sacramento (SMF) B 19:10 Denver (DEN)
Southwest Airlines WN 266 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2025-03-03
Mon-Wed 14:20 Sacramento (SMF) B 17:40 Denver (DEN)
Southwest Airlines WN 313 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-11-04 through 2024-11-06
Tue,Wed 14:20 Sacramento (SMF) B 17:40 Denver (DEN)
Southwest Airlines WN 313 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-11-12 through 2024-11-20
Tue-Fri 14:20 Sacramento (SMF) B 17:40 Denver (DEN)
Southwest Airlines WN 313 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-11-29 through 2024-12-06
Mon-Thu 14:20 Sacramento (SMF) B 17:40 Denver (DEN)
Southwest Airlines WN 313 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-12-09 through 2024-12-18
Tue,Wed 14:20 Sacramento (SMF) B 17:40 Denver (DEN)
Southwest Airlines WN 313 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-12-24 through 2025-01-01
Mon 14:20 Sacramento (SMF) B 17:40 Denver (DEN)
Southwest Airlines WN 313 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2025-01-06
Mon,Thu,Fri,Sun 16:40 Sacramento (SMF) B 19:55 Denver (DEN)
Southwest Airlines WN 314 Non-stop Boeing 737-700 (73W) 2:15 Effective 2025-02-13 through 2025-02-17
Thu,Fri,Sun 16:40 Sacramento (SMF) B 19:55 Denver (DEN)
Southwest Airlines WN 314 Non-stop Boeing 737-700 (73W) 2:15 Effective 2025-02-21 through 2025-03-02
Mon-Fri 16:45 Sacramento (SMF) B 20:00 Denver (DEN)
Southwest Airlines WN 314 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-01-07 through 2025-01-15
Tue-Fri,Sun 16:45 Sacramento (SMF) B 20:00 Denver (DEN)
Southwest Airlines WN 314 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-01-19 through 2025-01-24
Mon-Fri 16:45 Sacramento (SMF) B 20:00 Denver (DEN)
Southwest Airlines WN 314 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-01-27 through 2025-02-05
1 2 3 4 ... 7 8 9   next


Southwest Airlines flights from Sacramento (SMF) to Denver (DEN).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2024-11-23 through 2024-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-21 through 2025-01-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-15 through 2025-03-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-12 through 2025-01-17
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-20 through 2025-01-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-02 through 2025-02-07
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-02-10
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-18 through 2025-02-24
Mon
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-03-03
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-03 through 2024-11-10
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-11 through 2024-11-25
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-08 through 2024-12-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-19
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-07 through 2025-01-15
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2025-01-19 through 2025-01-24
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2025-01-27 through 2025-02-05
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-09 through 2025-02-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-19 through 2025-03-05
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-21 through 2025-03-02
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-04 through 2024-11-06
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-12 through 2024-11-20
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-28
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-29 through 2024-12-06
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-09 through 2024-12-18
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-24 through 2025-01-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Operates only on 2025-01-06
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-26 through 2024-12-02
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-20 through 2025-01-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2025-01-12 through 2025-01-17
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2025-01-20 through 2025-01-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-02 through 2025-02-07
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Operates only on 2025-02-10
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-18 through 2025-02-24
Mon
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Operates only on 2025-03-03
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-04 through 2024-11-06
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-12 through 2024-11-20
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-29 through 2024-12-06
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2024-12-09 through 2024-12-18
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2024-12-24 through 2025-01-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-06
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Effective 2025-02-21 through 2025-03-02
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Effective 2025-01-07 through 2025-01-15
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-19 through 2025-01-24
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-27 through 2025-02-05
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)
Page 1 / 9        next
  • A domestic route departing from the Sacramento airport (SMF) and arriving at Denver airport (DEN).
  • The flight distance is 907 miles, or 1459 km.
  • The timezone of the departure airport is UTC-8 , and the timezone of the arrival airport is UTC-7 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 2:15 and 2:25.