Southwest Airlines flights from Las Vegas Harry Reid (LAS) to Fresno (FAT).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sat 08:45 Las Vegas Harry Reid (LAS) 1 10:00 Fresno (FAT)
Southwest Airlines WN 49 Non-stop Boeing 737-700 (73W) 1:15 Effective 2025-08-09 through 2025-09-27
Tue,Wed 12:10 Las Vegas Harry Reid (LAS) 1 13:35 Fresno (FAT)
Southwest Airlines WN 147 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-08-05 through 2025-10-01
Mon,Thu,Fri 16:25 Las Vegas Harry Reid (LAS) 1 17:45 Fresno (FAT)
Southwest Airlines WN 224 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-08-07 through 2025-09-29
Sun 09:25 Las Vegas Harry Reid (LAS) 1 10:40 Fresno (FAT)
Southwest Airlines WN 340 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2025-08-31
Tue,Wed 14:10 Las Vegas Harry Reid (LAS) 1 15:30 Fresno (FAT)
Southwest Airlines WN 347 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-06-10 through 2025-07-30
Sat 21:40 Las Vegas Harry Reid (LAS) 1 22:55 Fresno (FAT)
Southwest Airlines WN 347 Non-stop Boeing 737-700 (73W) 1:15 Effective 2025-06-07 through 2025-08-02
Thu 10:00 Las Vegas Harry Reid (LAS) 1 11:20 Fresno (FAT)
Southwest Airlines WN 349 Non-stop Boeing 737-700 (Scimitar Winglets) 1:20 Operates only on 2025-11-27
Tue,Wed 08:15 Las Vegas Harry Reid (LAS) 1 09:30 Fresno (FAT)
Southwest Airlines WN 417 Non-stop Boeing 737-700 (73W) 1:15 Effective 2025-06-10 through 2025-07-30
Sat 13:55 Las Vegas Harry Reid (LAS) 1 15:15 Fresno (FAT)
Southwest Airlines WN 417 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-06-07 through 2025-08-02
Sun 14:45 Las Vegas Harry Reid (LAS) 1 16:05 Fresno (FAT)
Southwest Airlines WN 417 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-06-08 through 2025-08-03
Thu 15:20 Las Vegas Harry Reid (LAS) 1 16:40 Fresno (FAT)
Southwest Airlines WN 614 Non-stop Boeing 737-700 (Scimitar Winglets) 1:20 Operates only on 2025-11-27
Tue,Wed 14:50 Las Vegas Harry Reid (LAS) 1 16:05 Fresno (FAT)
Southwest Airlines WN 935 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-11-04 through 2025-11-12
Mon-Thu 14:50 Las Vegas Harry Reid (LAS) 1 16:05 Fresno (FAT)
Southwest Airlines WN 935 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-11-17 through 2025-11-20
Mon-Fri 14:50 Las Vegas Harry Reid (LAS) 1 16:05 Fresno (FAT)
Southwest Airlines WN 935 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-12-02 through 2025-12-11
Mon-Wed 14:50 Las Vegas Harry Reid (LAS) 1 16:05 Fresno (FAT)
Southwest Airlines WN 935 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-12-15 through 2025-12-17
Wed,Thu 14:50 Las Vegas Harry Reid (LAS) 1 16:05 Fresno (FAT)
Southwest Airlines WN 935 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-12-24 through 2026-01-01
Sun 08:20 Las Vegas Harry Reid (LAS) 1 09:35 Fresno (FAT)
Southwest Airlines WN 1076 Non-stop Boeing 737-800 (73H) 1:15 Valid until 2025-05-18
Sun 08:20 Las Vegas Harry Reid (LAS) 1 09:35 Fresno (FAT)
Southwest Airlines WN 1076 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2025-06-01
Mon,Thu,Fri 08:55 Las Vegas Harry Reid (LAS) 1 10:10 Fresno (FAT)
Southwest Airlines WN 1076 Non-stop Boeing 737-800 (73H) 1:15 Valid until 2025-06-02
Sun 09:00 Las Vegas Harry Reid (LAS) 1 10:15 Fresno (FAT)
Southwest Airlines WN 1076 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Operates only on 2025-05-25
Tue,Wed 13:45 Las Vegas Harry Reid (LAS) 1 15:00 Fresno (FAT)
Southwest Airlines WN 1076 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Valid until 2025-06-04
Sun 08:05 Las Vegas Harry Reid (LAS) 1 09:20 Fresno (FAT)
Southwest Airlines WN 1152 Non-stop Boeing 737-700 (73W) 1:15 Effective 2025-06-08 through 2025-08-03
Fri 08:40 Las Vegas Harry Reid (LAS) 1 10:00 Fresno (FAT)
Southwest Airlines WN 1152 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-07-04
Sat 08:45 Las Vegas Harry Reid (LAS) 1 10:05 Fresno (FAT)
Southwest Airlines WN 1152 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-06-07 through 2025-08-02
Mon,Thu,Fri 08:50 Las Vegas Harry Reid (LAS) 1 10:10 Fresno (FAT)
Southwest Airlines WN 1152 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 08:50 Las Vegas Harry Reid (LAS) 1 10:10 Fresno (FAT)
Southwest Airlines WN 1152 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-07-07 through 2025-08-04
Tue,Wed 11:50 Las Vegas Harry Reid (LAS) 1 13:10 Fresno (FAT)
Southwest Airlines WN 1152 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-06-10 through 2025-07-30
Tue,Wed,Sat 22:40 Las Vegas Harry Reid (LAS) 1 23:50 Fresno (FAT)
Southwest Airlines WN 1433 Non-stop Boeing 737-800 (73H) 1:10 Effective 2025-11-22 through 2025-11-29
Mon 22:40 Las Vegas Harry Reid (LAS) 1 23:50 Fresno (FAT)
Southwest Airlines WN 1433 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2025-12-01
Mon,Tue,Fri-Sun 22:40 Las Vegas Harry Reid (LAS) 1 23:50 Fresno (FAT)
Southwest Airlines WN 1433 Non-stop Boeing 737-800 (73H) 1:10 Effective 2025-12-19 through 2026-01-04
Sun 16:05 Las Vegas Harry Reid (LAS) 1 17:20 Fresno (FAT)
Southwest Airlines WN 1436 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Operates only on 2025-11-30
Mon,Thu,Fri,Sun 17:25 Las Vegas Harry Reid (LAS) 1 18:40 Fresno (FAT)
Southwest Airlines WN 1436 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-11-02 through 2025-11-16
Mon,Fri,Sun 17:25 Las Vegas Harry Reid (LAS) 1 18:40 Fresno (FAT)
Southwest Airlines WN 1436 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-11-21 through 2025-11-28
Fri,Sun 17:25 Las Vegas Harry Reid (LAS) 1 18:40 Fresno (FAT)
Southwest Airlines WN 1436 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-12-07 through 2025-12-14
Thu 17:25 Las Vegas Harry Reid (LAS) 1 18:40 Fresno (FAT)
Southwest Airlines WN 1436 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Operates only on 2025-12-18
Mon 17:25 Las Vegas Harry Reid (LAS) 1 18:40 Fresno (FAT)
Southwest Airlines WN 1436 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Operates only on 2026-01-05
Sat 17:30 Las Vegas Harry Reid (LAS) 1 18:45 Fresno (FAT)
Southwest Airlines WN 1436 Non-stop Boeing 737-800 (73H) 1:15 Effective 2025-11-08 through 2025-11-15
Sat 17:30 Las Vegas Harry Reid (LAS) 1 18:45 Fresno (FAT)
Southwest Airlines WN 1436 Non-stop Boeing 737-800 (73H) 1:15 Effective 2025-12-06 through 2025-12-13
Tue,Wed 09:20 Las Vegas Harry Reid (LAS) 1 10:35 Fresno (FAT)
Southwest Airlines WN 1437 Non-stop Boeing 737-700 (73W) 1:15 Valid until 2025-06-04
Mon,Thu,Fri 12:40 Las Vegas Harry Reid (LAS) 1 14:00 Fresno (FAT)
Southwest Airlines WN 1437 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Valid until 2025-06-02
Tue,Wed 08:15 Las Vegas Harry Reid (LAS) 1 09:40 Fresno (FAT)
Southwest Airlines WN 1538 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2025-10-07 through 2025-10-29
Mon,Thu,Fri 21:55 Las Vegas Harry Reid (LAS) 1 23:10 Fresno (FAT)
Southwest Airlines WN 1538 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-10-02 through 2025-10-31
Sat 09:50 Las Vegas Harry Reid (LAS) 1 11:05 Fresno (FAT)
Southwest Airlines WN 1955 Non-stop Boeing 737-800 (73H) 1:15 Valid until 2025-05-31
Sun 12:30 Las Vegas Harry Reid (LAS) 1 13:50 Fresno (FAT)
Southwest Airlines WN 1955 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2025-05-25
Sun 13:10 Las Vegas Harry Reid (LAS) 1 14:30 Fresno (FAT)
Southwest Airlines WN 1955 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Valid until 2025-05-18
Sun 13:10 Las Vegas Harry Reid (LAS) 1 14:30 Fresno (FAT)
Southwest Airlines WN 1955 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2025-06-01
Mon,Thu,Fri 09:00 Las Vegas Harry Reid (LAS) 1 10:20 Fresno (FAT)
Southwest Airlines WN 2055 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-08-07 through 2025-09-29
Mon,Thu,Fri 16:45 Las Vegas Harry Reid (LAS) 1 18:05 Fresno (FAT)
Southwest Airlines WN 2055 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 16:45 Las Vegas Harry Reid (LAS) 1 18:05 Fresno (FAT)
Southwest Airlines WN 2055 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-07-07 through 2025-08-04
Fri 13:25 Las Vegas Harry Reid (LAS) 1 14:45 Fresno (FAT)
Southwest Airlines WN 2261 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-07-04
1 2 3   next


Southwest Airlines flights from Las Vegas Harry Reid (LAS) to Fresno (FAT).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2025-08-09 through 2025-09-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2025-08-05 through 2025-10-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Operates only on 2025-08-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2025-06-10 through 2025-07-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-06-07 through 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Operates only on 2025-11-27
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-06-10 through 2025-07-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2025-06-07 through 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Operates only on 2025-11-27
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-04 through 2025-11-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-17 through 2025-11-20
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-02 through 2025-12-11
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-15 through 2025-12-17
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-24 through 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Valid until 2025-05-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Operates only on 2025-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Valid until 2025-06-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Operates only on 2025-05-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2025-06-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Operates only on 2025-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-06-07 through 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-10 through 2025-07-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-11-22 through 2025-11-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2025-12-01
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2025-12-19 through 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2025-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-21 through 2025-11-28
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-07 through 2025-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Operates only on 2025-12-18
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-08 through 2025-11-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Effective 2025-12-06 through 2025-12-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Valid until 2025-06-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Valid until 2025-06-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-10-07 through 2025-10-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-10-02 through 2025-10-31
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Valid until 2025-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Operates only on 2025-05-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2025-05-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Operates only on 2025-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)
Page 1 / 3        next
  • A domestic route departing from the Las Vegas Harry Reid airport (LAS) and arriving at Fresno airport (FAT).
  • The flight distance is 258 miles, or 415 km.
  • The timezone of both the departure and the arrival airports is UTC-8 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 1:10 and 1:25.