Southwest Airlines flights from William P. Hobby, Houston (HOU) to Albuquerque (ABQ).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Tue,Wed 08:35 William P. Hobby, Houston (HOU) 09:55 Albuquerque (ABQ)
Southwest Airlines WN 123 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-04-09 through 2024-05-29
Mon,Thu-Sat 08:45 William P. Hobby, Houston (HOU) 10:10 Albuquerque (ABQ)
Southwest Airlines WN 123 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-04-11 through 2024-06-03
Sun 08:45 William P. Hobby, Houston (HOU) 10:00 Albuquerque (ABQ)
Southwest Airlines WN 123 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Operates only on 2024-05-26
Sun 09:00 William P. Hobby, Houston (HOU) 10:15 Albuquerque (ABQ)
Southwest Airlines WN 123 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-04-14 through 2024-05-19
Sun 09:00 William P. Hobby, Houston (HOU) 10:15 Albuquerque (ABQ)
Southwest Airlines WN 123 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-06-02
Mon,Thu,Fri 14:40 William P. Hobby, Houston (HOU) 15:50 Albuquerque (ABQ)
Southwest Airlines WN 333 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-08-05 through 2024-09-30
Sun 14:40 William P. Hobby, Houston (HOU) 15:45 Albuquerque (ABQ)
Southwest Airlines WN 333 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2024-09-01
Sun 15:30 William P. Hobby, Houston (HOU) 16:35 Albuquerque (ABQ)
Southwest Airlines WN 333 Non-stop Boeing 737-700 (73W) 2:05 Effective 2024-08-11 through 2024-08-25
Sun 15:30 William P. Hobby, Houston (HOU) 16:35 Albuquerque (ABQ)
Southwest Airlines WN 333 Non-stop Boeing 737-700 (73W) 2:05 Effective 2024-09-08 through 2024-09-29
Sat 20:55 William P. Hobby, Houston (HOU) 22:20 Albuquerque (ABQ)
Southwest Airlines WN 399 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-04-13 through 2024-06-01
Tue,Wed 21:30 William P. Hobby, Houston (HOU) 22:55 Albuquerque (ABQ)
Southwest Airlines WN 399 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-04-09 through 2024-05-29
Fri 08:25 William P. Hobby, Houston (HOU) 09:40 Albuquerque (ABQ)
Southwest Airlines WN 429 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-07-05
Thu 16:45 William P. Hobby, Houston (HOU) 17:50 Albuquerque (ABQ)
Southwest Airlines WN 594 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2024-07-04
Mon,Sun 16:50 William P. Hobby, Houston (HOU) 18:00 Albuquerque (ABQ)
Southwest Airlines WN 681 Non-stop Boeing 737-700 (73W) 2:10 Valid until 2024-01-01
Wed-Fri,Sun 16:50 William P. Hobby, Houston (HOU) 18:00 Albuquerque (ABQ)
Southwest Airlines WN 681 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-01-03 through 2024-01-07
Sat 20:50 William P. Hobby, Houston (HOU) 22:05 Albuquerque (ABQ)
Southwest Airlines WN 924 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Operates only on 2024-01-06
Mon,Sun 21:50 William P. Hobby, Houston (HOU) 23:05 Albuquerque (ABQ)
Southwest Airlines WN 924 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Valid until 2024-01-01
Wed-Fri,Sun 21:50 William P. Hobby, Houston (HOU) 23:05 Albuquerque (ABQ)
Southwest Airlines WN 924 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-01-03 through 2024-01-07
Sun 08:45 William P. Hobby, Houston (HOU) 10:10 Albuquerque (ABQ)
Southwest Airlines WN 1197 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-01-14 through 2024-03-03
Tue,Wed 08:45 William P. Hobby, Houston (HOU) 10:05 Albuquerque (ABQ)
Southwest Airlines WN 1397 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-01-09 through 2024-03-06
Sun 21:40 William P. Hobby, Houston (HOU) 22:55 Albuquerque (ABQ)
Southwest Airlines WN 1525 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-01-14 through 2024-03-03
Tue,Wed 21:40 William P. Hobby, Houston (HOU) 23:00 Albuquerque (ABQ)
Southwest Airlines WN 1559 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-03-12 through 2024-04-03
Sat 22:15 William P. Hobby, Houston (HOU) 23:30 Albuquerque (ABQ)
Southwest Airlines WN 1559 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-03-09 through 2024-04-06
Mon,Sun 08:50 William P. Hobby, Houston (HOU) 10:00 Albuquerque (ABQ)
Southwest Airlines WN 1933 Non-stop Boeing 737-700 (73W) 2:10 Valid until 2024-01-01
Wed-Fri,Sun 08:50 William P. Hobby, Houston (HOU) 10:00 Albuquerque (ABQ)
Southwest Airlines WN 1933 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-01-03 through 2024-01-07
Sat 08:50 William P. Hobby, Houston (HOU) 10:10 Albuquerque (ABQ)
Southwest Airlines WN 1933 Non-stop Boeing 737-800 (738) 2:20 Operates only on 2024-01-06
Sat 08:00 William P. Hobby, Houston (HOU) 09:10 Albuquerque (ABQ)
Southwest Airlines WN 2052 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-06-08 through 2024-08-03
Sun 08:15 William P. Hobby, Houston (HOU) 09:30 Albuquerque (ABQ)
Southwest Airlines WN 2052 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-06-09 through 2024-08-04
Thu 08:20 William P. Hobby, Houston (HOU) 09:35 Albuquerque (ABQ)
Southwest Airlines WN 2052 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-07-04
Tue,Wed 08:30 William P. Hobby, Houston (HOU) 09:45 Albuquerque (ABQ)
Southwest Airlines WN 2052 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-06-04 through 2024-07-31
Mon,Thu,Fri 08:50 William P. Hobby, Houston (HOU) 10:05 Albuquerque (ABQ)
Southwest Airlines WN 2052 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-06-06 through 2024-07-01
Mon,Thu,Fri 08:50 William P. Hobby, Houston (HOU) 10:05 Albuquerque (ABQ)
Southwest Airlines WN 2052 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-07-08 through 2024-08-02
Fri 19:00 William P. Hobby, Houston (HOU) 20:10 Albuquerque (ABQ)
Southwest Airlines WN 2114 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-07-05
Tue,Wed 21:35 William P. Hobby, Houston (HOU) 22:50 Albuquerque (ABQ)
Southwest Airlines WN 2126 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-01-09 through 2024-03-06
Sun 08:25 William P. Hobby, Houston (HOU) 09:40 Albuquerque (ABQ)
Southwest Airlines WN 2177 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-08-11 through 2024-08-25
Sun 08:25 William P. Hobby, Houston (HOU) 09:40 Albuquerque (ABQ)
Southwest Airlines WN 2177 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-09-08 through 2024-09-29
Sat 08:30 William P. Hobby, Houston (HOU) 09:45 Albuquerque (ABQ)
Southwest Airlines WN 2177 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-08-10 through 2024-09-28
Mon,Thu,Fri 08:50 William P. Hobby, Houston (HOU) 10:10 Albuquerque (ABQ)
Southwest Airlines WN 2177 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-08-05 through 2024-09-30
Tue,Wed 09:00 William P. Hobby, Houston (HOU) 10:15 Albuquerque (ABQ)
Southwest Airlines WN 2177 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-08-06 through 2024-10-02
Sun 09:20 William P. Hobby, Houston (HOU) 10:35 Albuquerque (ABQ)
Southwest Airlines WN 2177 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-09-01
Sat 20:20 William P. Hobby, Houston (HOU) 21:35 Albuquerque (ABQ)
Southwest Airlines WN 2209 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-01-13 through 2024-03-02
Sun 15:25 William P. Hobby, Houston (HOU) 16:40 Albuquerque (ABQ)
Southwest Airlines WN 2386 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-04-14 through 2024-05-19
Sun 15:25 William P. Hobby, Houston (HOU) 16:40 Albuquerque (ABQ)
Southwest Airlines WN 2386 Non-stop Boeing 737-700 (73W) 2:15 Operates only on 2024-06-02
Tue,Wed 14:35 William P. Hobby, Houston (HOU) 15:50 Albuquerque (ABQ)
Southwest Airlines WN 2535 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-04-09 through 2024-05-29
Mon,Thu,Fri 15:10 William P. Hobby, Houston (HOU) 16:25 Albuquerque (ABQ)
Southwest Airlines WN 2535 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-04-11 through 2024-06-03
Sat 20:20 William P. Hobby, Houston (HOU) 21:35 Albuquerque (ABQ)
Southwest Airlines WN 2548 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-08-10 through 2024-09-28
Tue,Wed 21:05 William P. Hobby, Houston (HOU) 22:20 Albuquerque (ABQ)
Southwest Airlines WN 2548 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2024-08-06 through 2024-10-02
Sun 21:10 William P. Hobby, Houston (HOU) 22:25 Albuquerque (ABQ)
Southwest Airlines WN 2584 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Operates only on 2024-09-01
Sun 22:35 William P. Hobby, Houston (HOU) 23:45 Albuquerque (ABQ)
Southwest Airlines WN 2584 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-08-11 through 2024-08-25
Sun 22:35 William P. Hobby, Houston (HOU) 23:45 Albuquerque (ABQ)
Southwest Airlines WN 2584 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-09-08 through 2024-09-29
1 2   next


Southwest Airlines flights from William P. Hobby, Houston (HOU) to Albuquerque (ABQ).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2024-04-09 through 2024-05-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2024-04-11 through 2024-06-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Operates only on 2024-05-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-04-14 through 2024-05-19
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Operates only on 2024-06-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Effective 2024-08-05 through 2024-09-30
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Operates only on 2024-09-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-08-11 through 2024-08-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Effective 2024-09-08 through 2024-09-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Effective 2024-04-13 through 2024-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-04-09 through 2024-05-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-07-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Operates only on 2024-07-04
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Valid until 2024-01-01
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Effective 2024-01-03 through 2024-01-07
Mon
-
Tue
-
Wed
Thu
Fri
Sat
-
Sun
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Operates only on 2024-01-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2024-01-01
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-01-03 through 2024-01-07
Mon
-
Tue
-
Wed
Thu
Fri
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-01-14 through 2024-03-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Effective 2024-01-09 through 2024-03-06
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2024-01-14 through 2024-03-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Effective 2024-03-12 through 2024-04-03
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2024-03-09 through 2024-04-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2024-01-01
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Effective 2024-01-03 through 2024-01-07
Mon
-
Tue
-
Wed
Thu
Fri
Sat
-
Sun
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Operates only on 2024-01-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Boeing 737-800 (738)

Effective 2024-06-08 through 2024-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Effective 2024-06-09 through 2024-08-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Operates only on 2024-07-04
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Effective 2024-06-04 through 2024-07-31
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Effective 2024-06-06 through 2024-07-01
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-07-08 through 2024-08-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-07-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-01-09 through 2024-03-06
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Effective 2024-08-11 through 2024-08-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Effective 2024-09-08 through 2024-09-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Effective 2024-08-10 through 2024-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Effective 2024-08-05 through 2024-09-30
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Effective 2024-08-06 through 2024-10-02
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Operates only on 2024-09-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Effective 2024-01-13 through 2024-03-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

Effective 2024-04-14 through 2024-05-19
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Operates only on 2024-06-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Effective 2024-04-09 through 2024-05-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Effective 2024-04-11 through 2024-06-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Effective 2024-08-10 through 2024-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Effective 2024-08-06 through 2024-10-02
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-09-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-08-11 through 2024-08-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-09-08 through 2024-09-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:10, non-stop
Boeing 737-800 (73H)
Page 1 / 2        next
  • A domestic route departing from the William P. Hobby, Houston airport (HOU) and arriving at Albuquerque airport (ABQ).
  • The flight distance is 758 miles, or 1220 km.
  • The timezone of the departure airport is UTC-6 , and the timezone of the arrival airport is UTC-7 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 2:00 and 2:30.