Volaris flights from Guadalajara (GDL) to Fresno (FAT).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Daily 21:44 Guadalajara (GDL) 1 00:30 Fresno (FAT)
Volaris Y4 950 Non-stop Airbus A320neo (32N) 3:46 Effective 2023-03-12 through 2023-03-31
The flight arrives 1 day after departure.
Daily 22:42 Guadalajara (GDL) 1 00:28 Fresno (FAT)
Volaris Y4 950 Non-stop Airbus A320neo (32N) 3:46 Valid until 2023-01-31
The flight arrives 1 day after departure.
Daily 22:44 Guadalajara (GDL) 1 00:30 Fresno (FAT)
Volaris Y4 950 Non-stop Airbus A320neo (32N) 3:46 Effective 2023-02-01 through 2023-03-11
The flight arrives 1 day after departure.
Sat 22:55 Guadalajara (GDL) 1 01:30 Fresno (FAT)
Volaris Y4 950 Non-stop Airbus A320neo (32N) 3:35 Operates only on 2023-04-01
The flight arrives 1 day after departure.
Daily 22:55 Guadalajara (GDL) 1 00:30 Fresno (FAT)
Volaris Y4 950 Non-stop Airbus A320neo (32N) 2:35 Effective 2023-04-02 through 2023-10-28
The flight arrives 1 day after departure.
Mon,Tue,Sun 22:55 Guadalajara (GDL) 1 01:30 Fresno (FAT)
Volaris Y4 950 Non-stop Airbus A320neo (32N) 3:35 Effective from 2023-10-29
The flight arrives 1 day after departure.
Mon,Tue,Thu,Sat 00:12 Guadalajara (GDL) 1 01:58 Fresno (FAT)
Volaris Y4 952 Non-stop Airbus A320neo (32N) 3:46 Effective 2023-01-02 through 2023-01-14
Thu 00:12 Guadalajara (GDL) 1 01:58 Fresno (FAT)
Volaris Y4 952 Non-stop Airbus A320neo (32N) 3:46 Effective 2023-01-19 through 2023-01-26
Mon,Tue,Thu,Sat 00:14 Guadalajara (GDL) 1 02:00 Fresno (FAT)
Volaris Y4 952 Non-stop Airbus A320neo (32N) 3:46 Effective 2023-02-02 through 2023-03-11
Sat 00:25 Guadalajara (GDL) 1 03:00 Fresno (FAT)
Volaris Y4 952 Non-stop Airbus A320neo (32N) 3:35 Operates only on 2023-04-01
Mon,Tue,Thu,Sat 00:25 Guadalajara (GDL) 1 02:00 Fresno (FAT)
Volaris Y4 952 Non-stop Airbus A320neo (32N) 2:35 Effective 2023-04-03 through 2023-10-28
Mon,Tue 00:25 Guadalajara (GDL) 1 03:00 Fresno (FAT)
Volaris Y4 952 Non-stop Airbus A320neo (32N) 3:35 Effective from 2023-10-30
Mon,Wed,Fri,Sun 23:14 Guadalajara (GDL) 1 02:00 Fresno (FAT)
Volaris Y4 952 Non-stop Airbus A320neo (32N) 3:46 Effective 2023-03-13 through 2023-03-31
The flight arrives 1 day after departure.
Mon,Fri 23:57 Guadalajara (GDL) 1 01:43 Fresno (FAT)
Volaris Y4 952 Non-stop Airbus A320neo (32N) 3:46 Effective 2023-01-16 through 2023-01-30
The flight arrives 1 day after departure.
Mon 00:00 Guadalajara (GDL) 1 01:46 Fresno (FAT)
Volaris Y4 5952 Non-stop Airbus A320neo (32N) 3:46 Effective 2023-01-16 through 2023-01-30


Volaris flights from Guadalajara (GDL) to Fresno (FAT).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

21:44

00:30(+1)
Effective 2023-03-12 through 2023-03-31
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 3:46, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

22:42

00:28(+1)
Valid until 2023-01-31
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 3:46, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

22:44

00:30(+1)
Effective 2023-02-01 through 2023-03-11
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 3:46, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

22:55

01:30(+1)
Operates only on 2023-04-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

22:55

00:30(+1)
Effective 2023-04-02 through 2023-10-28
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 2:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

22:55

01:30(+1)
Effective from 2023-10-29
Mon
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

Effective 2023-01-02 through 2023-01-14
Mon
Tue
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 3:46, non-stop
Airbus A320neo (32N)

Effective 2023-01-19 through 2023-01-26
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 3:46, non-stop
Airbus A320neo (32N)

Effective 2023-02-02 through 2023-03-11
Mon
Tue
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 3:46, non-stop
Airbus A320neo (32N)

Operates only on 2023-04-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:35, non-stop
Airbus A320neo (32N)

Effective 2023-04-03 through 2023-10-28
Mon
Tue
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A320neo (32N)

Effective from 2023-10-30
Mon
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:35, non-stop
Airbus A320neo (32N)

23:14

02:00(+1)
Effective 2023-03-13 through 2023-03-31
Mon
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
Duration: 3:46, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:57

01:43(+1)
Effective 2023-01-16 through 2023-01-30
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 3:46, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

Effective 2023-01-16 through 2023-01-30
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:46, non-stop
Airbus A320neo (32N)
  • An international route departing from Guadalajara airport, Mexico (GDL) and arriving at Fresno airport, United States (FAT).
  • The flight distance is 1494 miles, or 2405 km.
  • The timezone of the departure airport is UTC-6 , and the timezone of the arrival airport is UTC-8 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 2:35 and 3:46.