All airlines flying from Sevilla (SVQ) to Tenerife-Norte (TFN).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sun 06:30 Sevilla (SVQ) 07:55 Tenerife-Norte (TFN)
Ryanair FR 1162 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2024-03-31
Thu 11:05 Sevilla (SVQ) 12:25 Tenerife-Norte (TFN)
Ryanair FR 1162 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2024-03-28
Thu 12:00 Sevilla (SVQ) 13:25 Tenerife-Norte (TFN)
Ryanair FR 1162 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2024-04-04
Sun 17:20 Sevilla (SVQ) 18:40 Tenerife-Norte (TFN)
Ryanair FR 1162 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2024-03-24
Tue 19:15 Sevilla (SVQ) 20:40 Tenerife-Norte (TFN)
Ryanair FR 1162 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2024-04-02
Wed 20:30 Sevilla (SVQ) 21:50 Tenerife-Norte (TFN)
Vueling Airlines VY 3250 Non-stop Airbus A320 (32A) 2:20 Effective 2024-04-03 through 2024-10-30
Mon,Tue,Fri-Sun 06:45 Sevilla (SVQ) 08:05 Tenerife-Norte (TFN)
Vueling Airlines VY 3254 Non-stop Airbus A320 (320) 2:20 Valid until 2024-01-13
Mon,Tue,Fri 06:45 Sevilla (SVQ) 08:05 Tenerife-Norte (TFN)
Vueling Airlines VY 3254 Non-stop Airbus A320 (320) 2:20 Effective 2024-01-15 through 2024-01-26
Mon,Tue,Fri-Sun 06:45 Sevilla (SVQ) 08:05 Tenerife-Norte (TFN)
Vueling Airlines VY 3254 Non-stop Airbus A320 (320) 2:20 Effective 2024-01-28 through 2024-03-30
Mon,Fri,Sun 06:50 Sevilla (SVQ) 08:15 Tenerife-Norte (TFN)
Vueling Airlines VY 3254 Non-stop Airbus A320 (320) 2:25 Effective from 2024-03-31
Sat 11:20 Sevilla (SVQ) 12:40 Tenerife-Norte (TFN)
Vueling Airlines VY 3254 Non-stop Airbus A320 (32A) 2:20 Effective 2024-04-06 through 2024-06-15
Sat 11:20 Sevilla (SVQ) 12:40 Tenerife-Norte (TFN)
Vueling Airlines VY 3254 Non-stop Airbus A320 (32A) 2:20 Effective from 2024-09-14
Sat 11:25 Sevilla (SVQ) 12:40 Tenerife-Norte (TFN)
Vueling Airlines VY 3254 Non-stop Airbus A320 (32A) 2:15 Effective 2024-01-20 through 2024-01-27
Thu 11:45 Sevilla (SVQ) 13:05 Tenerife-Norte (TFN)
Vueling Airlines VY 3254 Non-stop Airbus A320 (32A) 2:20 Effective from 2024-04-04
Sat 14:55 Sevilla (SVQ) 16:15 Tenerife-Norte (TFN)
Vueling Airlines VY 3254 Non-stop Airbus A320 (32A) 2:20 Effective 2024-06-22 through 2024-09-07
Tue 17:45 Sevilla (SVQ) 19:05 Tenerife-Norte (TFN)
Vueling Airlines VY 3254 Non-stop Airbus A320 (320) 2:20 Effective from 2024-04-02
Thu 06:45 Sevilla (SVQ) 08:05 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:20 Valid until 2024-03-28
Wed 08:35 Sevilla (SVQ) 09:55 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:20 Valid until 2024-03-27
Wed 11:25 Sevilla (SVQ) 12:45 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:20 Effective 2024-04-03 through 2024-10-30
Sun 11:35 Sevilla (SVQ) 12:50 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:15 Valid until 2024-03-24
Sat 12:05 Sevilla (SVQ) 13:20 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:15 Operates only on 2024-01-06
Tue,Thu,Sun 12:20 Sevilla (SVQ) 13:40 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:20 Effective from 2024-03-31
Mon,Fri 12:35 Sevilla (SVQ) 13:50 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:15 Valid until 2024-01-08
Mon 12:35 Sevilla (SVQ) 13:50 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:15 Effective 2024-01-15 through 2024-01-22
Mon,Fri 12:35 Sevilla (SVQ) 13:50 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:15 Effective 2024-01-26 through 2024-03-29
Sat 13:15 Sevilla (SVQ) 14:30 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:15 Effective 2024-01-13 through 2024-03-30
Sat 13:55 Sevilla (SVQ) 15:15 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:20 Effective from 2024-04-06
Fri 14:10 Sevilla (SVQ) 15:30 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:20 Effective from 2024-04-05
Mon 18:25 Sevilla (SVQ) 19:45 Tenerife-Norte (TFN)
Vueling Airlines VY 3256 Non-stop Airbus A320 (320) 2:20 Effective from 2024-04-01
Fri 11:10 Sevilla (SVQ) 12:30 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (32A) 2:20 Effective from 2024-04-05
Mon 11:30 Sevilla (SVQ) 12:50 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (320) 2:20 Effective from 2024-04-01
Fri 17:40 Sevilla (SVQ) 18:55 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (320) 2:15 Valid until 2024-03-29
Sun 18:10 Sevilla (SVQ) 19:30 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (320) 2:20 Effective from 2024-03-31
Sat 18:20 Sevilla (SVQ) 19:40 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (320) 2:20 Effective from 2024-04-06
Tue 18:25 Sevilla (SVQ) 19:45 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (320) 2:20 Effective 2024-06-25 through 2024-09-03
Tue 18:30 Sevilla (SVQ) 19:45 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (320) 2:15 Valid until 2024-03-26
Sun 20:15 Sevilla (SVQ) 21:30 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (32A) 2:15 Valid until 2024-03-24
Tue 20:25 Sevilla (SVQ) 21:45 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (32A) 2:20 Effective 2024-04-02 through 2024-06-18
Tue 20:25 Sevilla (SVQ) 21:45 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (32A) 2:20 Effective from 2024-09-10
Wed,Thu 20:30 Sevilla (SVQ) 21:45 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (32A) 2:15 Valid until 2024-03-28
Thu 20:50 Sevilla (SVQ) 22:10 Tenerife-Norte (TFN)
Vueling Airlines VY 3258 Non-stop Airbus A320 (32A) 2:20 Effective from 2024-04-04
Direct Codeshare Flights:
Mon,Tue,Fri-Sun 06:45 Sevilla (SVQ) 08:05 Tenerife-Norte (TFN)
Iberia IB 5263 Non-stop Airbus A320 (320) 2:20 Valid until 2024-01-13
Codeshare flight, operated by Vueling Airlines.(VY 3254)
Mon,Tue,Fri 06:45 Sevilla (SVQ) 08:05 Tenerife-Norte (TFN)
Iberia IB 5263 Non-stop Airbus A320 (320) 2:20 Effective 2024-01-15 through 2024-01-26
Codeshare flight, operated by Vueling Airlines.(VY 3254)
Mon,Tue,Fri-Sun 06:45 Sevilla (SVQ) 08:05 Tenerife-Norte (TFN)
Iberia IB 5263 Non-stop Airbus A320 (320) 2:20 Effective 2024-01-28 through 2024-03-30
Codeshare flight, operated by Vueling Airlines.(VY 3254)
Sat 11:25 Sevilla (SVQ) 12:40 Tenerife-Norte (TFN)
Iberia IB 5263 Non-stop Airbus A320 (320) 2:15 Effective 2024-01-20 through 2024-01-27
Codeshare flight, operated by Vueling Airlines.(VY 3254)
Thu 06:45 Sevilla (SVQ) 08:05 Tenerife-Norte (TFN)
Iberia IB 5265 Non-stop Airbus A320 (320) 2:20 Valid until 2024-03-28
Codeshare flight, operated by Vueling Airlines.(VY 3256)
Wed 08:35 Sevilla (SVQ) 09:55 Tenerife-Norte (TFN)
Iberia IB 5265 Non-stop Airbus A320 (320) 2:20 Valid until 2024-03-27
Codeshare flight, operated by Vueling Airlines.(VY 3256)
Sun 11:35 Sevilla (SVQ) 12:50 Tenerife-Norte (TFN)
Iberia IB 5265 Non-stop Airbus A320 (320) 2:15 Valid until 2024-03-24
Codeshare flight, operated by Vueling Airlines.(VY 3256)
Sat 12:05 Sevilla (SVQ) 13:20 Tenerife-Norte (TFN)
Iberia IB 5265 Non-stop Airbus A320 (320) 2:15 Operates only on 2024-01-06
Codeshare flight, operated by Vueling Airlines.(VY 3256)
Mon,Fri 12:35 Sevilla (SVQ) 13:50 Tenerife-Norte (TFN)
Iberia IB 5265 Non-stop Airbus A320 (320) 2:15 Valid until 2024-01-08
Codeshare flight, operated by Vueling Airlines.(VY 3256)
1 2   next


All airlines flying from Sevilla (SVQ) to Tenerife-Norte (TFN).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective from 2024-03-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Valid until 2024-03-28
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective from 2024-04-04
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Valid until 2024-03-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective from 2024-04-02
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-04-03 through 2024-10-30
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (32A)

Valid until 2024-01-13
Mon
Tue
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-01-15 through 2024-01-26
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-01-28 through 2024-03-30
Mon
Tue
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 2:20, non-stop
Airbus A320 (320)

Effective from 2024-03-31
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 2:25, non-stop
Airbus A320 (320)

Effective 2024-04-06 through 2024-06-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Airbus A320 (32A)

Effective from 2024-09-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Airbus A320 (32A)

Effective 2024-01-20 through 2024-01-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:15, non-stop
Airbus A320 (32A)

Effective from 2024-04-04
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (32A)

Effective 2024-06-22 through 2024-09-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Airbus A320 (32A)

Effective from 2024-04-02
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Valid until 2024-03-28
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Valid until 2024-03-27
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-04-03 through 2024-10-30
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Valid until 2024-03-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Airbus A320 (320)

Operates only on 2024-01-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:15, non-stop
Airbus A320 (320)

Effective from 2024-03-31
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Airbus A320 (320)

Valid until 2024-01-08
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Airbus A320 (320)

Effective 2024-01-15 through 2024-01-22
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Airbus A320 (320)

Effective 2024-01-26 through 2024-03-29
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Airbus A320 (320)

Effective 2024-01-13 through 2024-03-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:15, non-stop
Airbus A320 (320)

Effective from 2024-04-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective from 2024-04-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective from 2024-04-01
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective from 2024-04-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (32A)

Effective from 2024-04-01
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Valid until 2024-03-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:15, non-stop
Airbus A320 (320)

Effective from 2024-03-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Airbus A320 (320)

Effective from 2024-04-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-06-25 through 2024-09-03
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Valid until 2024-03-26
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Airbus A320 (320)

Valid until 2024-03-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Airbus A320 (32A)

Effective 2024-04-02 through 2024-06-18
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (32A)

Effective from 2024-09-10
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (32A)

Valid until 2024-03-28
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:15, non-stop
Airbus A320 (32A)

Effective from 2024-04-04
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (32A)

Direct Codeshare Flights:

Valid until 2024-01-13
Mon
Tue
Wed
-
Thu
-
Fri
Sat
Sun
Codeshare flight, operated by Vueling Airlines. (VY 3254)
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-01-15 through 2024-01-26
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Vueling Airlines. (VY 3254)
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-01-28 through 2024-03-30
Mon
Tue
Wed
-
Thu
-
Fri
Sat
Sun
Codeshare flight, operated by Vueling Airlines. (VY 3254)
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-01-20 through 2024-01-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Vueling Airlines. (VY 3254)
Duration: 2:15, non-stop
Airbus A320 (320)

Valid until 2024-03-28
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Vueling Airlines. (VY 3256)
Duration: 2:20, non-stop
Airbus A320 (320)

Valid until 2024-03-27
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Vueling Airlines. (VY 3256)
Duration: 2:20, non-stop
Airbus A320 (320)

Valid until 2024-03-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Vueling Airlines. (VY 3256)
Duration: 2:15, non-stop
Airbus A320 (320)

Operates only on 2024-01-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Vueling Airlines. (VY 3256)
Duration: 2:15, non-stop
Airbus A320 (320)

Valid until 2024-01-08
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Vueling Airlines. (VY 3256)
Duration: 2:15, non-stop
Airbus A320 (320)
Page 1 / 2        next
  • A domestic route departing from the Sevilla airport (SVQ) and arriving at Tenerife-Norte airport (TFN).
  • The flight distance is 863 miles, or 1389 km.
  • The timezone of the departure airport is UTC+1 , and the timezone of the arrival airport is UTC+0 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 2:15 and 2:25.