Southwest Airlines flights from Midway, Chicago (MDW) to Denver (DEN).

Select flight date:
FLIGHT SCHEDULE
Non-Direct Flights:
Mon,Thu,Fri 15:05 Midway, Chicago (MDW) 19:05 Denver (DEN)
Southwest Airlines WN 2906 1-stop Boeing 737-800 (73H) 5:00 Valid until 2025-06-02
Sat 08:30 Midway, Chicago (MDW) 12:30 Denver (DEN)
Southwest Airlines WN 2908 1-stop Boeing 737-700 (Scimitar Winglets) 5:00 Effective 2025-10-04 through 2025-11-01
Tue,Wed 08:30 Midway, Chicago (MDW) 12:20 Denver (DEN)
Southwest Airlines WN 2976 1-stop Boeing 737 MAX 8 (7M8) 4:50 Effective 2025-08-05 through 2025-10-01
Sun 07:35 Midway, Chicago (MDW) 10:30 Denver (DEN)
Southwest Airlines WN 3061 1-stop Boeing 737-700 (Scimitar Winglets) 3:55 Operates only on 2025-11-30
Mon,Thu,Fri 07:50 Midway, Chicago (MDW) 10:45 Denver (DEN)
Southwest Airlines WN 3088 1-stop Boeing 737-800 (73H) 3:55 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 07:50 Midway, Chicago (MDW) 10:45 Denver (DEN)
Southwest Airlines WN 3088 1-stop Boeing 737-800 (73H) 3:55 Effective 2025-07-07 through 2025-08-04
Sat 11:00 Midway, Chicago (MDW) 13:50 Denver (DEN)
Southwest Airlines WN 3088 1-stop Boeing 737-800 (73H) 3:50 Effective 2025-06-07 through 2025-08-02
Sun 11:05 Midway, Chicago (MDW) 13:45 Denver (DEN)
Southwest Airlines WN 3088 1-stop Boeing 737-700 (73W) 3:40 Effective 2025-06-08 through 2025-08-03
Sun 18:35 Midway, Chicago (MDW) 21:55 Denver (DEN)
Southwest Airlines WN 3282 1-stop Boeing 737-800 (73H) 4:20 Effective 2025-10-05 through 2025-10-26
Sun 10:05 Midway, Chicago (MDW) 13:40 Denver (DEN)
Southwest Airlines WN 3428 1-stop Boeing 737 MAX 8 (7M8) 4:35 Valid until 2025-05-18
Sun 10:05 Midway, Chicago (MDW) 13:40 Denver (DEN)
Southwest Airlines WN 3428 1-stop Boeing 737 MAX 8 (7M8) 4:35 Operates only on 2025-06-01
Mon,Thu,Fri,Sun 14:40 Midway, Chicago (MDW) 18:25 Denver (DEN)
Southwest Airlines WN 3530 1-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2025-11-02 through 2025-11-16
Mon,Fri,Sun 14:40 Midway, Chicago (MDW) 18:25 Denver (DEN)
Southwest Airlines WN 3530 1-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2025-11-21 through 2025-11-28
Fri,Sun 14:40 Midway, Chicago (MDW) 18:25 Denver (DEN)
Southwest Airlines WN 3530 1-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2025-12-07 through 2025-12-14
Thu 14:40 Midway, Chicago (MDW) 18:25 Denver (DEN)
Southwest Airlines WN 3530 1-stop Boeing 737 MAX 8 (7M8) 4:45 Operates only on 2025-12-18
Mon 14:40 Midway, Chicago (MDW) 18:25 Denver (DEN)
Southwest Airlines WN 3530 1-stop Boeing 737 MAX 8 (7M8) 4:45 Operates only on 2026-01-05
Sun 09:15 Midway, Chicago (MDW) 13:05 Denver (DEN)
Southwest Airlines WN 3568 1-stop Boeing 737-800 (73H) 4:50 Operates only on 2025-08-31
Sun 15:50 Midway, Chicago (MDW) 19:50 Denver (DEN)
Southwest Airlines WN 3719 1-stop Boeing 737-800 (73H) 5:00 Effective 2025-06-08 through 2025-08-03
Sun 07:40 Midway, Chicago (MDW) 10:45 Denver (DEN)
Southwest Airlines WN 3740 1-stop Boeing 737-700 (Scimitar Winglets) 4:05 Operates only on 2025-11-30
Mon,Thu,Fri,Sun 14:25 Midway, Chicago (MDW) 17:35 Denver (DEN)
Southwest Airlines WN 3740 1-stop Boeing 737-700 (Scimitar Winglets) 4:10 Effective 2025-11-02 through 2025-11-16
Mon,Fri,Sun 14:25 Midway, Chicago (MDW) 17:35 Denver (DEN)
Southwest Airlines WN 3740 1-stop Boeing 737-700 (Scimitar Winglets) 4:10 Effective 2025-11-21 through 2025-11-28
Fri,Sun 14:25 Midway, Chicago (MDW) 17:35 Denver (DEN)
Southwest Airlines WN 3740 1-stop Boeing 737-700 (Scimitar Winglets) 4:10 Effective 2025-12-07 through 2025-12-14
Thu 14:25 Midway, Chicago (MDW) 17:35 Denver (DEN)
Southwest Airlines WN 3740 1-stop Boeing 737-700 (Scimitar Winglets) 4:10 Operates only on 2025-12-18
Mon 14:25 Midway, Chicago (MDW) 17:35 Denver (DEN)
Southwest Airlines WN 3740 1-stop Boeing 737-700 (Scimitar Winglets) 4:10 Operates only on 2026-01-05
Mon,Thu,Fri 07:45 Midway, Chicago (MDW) 11:00 Denver (DEN)
Southwest Airlines WN 3826 1-stop Boeing 737-700 (73W) 4:15 Effective 2025-08-07 through 2025-09-29
Sun 09:00 Midway, Chicago (MDW) 12:10 Denver (DEN)
Southwest Airlines WN 3826 1-stop Boeing 737-700 (73W) 4:10 Effective 2025-08-10 through 2025-08-24
Sun 09:00 Midway, Chicago (MDW) 12:10 Denver (DEN)
Southwest Airlines WN 3826 1-stop Boeing 737-700 (73W) 4:10 Effective 2025-09-07 through 2025-09-28
Sun 18:15 Midway, Chicago (MDW) 21:50 Denver (DEN)
Southwest Airlines WN 3948 1-stop Boeing 737-700 (Scimitar Winglets) 4:35 Operates only on 2025-11-30
Mon,Thu,Fri 18:55 Midway, Chicago (MDW) 21:40 Denver (DEN)
Southwest Airlines WN 4670 1-stop Boeing 737-700 (Scimitar Winglets) 3:45 Effective 2025-10-02 through 2025-10-31
Mon,Thu,Fri 11:35 Midway, Chicago (MDW) 18:55 Denver (DEN)
Southwest Airlines WN 444 2-stop Boeing 737-700 (73W) 8:20 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 11:35 Midway, Chicago (MDW) 18:55 Denver (DEN)
Southwest Airlines WN 444 2-stop Boeing 737-700 (73W) 8:20 Effective 2025-07-07 through 2025-08-04
Mon-Wed 13:50 Midway, Chicago (MDW) 19:20 Denver (DEN)
Southwest Airlines WN 2993 2-stop Boeing 737-700 (Scimitar Winglets) 6:30 Effective 2025-11-25 through 2025-12-01
Mon,Tue,Fri,Sun 13:50 Midway, Chicago (MDW) 19:20 Denver (DEN)
Southwest Airlines WN 2993 2-stop Boeing 737-700 (Scimitar Winglets) 6:30 Effective 2025-12-19 through 2026-01-04
Sat 08:05 Midway, Chicago (MDW) 17:00 Denver (DEN)
Southwest Airlines WN 3175 2-stop Boeing 737 MAX 8 (7M8) 9:55 Valid until 2025-05-31
Sun 10:05 Midway, Chicago (MDW) 18:45 Denver (DEN)
Southwest Airlines WN 2405 3-stop Boeing 737-700 (73W) 9:40 Effective 2025-08-10 through 2025-08-24
Sun 10:05 Midway, Chicago (MDW) 18:45 Denver (DEN)
Southwest Airlines WN 2405 3-stop Boeing 737-700 (73W) 9:40 Effective 2025-09-07 through 2025-09-28
Sun 09:10 Midway, Chicago (MDW) 21:50 Denver (DEN)
Southwest Airlines WN 4762 4-stop Boeing 737-700 (73W) 13:40 Operates only on 2025-05-25
prev   1 2 3 ... 5 6 7 8


Southwest Airlines flights from Midway, Chicago (MDW) to Denver (DEN).
Select flight date:
FLIGHT SCHEDULE
Non-Direct Flights:

Valid until 2025-06-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:00, 1-stop
Boeing 737-800 (73H)

Effective 2025-10-04 through 2025-11-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:00, 1-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-08-05 through 2025-10-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:50, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:55, 1-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:55, 1-stop
Boeing 737-800 (73H)

Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:55, 1-stop
Boeing 737-800 (73H)

Effective 2025-06-07 through 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:50, 1-stop
Boeing 737-800 (73H)

Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:40, 1-stop
Boeing 737-700 (73W)

Effective 2025-10-05 through 2025-10-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:20, 1-stop
Boeing 737-800 (73H)

Valid until 2025-05-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:35, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:35, 1-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-21 through 2025-11-28
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-12-07 through 2025-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-12-18
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-08-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:50, 1-stop
Boeing 737-800 (73H)

Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:00, 1-stop
Boeing 737-800 (73H)

Operates only on 2025-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:05, 1-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 4:10, 1-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-21 through 2025-11-28
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:10, 1-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-07 through 2025-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:10, 1-stop
Boeing 737-700 (Scimitar Winglets)

Operates only on 2025-12-18
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:10, 1-stop
Boeing 737-700 (Scimitar Winglets)

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:10, 1-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:15, 1-stop
Boeing 737-700 (73W)

Effective 2025-08-10 through 2025-08-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Effective 2025-09-07 through 2025-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:10, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:35, 1-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-10-02 through 2025-10-31
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:45, 1-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 8:20, 2-stop
Boeing 737-700 (73W)

Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 8:20, 2-stop
Boeing 737-700 (73W)

Effective 2025-11-25 through 2025-12-01
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:30, 2-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-19 through 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 6:30, 2-stop
Boeing 737-700 (Scimitar Winglets)

Valid until 2025-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 9:55, 2-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-08-10 through 2025-08-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 9:40, 3-stop
Boeing 737-700 (73W)

Effective 2025-09-07 through 2025-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 9:40, 3-stop
Boeing 737-700 (73W)

Operates only on 2025-05-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 13:40, 4-stop
Boeing 737-700 (73W)
prev        Page 8 / 8
  • A domestic route departing from the Midway, Chicago airport (MDW) and arriving at Denver airport (DEN).
  • The flight distance is 893 miles, or 1436 km.
  • The timezone of the departure airport is UTC-6 , and the timezone of the arrival airport is UTC-7 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 2:30 and 2:50.