Southwest Airlines flights from Orlando (MCO) to Denver (DEN).

Select flight date:
FLIGHT SCHEDULE
Non-Direct Flights:
Tue-Fri,Sun 13:35 Orlando (MCO) 17:20 Denver (DEN)
Southwest Airlines WN 2710 1-stop Boeing 737-700 (73W) 5:45 Effective 2025-01-19 through 2025-01-24
Mon-Fri 13:35 Orlando (MCO) 17:20 Denver (DEN)
Southwest Airlines WN 2710 1-stop Boeing 737-700 (73W) 5:45 Effective 2025-01-27 through 2025-02-05
Tue,Wed,Sun 13:35 Orlando (MCO) 17:20 Denver (DEN)
Southwest Airlines WN 2710 1-stop Boeing 737-700 (73W) 5:45 Effective 2025-02-09 through 2025-02-12
Tue,Wed 13:35 Orlando (MCO) 17:20 Denver (DEN)
Southwest Airlines WN 2710 1-stop Boeing 737-700 (73W) 5:45 Effective 2025-02-19 through 2025-03-05
Mon,Thu,Fri 17:15 Orlando (MCO) 21:40 Denver (DEN)
Southwest Airlines WN 2842 1-stop Boeing 737-700 (73W) 6:25 Effective 2024-10-03 through 2024-10-28
Fri 17:15 Orlando (MCO) 21:40 Denver (DEN)
Southwest Airlines WN 2842 1-stop Boeing 737-700 (73W) 6:25 Operates only on 2024-11-01
Mon,Thu,Fri,Sun 08:35 Orlando (MCO) 14:10 Denver (DEN)
Southwest Airlines WN 2959 1-stop Boeing 737-800 (73H) 7:35 Effective 2025-02-13 through 2025-02-17
Thu,Fri,Sun 08:35 Orlando (MCO) 14:10 Denver (DEN)
Southwest Airlines WN 2959 1-stop Boeing 737-800 (73H) 7:35 Effective 2025-02-21 through 2025-03-02
Thu,Fri,Sun 14:55 Orlando (MCO) 18:35 Denver (DEN)
Southwest Airlines WN 3029 1-stop Boeing 737-800 (73H) 5:40 Effective 2024-11-03 through 2024-11-10
Mon,Thu,Fri,Sun 14:55 Orlando (MCO) 18:35 Denver (DEN)
Southwest Airlines WN 3029 1-stop Boeing 737-800 (73H) 5:40 Effective 2024-11-11 through 2024-11-25
Fri,Sun 14:55 Orlando (MCO) 18:35 Denver (DEN)
Southwest Airlines WN 3029 1-stop Boeing 737-800 (73H) 5:40 Effective 2024-12-08 through 2024-12-15
Thu 14:55 Orlando (MCO) 18:35 Denver (DEN)
Southwest Airlines WN 3029 1-stop Boeing 737-800 (73H) 5:40 Operates only on 2024-12-19
Fri 14:55 Orlando (MCO) 18:35 Denver (DEN)
Southwest Airlines WN 3029 1-stop Boeing 737-800 (73H) 5:40 Operates only on 2025-01-03
Thu,Fri,Sun 07:20 Orlando (MCO) 10:50 Denver (DEN)
Southwest Airlines WN 3133 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-11-03 through 2024-11-10
Mon,Thu,Fri,Sun 07:20 Orlando (MCO) 10:50 Denver (DEN)
Southwest Airlines WN 3133 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-11-11 through 2024-11-25
Fri,Sun 07:20 Orlando (MCO) 10:50 Denver (DEN)
Southwest Airlines WN 3133 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-12-08 through 2024-12-15
Thu 07:20 Orlando (MCO) 10:50 Denver (DEN)
Southwest Airlines WN 3133 1-stop Boeing 737-700 (73W) 5:30 Operates only on 2024-12-19
Fri 07:20 Orlando (MCO) 10:50 Denver (DEN)
Southwest Airlines WN 3133 1-stop Boeing 737-700 (73W) 5:30 Operates only on 2025-01-03
Mon,Thu,Fri,Sun 12:50 Orlando (MCO) 18:45 Denver (DEN)
Southwest Airlines WN 3186 1-stop Boeing 737-800 (73H) 7:55 Effective 2025-02-13 through 2025-02-17
Thu,Fri,Sun 12:50 Orlando (MCO) 18:45 Denver (DEN)
Southwest Airlines WN 3186 1-stop Boeing 737-800 (73H) 7:55 Effective 2025-02-21 through 2025-03-02
Mon,Thu,Fri 13:00 Orlando (MCO) 18:50 Denver (DEN)
Southwest Airlines WN 3188 1-stop Boeing 737-800 (73H) 7:50 Effective 2024-10-03 through 2024-10-28
Fri 13:00 Orlando (MCO) 18:50 Denver (DEN)
Southwest Airlines WN 3188 1-stop Boeing 737-800 (73H) 7:50 Operates only on 2024-11-01
Mon,Thu,Fri 10:45 Orlando (MCO) 13:40 Denver (DEN)
Southwest Airlines WN 3234 1-stop Boeing 737-700 (73W) 4:55 Valid until 2024-09-30
Mon,Thu,Fri,Sun 10:10 Orlando (MCO) 15:00 Denver (DEN)
Southwest Airlines WN 3282 1-stop Boeing 737-700 (73W) 6:50 Effective 2025-02-13 through 2025-02-17
Thu,Fri,Sun 10:10 Orlando (MCO) 15:00 Denver (DEN)
Southwest Airlines WN 3282 1-stop Boeing 737-700 (73W) 6:50 Effective 2025-02-21 through 2025-03-02
Mon,Thu,Fri,Sun 17:55 Orlando (MCO) 21:40 Denver (DEN)
Southwest Airlines WN 3343 1-stop Boeing 737-700 (73W) 5:45 Effective 2025-02-13 through 2025-02-17
Thu,Fri,Sun 17:55 Orlando (MCO) 21:40 Denver (DEN)
Southwest Airlines WN 3343 1-stop Boeing 737-700 (73W) 5:45 Effective 2025-02-21 through 2025-03-02
Sun 17:55 Orlando (MCO) 22:00 Denver (DEN)
Southwest Airlines WN 3492 1-stop Boeing 737-700 (73W) 6:05 Operates only on 2024-12-01
Sat 14:00 Orlando (MCO) 17:55 Denver (DEN)
Southwest Airlines WN 3544 1-stop Boeing 737-700 (73W) 5:55 Effective 2024-11-23 through 2024-11-30
Sat 14:00 Orlando (MCO) 17:55 Denver (DEN)
Southwest Airlines WN 3544 1-stop Boeing 737-700 (73W) 5:55 Effective 2024-12-21 through 2025-01-04
Mon,Thu,Fri 10:05 Orlando (MCO) 15:20 Denver (DEN)
Southwest Airlines WN 3650 1-stop Boeing 737-800 (73H) 7:15 Effective 2024-10-03 through 2024-10-28
Mon,Thu,Fri,Sun 08:45 Orlando (MCO) 14:50 Denver (DEN)
Southwest Airlines WN 3719 1-stop Boeing 737 MAX 8 (7M8) 8:05 Effective 2025-02-13 through 2025-02-17
Thu,Fri,Sun 08:45 Orlando (MCO) 14:50 Denver (DEN)
Southwest Airlines WN 3719 1-stop Boeing 737 MAX 8 (7M8) 8:05 Effective 2025-02-21 through 2025-03-02
Sun 16:00 Orlando (MCO) 19:30 Denver (DEN)
Southwest Airlines WN 3813 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-09-08 through 2024-09-15
Sun 16:00 Orlando (MCO) 19:30 Denver (DEN)
Southwest Airlines WN 3813 1-stop Boeing 737-700 (73W) 5:30 Operates only on 2024-09-29
Sun 16:05 Orlando (MCO) 19:35 Denver (DEN)
Southwest Airlines WN 3813 1-stop Boeing 737-700 (73W) 5:30 Operates only on 2024-09-22
Sat 07:35 Orlando (MCO) 13:20 Denver (DEN)
Southwest Airlines WN 4017 1-stop Boeing 737 MAX 8 (7M8) 7:45 Effective 2025-02-15 through 2025-03-01
Sun 13:25 Orlando (MCO) 17:25 Denver (DEN)
Southwest Airlines WN 4133 1-stop Boeing 737-800 (73H) 6:00 Operates only on 2024-12-01
Mon-Wed 07:45 Orlando (MCO) 11:40 Denver (DEN)
Southwest Airlines WN 4155 1-stop Boeing 737-800 (73H) 5:55 Effective 2024-11-26 through 2024-12-02
Mon,Thu,Fri,Sun 07:45 Orlando (MCO) 11:40 Denver (DEN)
Southwest Airlines WN 4155 1-stop Boeing 737-800 (73H) 5:55 Effective 2024-12-20 through 2025-01-02
Sun 07:45 Orlando (MCO) 11:40 Denver (DEN)
Southwest Airlines WN 4155 1-stop Boeing 737-800 (73H) 5:55 Operates only on 2025-01-05
Mon,Thu,Fri 10:05 Orlando (MCO) 15:40 Denver (DEN)
Southwest Airlines WN 4600 1-stop Boeing 737-800 (73H) 7:35 Valid until 2024-09-30
Mon,Thu,Fri 12:15 Orlando (MCO) 18:00 Denver (DEN)
Southwest Airlines WN 4737 1-stop Boeing 737-800 (73H) 7:45 Valid until 2024-09-30
Thu,Fri,Sun 09:15 Orlando (MCO) 14:05 Denver (DEN)
Southwest Airlines WN 4820 1-stop Boeing 737 MAX 8 (7M8) 6:50 Effective 2024-11-03 through 2024-11-10
Mon,Thu,Fri,Sun 09:15 Orlando (MCO) 14:05 Denver (DEN)
Southwest Airlines WN 4820 1-stop Boeing 737 MAX 8 (7M8) 6:50 Effective 2024-11-11 through 2024-11-25
Fri,Sun 09:15 Orlando (MCO) 14:05 Denver (DEN)
Southwest Airlines WN 4820 1-stop Boeing 737 MAX 8 (7M8) 6:50 Effective 2024-12-08 through 2024-12-15
Thu 09:15 Orlando (MCO) 14:05 Denver (DEN)
Southwest Airlines WN 4820 1-stop Boeing 737 MAX 8 (7M8) 6:50 Operates only on 2024-12-19
Fri 09:15 Orlando (MCO) 14:05 Denver (DEN)
Southwest Airlines WN 4820 1-stop Boeing 737 MAX 8 (7M8) 6:50 Operates only on 2025-01-03
Sun 10:40 Orlando (MCO) 15:00 Denver (DEN)
Southwest Airlines WN 4910 1-stop Boeing 737 MAX 8 (7M8) 6:20 Operates only on 2024-12-01
Sun 15:50 Orlando (MCO) 21:55 Denver (DEN)
Southwest Airlines WN 636 2-stop Boeing 737 MAX 8 (7M8) 8:05 Operates only on 2024-12-01
prev   1 2 3 4 5 6 7 8   next


Southwest Airlines flights from Orlando (MCO) to Denver (DEN).
Select flight date:
FLIGHT SCHEDULE
Non-Direct Flights:

Effective 2025-01-19 through 2025-01-24
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
Duration: 5:45, 1-stop
Boeing 737-700 (73W)

Effective 2025-01-27 through 2025-02-05
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 5:45, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-09 through 2025-02-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:45, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-19 through 2025-03-05
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:45, 1-stop
Boeing 737-700 (73W)

Effective 2024-10-03 through 2024-10-28
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 6:25, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-11-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:25, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 7:35, 1-stop
Boeing 737-800 (73H)

Effective 2025-02-21 through 2025-03-02
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 7:35, 1-stop
Boeing 737-800 (73H)

Effective 2024-11-03 through 2024-11-10
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:40, 1-stop
Boeing 737-800 (73H)

Effective 2024-11-11 through 2024-11-25
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:40, 1-stop
Boeing 737-800 (73H)

Effective 2024-12-08 through 2024-12-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 5:40, 1-stop
Boeing 737-800 (73H)

Operates only on 2024-12-19
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 5:40, 1-stop
Boeing 737-800 (73H)

Operates only on 2025-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 5:40, 1-stop
Boeing 737-800 (73H)

Effective 2024-11-03 through 2024-11-10
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-11 through 2024-11-25
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-12-19
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 7:55, 1-stop
Boeing 737-800 (73H)

Effective 2025-02-21 through 2025-03-02
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 7:55, 1-stop
Boeing 737-800 (73H)

Effective 2024-10-03 through 2024-10-28
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 7:50, 1-stop
Boeing 737-800 (73H)

Operates only on 2024-11-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 7:50, 1-stop
Boeing 737-800 (73H)

Valid until 2024-09-30
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:55, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 6:50, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-21 through 2025-03-02
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 6:50, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:45, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-21 through 2025-03-02
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:45, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 6:05, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-23 through 2024-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:55, 1-stop
Boeing 737-700 (73W)

Effective 2024-12-21 through 2025-01-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:55, 1-stop
Boeing 737-700 (73W)

Effective 2024-10-03 through 2024-10-28
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 7:15, 1-stop
Boeing 737-800 (73H)

Effective 2025-02-13 through 2025-02-17
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 8:05, 1-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-21 through 2025-03-02
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 8:05, 1-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-09-08 through 2024-09-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-09-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-09-22
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-15 through 2025-03-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 7:45, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 6:00, 1-stop
Boeing 737-800 (73H)

Effective 2024-11-26 through 2024-12-02
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:55, 1-stop
Boeing 737-800 (73H)

Effective 2024-12-20 through 2025-01-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:55, 1-stop
Boeing 737-800 (73H)

Operates only on 2025-01-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:55, 1-stop
Boeing 737-800 (73H)

Valid until 2024-09-30
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 7:35, 1-stop
Boeing 737-800 (73H)

Valid until 2024-09-30
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 7:45, 1-stop
Boeing 737-800 (73H)

Effective 2024-11-03 through 2024-11-10
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 6:50, 1-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-11 through 2024-11-25
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 6:50, 1-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-08 through 2024-12-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 6:50, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-19
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 6:50, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:50, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 6:20, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 8:05, 2-stop
Boeing 737 MAX 8 (7M8)
prev        Page 7 / 8        next
  • A domestic route departing from the Orlando airport (MCO) and arriving at Denver airport (DEN).
  • The flight distance is 1543 miles, or 2483 km.
  • The timezone of the departure airport is UTC-5 , and the timezone of the arrival airport is UTC-7 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 3:50 and 4:25.