Southwest Airlines flights from Houston Hobby (HOU) to San Jose (SJC).

Select flight date:
FLIGHT SCHEDULE
Non-Direct Flights:
Fri 19:00 Houston Hobby (HOU) 22:35 San Jose (SJC) B
Southwest Airlines WN 52 1-stop Boeing 737-700 (73W) 5:35 Operates only on 2025-01-03
Sun 06:25 Houston Hobby (HOU) 10:00 San Jose (SJC) B
Southwest Airlines WN 416 1-stop Boeing 737-700 (73W) 5:35 Effective 2024-10-06 through 2024-10-27
Sun 09:25 Houston Hobby (HOU) 13:10 San Jose (SJC) B
Southwest Airlines WN 504 1-stop Boeing 737 MAX 8 (7M8) 5:45 Operates only on 2024-12-01
Sun 19:30 Houston Hobby (HOU) 22:55 San Jose (SJC) B
Southwest Airlines WN 735 1-stop Boeing 737-700 (73W) 5:25 Operates only on 2024-12-01
Thu,Fri,Sun 14:05 Houston Hobby (HOU) 18:05 San Jose (SJC) B
Southwest Airlines WN 1169 1-stop Boeing 737-700 (73W) 6:00 Effective 2025-01-12 through 2025-01-17
Mon,Sun 14:05 Houston Hobby (HOU) 18:05 San Jose (SJC) B
Southwest Airlines WN 1169 1-stop Boeing 737-700 (73W) 6:00 Effective 2025-01-20 through 2025-01-26
Thu,Fri,Sun 14:05 Houston Hobby (HOU) 18:05 San Jose (SJC) B
Southwest Airlines WN 1169 1-stop Boeing 737-700 (73W) 6:00 Effective 2025-02-02 through 2025-02-07
Mon 14:05 Houston Hobby (HOU) 18:05 San Jose (SJC) B
Southwest Airlines WN 1169 1-stop Boeing 737-700 (73W) 6:00 Operates only on 2025-02-10
Mon,Tue,Thu 14:05 Houston Hobby (HOU) 18:05 San Jose (SJC) B
Southwest Airlines WN 1169 1-stop Boeing 737-700 (73W) 6:00 Effective 2025-02-18 through 2025-02-24
Mon 14:05 Houston Hobby (HOU) 18:05 San Jose (SJC) B
Southwest Airlines WN 1169 1-stop Boeing 737-700 (73W) 6:00 Operates only on 2025-03-03
Sun 06:00 Houston Hobby (HOU) 09:25 San Jose (SJC) B
Southwest Airlines WN 1713 1-stop Boeing 737-700 (73W) 5:25 Effective 2024-10-06 through 2024-10-27
Sat 13:45 Houston Hobby (HOU) 17:25 San Jose (SJC) B
Southwest Airlines WN 1792 1-stop Boeing 737-700 (73W) 5:40 Effective 2024-10-05 through 2024-11-02
Mon,Thu,Fri 14:20 Houston Hobby (HOU) 18:00 San Jose (SJC) B
Southwest Airlines WN 1873 1-stop Boeing 737-700 (73W) 5:40 Effective 2024-10-03 through 2024-10-28
Fri 14:20 Houston Hobby (HOU) 18:00 San Jose (SJC) B
Southwest Airlines WN 1873 1-stop Boeing 737-700 (73W) 5:40 Operates only on 2024-11-01
Sun 05:00 Houston Hobby (HOU) 11:00 San Jose (SJC) B
Southwest Airlines WN 2085 1-stop Boeing 737 MAX 8 (7M8) 8:00 Operates only on 2024-12-01
Sun 18:50 Houston Hobby (HOU) 22:05 San Jose (SJC) B
Southwest Airlines WN 4142 1-stop Boeing 737-700 (73W) 5:15 Effective 2024-09-08 through 2024-09-29
Mon,Wed 17:55 Houston Hobby (HOU) 21:25 San Jose (SJC) B
Southwest Airlines WN 4681 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-11-04 through 2024-11-06
Tue,Wed 17:55 Houston Hobby (HOU) 21:25 San Jose (SJC) B
Southwest Airlines WN 4681 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-11-12 through 2024-11-20
Tue-Fri 17:55 Houston Hobby (HOU) 21:25 San Jose (SJC) B
Southwest Airlines WN 4681 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-11-29 through 2024-12-06
Mon-Thu 17:55 Houston Hobby (HOU) 21:25 San Jose (SJC) B
Southwest Airlines WN 4681 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-12-09 through 2024-12-18
Tue,Wed 17:55 Houston Hobby (HOU) 21:25 San Jose (SJC) B
Southwest Airlines WN 4681 1-stop Boeing 737-700 (73W) 5:30 Effective 2024-12-24 through 2025-01-01
Mon 17:55 Houston Hobby (HOU) 21:25 San Jose (SJC) B
Southwest Airlines WN 4681 1-stop Boeing 737-700 (73W) 5:30 Operates only on 2025-01-06
Mon,Thu,Fri 12:30 Houston Hobby (HOU) 16:50 San Jose (SJC) B
Southwest Airlines WN 606 2-stop Boeing 737-700 (73W) 6:20 Valid until 2024-09-30
Sat 16:00 Houston Hobby (HOU) 20:50 San Jose (SJC) B
Southwest Airlines WN 996 2-stop Boeing 737-700 (73W) 6:50 Effective 2025-02-15 through 2025-03-01
Mon-Wed 06:10 Houston Hobby (HOU) 11:30 San Jose (SJC) B
Southwest Airlines WN 1301 2-stop Boeing 737-700 (73W) 7:20 Effective 2024-11-26 through 2024-12-02
Mon,Thu,Fri,Sun 06:10 Houston Hobby (HOU) 11:30 San Jose (SJC) B
Southwest Airlines WN 1301 2-stop Boeing 737-700 (73W) 7:20 Effective 2024-12-20 through 2025-01-02
Sun 06:10 Houston Hobby (HOU) 11:30 San Jose (SJC) B
Southwest Airlines WN 1301 2-stop Boeing 737-700 (73W) 7:20 Operates only on 2025-01-05
Sun 16:20 Houston Hobby (HOU) 21:05 San Jose (SJC) B
Southwest Airlines WN 1683 2-stop Boeing 737-700 (73W) 6:45 Operates only on 2024-12-01
Thu,Fri,Sun 08:15 Houston Hobby (HOU) 14:35 San Jose (SJC) B
Southwest Airlines WN 2038 2-stop Boeing 737-700 (73W) 8:20 Effective 2024-11-03 through 2024-11-10
Mon,Thu,Fri,Sun 08:15 Houston Hobby (HOU) 14:35 San Jose (SJC) B
Southwest Airlines WN 2038 2-stop Boeing 737-700 (73W) 8:20 Effective 2024-11-11 through 2024-11-25
Fri,Sun 08:15 Houston Hobby (HOU) 14:35 San Jose (SJC) B
Southwest Airlines WN 2038 2-stop Boeing 737-700 (73W) 8:20 Effective 2024-12-08 through 2024-12-15
Thu 08:15 Houston Hobby (HOU) 14:35 San Jose (SJC) B
Southwest Airlines WN 2038 2-stop Boeing 737-700 (73W) 8:20 Operates only on 2024-12-19
Fri 08:15 Houston Hobby (HOU) 14:35 San Jose (SJC) B
Southwest Airlines WN 2038 2-stop Boeing 737-700 (73W) 8:20 Operates only on 2025-01-03
Sun 06:45 Houston Hobby (HOU) 12:25 San Jose (SJC) B
Southwest Airlines WN 4428 2-stop Boeing 737-700 (73W) 7:40 Operates only on 2024-12-01
Sat 18:10 Houston Hobby (HOU) 22:55 San Jose (SJC) B
Southwest Airlines WN 5232 2-stop Boeing 737-700 (73W) 6:45 Effective 2024-11-23 through 2024-11-30
Sat 18:10 Houston Hobby (HOU) 22:55 San Jose (SJC) B
Southwest Airlines WN 5232 2-stop Boeing 737-700 (73W) 6:45 Effective 2024-12-21 through 2025-01-04
Sat 16:00 Houston Hobby (HOU) 22:25 San Jose (SJC) B
Southwest Airlines WN 4 3-stop Boeing 737-700 (73W) 8:25 Effective 2024-11-23 through 2024-11-30
Sat 16:00 Houston Hobby (HOU) 22:25 San Jose (SJC) B
Southwest Airlines WN 4 3-stop Boeing 737-700 (73W) 8:25 Effective 2024-12-21 through 2025-01-04
Sat 07:50 Houston Hobby (HOU) 15:20 San Jose (SJC) B
Southwest Airlines WN 6 3-stop Boeing 737-700 (73W) 9:30 Effective 2024-10-05 through 2024-11-02
Sat 10:35 Houston Hobby (HOU) 16:45 San Jose (SJC) B
Southwest Airlines WN 1368 3-stop Boeing 737-700 (73W) 8:10 Effective 2024-11-09 through 2024-11-16
Sat 10:35 Houston Hobby (HOU) 16:45 San Jose (SJC) B
Southwest Airlines WN 1368 3-stop Boeing 737-700 (73W) 8:10 Effective 2024-12-07 through 2024-12-14
Mon-Wed 12:30 Houston Hobby (HOU) 20:00 San Jose (SJC) B
Southwest Airlines WN 4331 3-stop Boeing 737-700 (73W) 9:30 Effective 2024-11-04 through 2024-11-06
Tue,Wed 12:30 Houston Hobby (HOU) 20:00 San Jose (SJC) B
Southwest Airlines WN 4331 3-stop Boeing 737-700 (73W) 9:30 Effective 2024-11-12 through 2024-11-20
Tue-Fri 12:30 Houston Hobby (HOU) 20:00 San Jose (SJC) B
Southwest Airlines WN 4331 3-stop Boeing 737-700 (73W) 9:30 Effective 2024-11-29 through 2024-12-06
Mon-Thu 12:30 Houston Hobby (HOU) 20:00 San Jose (SJC) B
Southwest Airlines WN 4331 3-stop Boeing 737-700 (73W) 9:30 Effective 2024-12-09 through 2024-12-18
Tue,Wed 12:30 Houston Hobby (HOU) 20:00 San Jose (SJC) B
Southwest Airlines WN 4331 3-stop Boeing 737-700 (73W) 9:30 Effective 2024-12-24 through 2025-01-01
Mon 12:30 Houston Hobby (HOU) 20:00 San Jose (SJC) B
Southwest Airlines WN 4331 3-stop Boeing 737-700 (73W) 9:30 Operates only on 2025-01-06
prev   1 2


Southwest Airlines flights from Houston Hobby (HOU) to San Jose (SJC).
Select flight date:
FLIGHT SCHEDULE
Non-Direct Flights:

Operates only on 2025-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 5:35, 1-stop
Boeing 737-700 (73W)

Effective 2024-10-06 through 2024-10-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:35, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:45, 1-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:25, 1-stop
Boeing 737-700 (73W)

Effective 2025-01-12 through 2025-01-17
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Effective 2025-01-20 through 2025-01-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-02 through 2025-02-07
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-02-10
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Effective 2025-02-18 through 2025-02-24
Mon
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-03-03
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:00, 1-stop
Boeing 737-700 (73W)

Effective 2024-10-06 through 2024-10-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:25, 1-stop
Boeing 737-700 (73W)

Effective 2024-10-05 through 2024-11-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:40, 1-stop
Boeing 737-700 (73W)

Effective 2024-10-03 through 2024-10-28
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:40, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-11-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 5:40, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 8:00, 1-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-09-08 through 2024-09-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:15, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-04 through 2024-11-06
Mon
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-12 through 2024-11-20
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-29 through 2024-12-06
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Effective 2024-12-09 through 2024-12-18
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Effective 2024-12-24 through 2025-01-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-01-06
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Valid until 2024-09-30
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 6:20, 2-stop
Boeing 737-700 (73W)

Effective 2025-02-15 through 2025-03-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 6:50, 2-stop
Boeing 737-700 (73W)

Effective 2024-11-26 through 2024-12-02
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 7:20, 2-stop
Boeing 737-700 (73W)

Effective 2024-12-20 through 2025-01-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 7:20, 2-stop
Boeing 737-700 (73W)

Operates only on 2025-01-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 7:20, 2-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 6:45, 2-stop
Boeing 737-700 (73W)

Effective 2024-11-03 through 2024-11-10
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 8:20, 2-stop
Boeing 737-700 (73W)

Effective 2024-11-11 through 2024-11-25
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 8:20, 2-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 8:20, 2-stop
Boeing 737-700 (73W)

Operates only on 2024-12-19
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 8:20, 2-stop
Boeing 737-700 (73W)

Operates only on 2025-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 8:20, 2-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 7:40, 2-stop
Boeing 737-700 (73W)

Effective 2024-11-23 through 2024-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 6:45, 2-stop
Boeing 737-700 (73W)

Effective 2024-12-21 through 2025-01-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 6:45, 2-stop
Boeing 737-700 (73W)

Effective 2024-11-23 through 2024-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 8:25, 3-stop
Boeing 737-700 (73W)

Effective 2024-12-21 through 2025-01-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 8:25, 3-stop
Boeing 737-700 (73W)

Effective 2024-10-05 through 2024-11-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 9:30, 3-stop
Boeing 737-700 (73W)

Effective 2024-11-09 through 2024-11-16
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 8:10, 3-stop
Boeing 737-700 (73W)

Effective 2024-12-07 through 2024-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 8:10, 3-stop
Boeing 737-700 (73W)

Effective 2024-11-04 through 2024-11-06
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 9:30, 3-stop
Boeing 737-700 (73W)

Effective 2024-11-12 through 2024-11-20
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 9:30, 3-stop
Boeing 737-700 (73W)

Effective 2024-11-29 through 2024-12-06
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 9:30, 3-stop
Boeing 737-700 (73W)

Effective 2024-12-09 through 2024-12-18
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 9:30, 3-stop
Boeing 737-700 (73W)

Effective 2024-12-24 through 2025-01-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 9:30, 3-stop
Boeing 737-700 (73W)

Operates only on 2025-01-06
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 9:30, 3-stop
Boeing 737-700 (73W)
prev        Page 2 / 2
  • A domestic route departing from the Houston Hobby airport (HOU) and arriving at San Jose airport (SJC).
  • The flight distance is 1617 miles, or 2603 km.
  • The timezone of the departure airport is UTC-6 , and the timezone of the arrival airport is UTC-8 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 3:55 and 4:20.