Southwest Airlines flights from Birmingham (BHM) to Sacramento (SMF).

Select flight date:
FLIGHT SCHEDULE
Non-Direct Flights:
Mon-Wed 15:55 Birmingham (BHM) 20:35 Sacramento (SMF) B
Southwest Airlines WN 2074 1-stop Boeing 737-700 (73W) 6:40 Effective 2024-11-26 through 2024-12-02
Mon,Thu,Fri,Sun 15:55 Birmingham (BHM) 20:35 Sacramento (SMF) B
Southwest Airlines WN 2074 1-stop Boeing 737-700 (73W) 6:40 Effective 2024-12-20 through 2025-01-02
Sun 15:55 Birmingham (BHM) 20:35 Sacramento (SMF) B
Southwest Airlines WN 2074 1-stop Boeing 737-700 (73W) 6:40 Operates only on 2025-01-05
Thu,Fri,Sun 15:20 Birmingham (BHM) 19:55 Sacramento (SMF) B
Southwest Airlines WN 3911 1-stop Boeing 737-700 (73W) 6:35 Effective 2024-11-03 through 2024-11-10
Mon,Thu,Fri,Sun 15:20 Birmingham (BHM) 19:55 Sacramento (SMF) B
Southwest Airlines WN 3911 1-stop Boeing 737-700 (73W) 6:35 Effective 2024-11-11 through 2024-11-25
Fri,Sun 15:20 Birmingham (BHM) 19:55 Sacramento (SMF) B
Southwest Airlines WN 3911 1-stop Boeing 737-700 (73W) 6:35 Effective 2024-12-08 through 2024-12-15
Thu 15:20 Birmingham (BHM) 19:55 Sacramento (SMF) B
Southwest Airlines WN 3911 1-stop Boeing 737-700 (73W) 6:35 Operates only on 2024-12-19
Fri 15:20 Birmingham (BHM) 19:55 Sacramento (SMF) B
Southwest Airlines WN 3911 1-stop Boeing 737-700 (73W) 6:35 Operates only on 2025-01-03
Mon,Wed 15:15 Birmingham (BHM) 21:45 Sacramento (SMF) B
Southwest Airlines WN 1706 2-stop Boeing 737-700 (73W) 8:30 Effective 2024-11-04 through 2024-11-06
Tue,Wed 15:15 Birmingham (BHM) 21:45 Sacramento (SMF) B
Southwest Airlines WN 1706 2-stop Boeing 737-700 (73W) 8:30 Effective 2024-11-12 through 2024-11-20
Tue-Fri 15:15 Birmingham (BHM) 21:45 Sacramento (SMF) B
Southwest Airlines WN 1706 2-stop Boeing 737-700 (73W) 8:30 Effective 2024-11-29 through 2024-12-06
Mon-Thu 15:15 Birmingham (BHM) 21:45 Sacramento (SMF) B
Southwest Airlines WN 1706 2-stop Boeing 737-700 (73W) 8:30 Effective 2024-12-09 through 2024-12-18
Tue,Wed 15:15 Birmingham (BHM) 21:45 Sacramento (SMF) B
Southwest Airlines WN 1706 2-stop Boeing 737-700 (73W) 8:30 Effective 2024-12-24 through 2025-01-01
Mon 15:15 Birmingham (BHM) 21:45 Sacramento (SMF) B
Southwest Airlines WN 1706 2-stop Boeing 737-700 (73W) 8:30 Operates only on 2025-01-06
Tue,Wed 12:20 Birmingham (BHM) 18:40 Sacramento (SMF) B
Southwest Airlines WN 4313 2-stop Boeing 737-700 (73W) 8:20 Effective 2024-10-08 through 2024-10-30


Southwest Airlines flights from Birmingham (BHM) to Sacramento (SMF).
Select flight date:
FLIGHT SCHEDULE
Non-Direct Flights:

Effective 2024-11-26 through 2024-12-02
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 6:40, 1-stop
Boeing 737-700 (73W)

Effective 2024-12-20 through 2025-01-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 6:40, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-01-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 6:40, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-03 through 2024-11-10
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 6:35, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-11 through 2024-11-25
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 6:35, 1-stop
Boeing 737-700 (73W)

Effective 2024-12-08 through 2024-12-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 6:35, 1-stop
Boeing 737-700 (73W)

Operates only on 2024-12-19
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 6:35, 1-stop
Boeing 737-700 (73W)

Operates only on 2025-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 6:35, 1-stop
Boeing 737-700 (73W)

Effective 2024-11-04 through 2024-11-06
Mon
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 8:30, 2-stop
Boeing 737-700 (73W)

Effective 2024-11-12 through 2024-11-20
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 8:30, 2-stop
Boeing 737-700 (73W)

Effective 2024-11-29 through 2024-12-06
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 8:30, 2-stop
Boeing 737-700 (73W)

Effective 2024-12-09 through 2024-12-18
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 8:30, 2-stop
Boeing 737-700 (73W)

Effective 2024-12-24 through 2025-01-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 8:30, 2-stop
Boeing 737-700 (73W)

Operates only on 2025-01-06
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 8:30, 2-stop
Boeing 737-700 (73W)

Effective 2024-10-08 through 2024-10-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 8:20, 2-stop
Boeing 737-700 (73W)
  • A domestic route departing from the Birmingham airport (BHM) and arriving at Sacramento airport (SMF).
  • The flight distance is 1963 miles, or 3159 km.
  • The timezone of the departure airport is UTC-6 , and the timezone of the arrival airport is UTC-8 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.