Saudia flights from Jeddah (JED) to Lahore (LHE).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Tue,Wed,Fri,Sun 07:25 Jeddah (JED) 1 14:20 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:55 Effective 2024-09-10 through 2024-09-20
Tue,Fri,Sun 07:25 Jeddah (JED) 1 14:20 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777 (777) 4:55 Effective 2024-09-22 through 2024-09-29
Wed 07:25 Jeddah (JED) 1 14:20 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:55 Operates only on 2024-09-25
Tue,Fri 07:30 Jeddah (JED) 1 14:25 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:55 Valid until 2024-09-03
Wed,Fri 07:30 Jeddah (JED) 1 14:25 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:55 Effective 2024-09-04 through 2024-09-06
Tue,Wed,Fri,Sun 07:30 Jeddah (JED) 1 14:25 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:55 Effective 2024-10-01 through 2024-10-09
Fri 07:30 Jeddah (JED) 1 14:25 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777 (777) 4:55 Operates only on 2024-10-11
Tue,Wed,Fri,Sun 07:30 Jeddah (JED) 1 14:25 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:55 Effective 2024-10-13 through 2024-10-18
Tue,Fri,Sun 07:30 Jeddah (JED) 1 14:25 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777 (777) 4:55 Effective 2024-10-20 through 2024-10-25
Wed 07:30 Jeddah (JED) 1 14:25 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:55 Operates only on 2024-10-23
Mon,Thu,Sat 10:00 Jeddah (JED) 1 16:40 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-10-28 through 2024-11-14
Fri 10:00 Jeddah (JED) 1 16:40 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777 (777) 4:40 Effective 2024-11-01 through 2024-11-08
Mon,Thu-Sat 10:00 Jeddah (JED) 1 16:40 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-11-15 through 2024-11-28
Fri,Sat 10:00 Jeddah (JED) 1 16:40 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777 (777) 4:40 Effective 2024-11-29 through 2024-12-14
Mon,Thu 10:00 Jeddah (JED) 1 16:40 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-12-02 through 2024-12-12
Mon,Fri 10:00 Jeddah (JED) 1 16:40 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777 (777) 4:40 Effective 2024-12-16 through 2024-12-20
Mon,Thu,Sat 10:00 Jeddah (JED) 1 16:40 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-12-19 through 2025-03-29
Fri 10:00 Jeddah (JED) 1 16:40 Lahore (LHE) M
Saudia SV 732 Non-stop Boeing 777 (777) 4:40 Effective 2024-12-27 through 2025-03-28
Daily 02:10 Jeddah (JED) 1 09:05 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:55 Valid until 2024-09-03
Wed 02:10 Jeddah (JED) 1 09:05 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777 (777) 4:55 Operates only on 2024-09-04
Daily 02:10 Jeddah (JED) 1 09:05 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:55 Effective 2024-09-05 through 2024-09-30
Tue 02:10 Jeddah (JED) 1 09:05 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777 (777) 4:55 Operates only on 2024-10-01
Daily 02:10 Jeddah (JED) 1 09:05 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:55 Effective 2024-10-02 through 2024-10-26
Daily 02:10 Jeddah (JED) 1 09:05 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:55 Effective from 2025-03-31
Mon-Wed,Fri-Sun 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-10-27 through 2024-11-13
Thu 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777 (777) 4:40 Effective 2024-10-31 through 2024-11-07
Tue-Sun 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-11-14 through 2024-11-21
Mon,Fri 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777 (777) 4:40 Effective 2024-11-18 through 2024-11-25
Tue-Sun 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-11-23 through 2024-12-01
Mon,Wed-Sat 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-12-02 through 2024-12-07
Mon,Tue,Sun 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777 (777) 4:40 Effective 2024-12-03 through 2024-12-09
Tue-Sun 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-12-10 through 2024-12-22
Mon 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777 (777) 4:40 Operates only on 2024-12-16
Mon-Fri,Sun 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-12-23 through 2024-12-29
Mon,Sat 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777 (777) 4:40 Effective 2024-12-28 through 2024-12-30
Tue-Sun 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-12-31 through 2025-03-29
Mon 03:20 Jeddah (JED) 1 10:00 Lahore (LHE) M
Saudia SV 734 Non-stop Boeing 777 (777) 4:40 Effective 2025-01-06 through 2025-03-24
Mon-Wed,Fri-Sun 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-10-28 through 2024-11-04
Tue,Thu 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777 (777) 4:40 Effective 2024-10-31 through 2024-11-07
Mon-Wed,Fri-Sun 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-11-06 through 2024-11-13
Mon,Tue,Thu-Sun 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-11-14 through 2024-11-24
Mon,Wed 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777 (777) 4:40 Effective 2024-11-20 through 2024-11-25
Mon-Wed,Fri,Sat 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-11-26 through 2024-12-04
Thu,Sun 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777 (777) 4:40 Effective 2024-11-28 through 2024-12-01
Tue-Sat 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-12-05 through 2024-12-21
Mon,Sun 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777 (777) 4:40 Effective 2024-12-08 through 2024-12-16
Tue-Sun 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777-300 (773) 4:40 Effective 2024-12-22 through 2025-02-19
Mon 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777 (777) 4:40 Effective 2024-12-23 through 2025-02-17
Mon,Thu 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777 (777) 4:40 Effective 2025-02-20 through 2025-02-24
Tue-Sun 17:15 Jeddah (JED) 1 23:55 Lahore (LHE) M
Saudia SV 738 Non-stop Boeing 777-300 (773) 4:40 Effective 2025-02-21 through 2025-03-29
1 2   next


Saudia flights from Jeddah (JED) to Lahore (LHE).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

07:25

14:20
Effective 2024-09-10 through 2024-09-20
Mon
-
Tue
Wed
Thu
-
Fri
Sat
-
Sun
Duration: 4:55, non-stop
Boeing 777-300 (773)

07:25

14:20
Effective 2024-09-22 through 2024-09-29
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:55, non-stop
Boeing 777 (777)

07:25

14:20
Operates only on 2024-09-25
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:55, non-stop
Boeing 777-300 (773)

07:30

14:25
Valid until 2024-09-03
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Boeing 777-300 (773)

07:30

14:25
Effective 2024-09-04 through 2024-09-06
Mon
-
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Boeing 777-300 (773)

07:30

14:25
Effective 2024-10-01 through 2024-10-09
Mon
-
Tue
Wed
Thu
-
Fri
Sat
-
Sun
Duration: 4:55, non-stop
Boeing 777-300 (773)

07:30

14:25
Operates only on 2024-10-11
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:55, non-stop
Boeing 777 (777)

07:30

14:25
Effective 2024-10-13 through 2024-10-18
Mon
-
Tue
Wed
Thu
-
Fri
Sat
-
Sun
Duration: 4:55, non-stop
Boeing 777-300 (773)

07:30

14:25
Effective 2024-10-20 through 2024-10-25
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:55, non-stop
Boeing 777 (777)

07:30

14:25
Operates only on 2024-10-23
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:55, non-stop
Boeing 777-300 (773)

10:00

16:40
Effective 2024-10-28 through 2024-11-14
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 4:40, non-stop
Boeing 777-300 (773)

10:00

16:40
Effective 2024-11-01 through 2024-11-08
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

10:00

16:40
Effective 2024-11-15 through 2024-11-28
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
-
Duration: 4:40, non-stop
Boeing 777-300 (773)

10:00

16:40
Effective 2024-11-29 through 2024-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

10:00

16:40
Effective 2024-12-02 through 2024-12-12
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777-300 (773)

10:00

16:40
Effective 2024-12-16 through 2024-12-20
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

10:00

16:40
Effective 2024-12-19 through 2025-03-29
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 4:40, non-stop
Boeing 777-300 (773)

10:00

16:40
Effective 2024-12-27 through 2025-03-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

02:10

09:05
Valid until 2024-09-03
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Boeing 777-300 (773)

02:10

09:05
Operates only on 2024-09-04
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:55, non-stop
Boeing 777 (777)

02:10

09:05
Effective 2024-09-05 through 2024-09-30
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Boeing 777-300 (773)

02:10

09:05
Operates only on 2024-10-01
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:55, non-stop
Boeing 777 (777)

02:10

09:05
Effective 2024-10-02 through 2024-10-26
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Boeing 777-300 (773)

02:10

09:05
Effective from 2025-03-31
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:55, non-stop
Boeing 777-300 (773)

03:20

10:00
Effective 2024-10-27 through 2024-11-13
Mon
Tue
Wed
Thu
-
Fri
Sat
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)

03:20

10:00
Effective 2024-10-31 through 2024-11-07
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

03:20

10:00
Effective 2024-11-14 through 2024-11-21
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)

03:20

10:00
Effective 2024-11-18 through 2024-11-25
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

03:20

10:00
Effective 2024-11-23 through 2024-12-01
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)

03:20

10:00
Effective 2024-12-02 through 2024-12-07
Mon
Tue
-
Wed
Thu
Fri
Sat
Sun
-
Duration: 4:40, non-stop
Boeing 777-300 (773)

03:20

10:00
Effective 2024-12-03 through 2024-12-09
Mon
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:40, non-stop
Boeing 777 (777)

03:20

10:00
Effective 2024-12-10 through 2024-12-22
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)

03:20

10:00
Operates only on 2024-12-16
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

03:20

10:00
Effective 2024-12-23 through 2024-12-29
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)

03:20

10:00
Effective 2024-12-28 through 2024-12-30
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

03:20

10:00
Effective 2024-12-31 through 2025-03-29
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)

03:20

10:00
Effective 2025-01-06 through 2025-03-24
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

17:15

23:55
Effective 2024-10-28 through 2024-11-04
Mon
Tue
Wed
Thu
-
Fri
Sat
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)

17:15

23:55
Effective 2024-10-31 through 2024-11-07
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

17:15

23:55
Effective 2024-11-06 through 2024-11-13
Mon
Tue
Wed
Thu
-
Fri
Sat
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)

17:15

23:55
Effective 2024-11-14 through 2024-11-24
Mon
Tue
Wed
-
Thu
Fri
Sat
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)

17:15

23:55
Effective 2024-11-20 through 2024-11-25
Mon
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

17:15

23:55
Effective 2024-11-26 through 2024-12-04
Mon
Tue
Wed
Thu
-
Fri
Sat
Sun
-
Duration: 4:40, non-stop
Boeing 777-300 (773)

17:15

23:55
Effective 2024-11-28 through 2024-12-01
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
Duration: 4:40, non-stop
Boeing 777 (777)

17:15

23:55
Effective 2024-12-05 through 2024-12-21
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
-
Duration: 4:40, non-stop
Boeing 777-300 (773)

17:15

23:55
Effective 2024-12-08 through 2024-12-16
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:40, non-stop
Boeing 777 (777)

17:15

23:55
Effective 2024-12-22 through 2025-02-19
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)

17:15

23:55
Effective 2024-12-23 through 2025-02-17
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

17:15

23:55
Effective 2025-02-20 through 2025-02-24
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:40, non-stop
Boeing 777 (777)

17:15

23:55
Effective 2025-02-21 through 2025-03-29
Mon
-
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:40, non-stop
Boeing 777-300 (773)
Page 1 / 2        next
  • An international route departing from Jeddah airport, Saudi Arabia (JED) and arriving at Lahore airport, Pakistan (LHE).
  • The flight distance is 2268 miles, or 3651 km.
  • The timezone of the departure airport is UTC+3 , and the timezone of the arrival airport is UTC+5 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 4:40 and 4:55.