Nouvelair Tunisie flights from Tunis (TUN) to Madrid (MAD).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sun 15:30 Tunis (TUN) 17:50 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320neo (32N) 2:20 Operates only on 2024-11-03
Sun 15:30 Tunis (TUN) 17:50 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-11-10 through 2025-03-23
Thu 17:00 Tunis (TUN) 19:20 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-10-31 through 2024-12-05
Thu 17:00 Tunis (TUN) 19:20 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320neo (32N) 2:20 Operates only on 2024-12-12
Thu 17:00 Tunis (TUN) 19:20 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Operates only on 2024-12-19
Thu 17:00 Tunis (TUN) 19:20 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320neo (32N) 2:20 Effective 2024-12-26 through 2025-01-09
Thu 17:00 Tunis (TUN) 19:20 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2025-01-16 through 2025-03-27
Mon 17:15 Tunis (TUN) 20:35 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-09-16 through 2024-10-21
Fri 17:55 Tunis (TUN) 21:15 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-10-04 through 2024-10-25
Fri 18:15 Tunis (TUN) 21:35 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-09-20 through 2024-09-27
Fri 19:45 Tunis (TUN) 23:05 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-09-06 through 2024-09-13
Mon 20:50 Tunis (TUN) 00:10 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Valid until 2024-09-09
The flight arrives 1 day after departure.


Nouvelair Tunisie flights from Tunis (TUN) to Madrid (MAD).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Operates only on 2024-11-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Airbus A320neo (32N)

Effective 2024-11-10 through 2025-03-23
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-10-31 through 2024-12-05
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Operates only on 2024-12-12
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320neo (32N)

Operates only on 2024-12-19
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-12-26 through 2025-01-09
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320neo (32N)

Effective 2025-01-16 through 2025-03-27
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-09-16 through 2024-10-21
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-10-04 through 2024-10-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-09-20 through 2024-09-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-09-06 through 2024-09-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)

20:50

00:10(+1)
Valid until 2024-09-09
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:20, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.
  • An international route departing from Tunis airport, Tunisia (TUN) and arriving at Madrid airport, Spain (MAD).
  • The flight distance is 783 miles, or 1261 km.
  • The timezone of both the departure and the arrival airports is UTC+1 . Current time at both airports is (loading...).
  • For direct flights, the flight time is 2:20.